I drove US 98 this morning early and noticed the project to bring SR-158 up to the MS line is going well. ALDOT has been working on the MS side from the end of the four-lane and has paved the eastbound lanes all the way up to the previously unused bridge, put up guardrails for the bridge approaches, and is getting ready to bring four lanes of traffic over to the new alignment. I’m not sure how far those four lanes will travel beyond the clearing before it drops back to two but I’m glad to see Alabama finally put the bridge to use. Of note, either MDOT or ALDOT has removed the two big yellow signs on the MS side that said “FOUR-LANE ENDS 1 MILE” .
Further down 98, it seems a paving project is underway between Wilmer and Semmes. Makes me wonder if they could’ve just used that money to pave two extra lanes on the new alignment.
Another thing I’m wondering is if ALDOT will apply to have the US 98 route designation moved to the new alignment when the full two-lane facility is constructed, or if they will elect to let it remain SR-158 until the full four lanes is built.