Here is a list of road improvements (mostly) that the Alabama Comprehensive Economic Development Strategy has outlined.
North-South Corridor. Construct North-South Corridor through West Alabama.
Still touting that Pipe dream? Listed separately from:
Corridor Study for West Alabama Freeway. Complete north-south corridor/environmental study for controlled access highway connecting the Shoals to Mobile.
U.S. Highway 431. Widen U.S. Highway 431 to four lanes from I-20 to I-85.
Given its indirect path between Opelika and Anniston, I don't see how four-laning this route is needed.
Montgomery Southern Outer Loop. Complete the outer loop to improve transportation access for communities south of Montgomery.
You should see the progress in the flyovers at I-85 now. Some of the ramps are way up there!
Macon County Interstate Exit. Develop an additional exit in Macon County along Interstate 85.
From a traffic flow standpoint, I-85 does not need anymore exits right now...
I-10 Connector. Construct an Interstate Connector to I-10.
Pipe dream #2.
I-10 Mobile River Bridge. Six lane interstate bridge over the Mobile River and Bayway improvements.
No local news on this in a couple of years now...
Outer Loop – Northern and Southern Loops. Connector from I-85 to I-65 North and South.
There should be a better connection between I-85 or 65 to Wetumpka. US 231 is fairly developed from East Boulevard northward to the Wetumpka bypass. Have not taken Alabama 14 between Prattville and Wetumpka, but I am sure its loaded with sprawl.
Exit 50 on I-85. Addition of Exit 50 on Interstate I-85 in Auburn AL. The new exit will increase transportation access into and out of three Auburn Technology Parks.
Opened last month.
U.S. Highway 231 Access Management/4-Lane Vaughn Rd. Access management of Hwy 231 through Troy/4-lane Vaughn Rd from Montgomery to Bullock County.
Seems like a good idea, but $5 million won't cover much.
Corridor V Memphis to Atlanta Highway. Develop interstate grade highway corridor.
Pipe dream #3.