News:

Thank you for your patience during the Forum downtime while we upgraded the software. Welcome back and see this thread for some new features and other changes to the forum.

Main Menu

SE Houston: Which fix you think will happen first: E. Orem Dr or Almeda-Genoa Rd

Started by TheBox, April 03, 2024, 10:10:58 PM

Previous topic - Next topic

Which one you think will happen in SE Houston first? Extending E. Orem Dr or Expanding Almeda-Genoa Rd?

Extending E. Orem Dr from west of Cullen Blvd all the way to SH 288, finally connecting with W. Orem Dr
0 (0%)
Expanding Almeda-Genoa Rd from 2 lanes to 4 lanes, between SH 288 and MLK Blvd if not Mykawa Rd
0 (0%)
Neither; City of Houston has other plans
2 (100%)

Total Members Voted: 2

Voting closes: May 03, 2024, 10:10:58 PM

TheBox

As someone who grew up in SE Houston, there's these two roads that are kinda opposites of each

E. Orem Dr is 4-lane divided but doesn't reallly go past Cullen Blvd (let alone all the way to SH 288)

Almeda-Genoa Rd has weekly truck traffic, 45 speed limit, and even connects from Telephone Rd all the way to SH 288 but is a 2-lane road with ditches, all the way through.

Both of these are long overdue for a update, but which one you think will happen first?
Wake me up when they upgrade US-290 between the state's largest city and growing capital into expressway standards if it interstate standards.

Giddings bypass, Elgin bypass, and Elgin-Manor freeway/tollway when?



Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.