AARoads Forum

Please login or register.

Login with username, password and session length
Advanced search  

News:

Thanks to everyone for the feedback on what errors you encountered at https://www.aaroads.com/forum/index.php?topic=33904.0
Corrected several already and appreciate your patience as we work through the rest.

Author Topic: Timeline of road projects  (Read 819 times)

Albert

  • *
  • Offline Offline

  • Posts: 13
  • Location: Coos Bay, OR
  • Last Login: September 06, 2022, 01:36:00 PM
Timeline of road projects
« on: July 28, 2022, 02:22:39 PM »

OR 42 project Adams to Finley: 2021 - Leveled parts of highway bypass (built 1990s) that are 6 ft. higher than level and restriped

Replaced some Curb ramps

East of Coquille: Highway ground, repaved, and restriped to include a Center Turn Lane

2022 - Replaced some more curb ramps and built a new pedestrian island

Already leveled, older bypass parts ground and repaved, then new overlay put on top of that and existing pavement and striped

Project completion - Sep. 2022
Logged

 


Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.