Thankfully, a six-lane US 1 between Quantico and the Occoquan River is nearing completion, so not much more damage can be done (but unfortunately I happen to live along one of the final stretches of four-lane US 1- between Cardinal Drive/Neabsco Road and Dumfries Road- so years of construction right outside my neighborhood is going to be real fun).
Is there a timetable yet for when that final stretch will actually be constructed? Have not seen or heard anything.
Moving forward road project wise, I would like to see Prince William prioritize funding the following projects next:
1. Van Buren Road Extension
2. Finishing the six-laning of US-1
3. Building an interchange at VA-234/Sudley Manor Drive (with a Wellington Road overpass)
4. Adding a designated right turn lane at VA-55/Catharpin Road
The NVTA and perhaps the next county road bond would probably be the most likely funding sources. While the US-15 two lane choke at the grade separated railroad crossing in Haymarket is certainly annoying, it is still not as needed imo as the projects above.