Author Topic: Okemos Rd. Camelback Bridge in Okemos, Mich. closure/demolition to begin  (Read 2548 times)

hockeyjohn

  • *
  • Offline Offline

  • Posts: 82
  • Location: Noblesville, Ind.
  • Last Login: February 20, 2024, 10:40:24 AM

The replacement of the 1924 camelback bridge on NB Okemos Rd. will soon begin.   It's a real shame to see another one of these historic structures go.

https://www.wilx.com/2022/01/27/okemos-road-bridge-over-red-cedar-river-close-through-nov-2022/

Some background about the bridge from MDOT.

https://www.michigan.gov/mdot/0,4616,7-151-9623_11154_11188-28752--,00.html
Logged

Max Rockatansky

  • *
  • Online Online

  • Posts: 24733
  • Age: 41
  • Location: Route 9, Sector 26
  • Last Login: February 21, 2024, 11:55:41 PM
    • Gribblenation
Re: Okemos Rd. Camelback Bridge in Okemos, Mich. closure/demolition to begin
« Reply #1 on: February 01, 2022, 10:52:57 AM »

That sucks, I used to drive over that bridge a ton when I sent to High School in Dewitt.
Logged

NWI_Irish96

  • *
  • Offline Offline

  • Posts: 7613
  • Age: 50
  • Location: Munster, IN
  • Last Login: February 21, 2024, 06:22:21 PM
    • Travel Mapping
Re: Okemos Rd. Camelback Bridge in Okemos, Mich. closure/demolition to begin
« Reply #2 on: February 01, 2022, 10:55:08 AM »

That sucks, I used to drive over that bridge a ton when I sent to High School in Dewitt.

I used to drive over that bridge to go to the Travelers Club and Tuba Museum, which I understand is now closed.
Logged
Indiana: counties 100%, highways 100%
Illinois: counties 100%, highways 59%
Michigan: counties 100%, highways 56%
Wisconsin: counties 86%, highways 23%

GaryV

  • *
  • Offline Offline

  • Posts: 3703
  • Location: Southeast Michigan
  • Last Login: February 21, 2024, 06:35:31 PM
Re: Okemos Rd. Camelback Bridge in Okemos, Mich. closure/demolition to begin
« Reply #3 on: February 01, 2022, 12:02:05 PM »

The camelback bridge on Cleveland Street (old US-16, even older M-16) near Nunica MI is still there.
Logged

walteronboard

  • *
  • Offline Offline

  • Posts: 1
  • Location: London
  • Last Login: April 17, 2023, 04:54:49 AM



The project is expected was expected to begin in the summer of 2021 and be completed in the fall of 2021. The estimated cost of the project is $7.2 million. The Ingham County Road Commission will be responsible for all costs associated with the project.
Bridge demolition is not an easy task you know!!
This project includes the replacement of the existing northbound and southbound structures with a 5 lane, single span bridge including a pedestrian facility along the east side, along with bridge approach and Mt. Hope intersection reconstruction, traffic signal and sidewalk/ramp reconstruction.
Logged

JREwing78

  • *
  • Offline Offline

  • Posts: 1767
  • Location: Janesville, WI
  • Last Login: February 21, 2024, 10:56:08 PM

The replacement bridge fully opened to traffic March 23rd, but not without a lot of drama and extra costs. This article from the Lansing State Journal has some details: https://www.lansingstatejournal.com/story/news/local/2023/03/08/okemos-road-bridge-replacement-over-budget-by-nearly-200000-construction-meridian-township-ingham/69968946007/

More from the opening day: https://www.wkar.org/wkar-news/2023-03-23/rebuilt-okemos-road-bridge-is-now-open


Logged

JREwing78

  • *
  • Offline Offline

  • Posts: 1767
  • Location: Janesville, WI
  • Last Login: February 21, 2024, 10:56:08 PM

Some video from Meridian Township showing construction: