US 10/WI 441 upgrade thread!

Started by mgk920, June 26, 2014, 10:20:45 AM

Previous topic - Next topic

msunat97

Are there any new updates on the bridge construction?  Does anyone have a link to the project timeline?


Alex

Quote from: msunat97 on June 15, 2016, 09:43:08 AM
Are there any new updates on the bridge construction?  Does anyone have a link to the project timeline?

Here is the project timeline:
http://projects.511wi.gov/wis441/wp-content/uploads/sites/107/2016-0523_OPT2_59243_WIS_441_24x36_Project_Improvements_Timeline_v1.pdf

I followed @WIS441I41News with AARoads to keep up on the project.

mgk920

#77
Quote from: Alex on June 15, 2016, 09:47:33 AM
Quote from: msunat97 on June 15, 2016, 09:43:08 AM
Are there any new updates on the bridge construction?  Does anyone have a link to the project timeline?

Here is the project timeline:
http://projects.511wi.gov/wis441/wp-content/uploads/sites/107/2016-0523_OPT2_59243_WIS_441_24x36_Project_Improvements_Timeline_v1.pdf

I followed @WIS441I41News with AARoads to keep up on the project.

Crews have been cutting in the new US 10/WI 441 bridges over the future Racine St access roadway over the past few days.  Westbound was done overnight Sat-Sun (11-12 June) and I'll have to check, but they may have 'flipped' the eastbound side overnight last night (Tue-Wed).  When this is complete, traffic will be using the westbound side of the new bridges.

Mike

msunat97

Thanks guys.  I'm up there for business about 2x per month, but haven't researched this project.

peterj920

Quote from: mgk920 on June 15, 2016, 10:14:57 AM
Quote from: Alex on June 15, 2016, 09:47:33 AM
Quote from: msunat97 on June 15, 2016, 09:43:08 AM
Are there any new updates on the bridge construction?  Does anyone have a link to the project timeline?

Here is the project timeline:
http://projects.511wi.gov/wis441/wp-content/uploads/sites/107/2016-0523_OPT2_59243_WIS_441_24x36_Project_Improvements_Timeline_v1.pdf

I followed @WIS441I41News with AARoads to keep up on the project.

Crews have been cutting in the new US 10/WI 441 bridges over the future Racine St access roadway over the past few days.  Westbound was done overnight Sat-Sun (11-12 June) and I'll have to check, but they may have 'flipped' the eastbound side overnight last night (Tue-Wed).  When this is complete, traffic will be using the westbound side of the new bridges.

Mike

You mean the traffic will be using the new eastbound bridge while the old one is rehabbed?  The old bridge is going to carry westbound traffic only while the new one will carry eastbound traffic when the project is complete. 

mgk920

Quote from: peterj920 on June 16, 2016, 01:45:13 AM
Quote from: mgk920 on June 15, 2016, 10:14:57 AM
Quote from: Alex on June 15, 2016, 09:47:33 AM
Quote from: msunat97 on June 15, 2016, 09:43:08 AM
Are there any new updates on the bridge construction?  Does anyone have a link to the project timeline?

Here is the project timeline:
http://projects.511wi.gov/wis441/wp-content/uploads/sites/107/2016-0523_OPT2_59243_WIS_441_24x36_Project_Improvements_Timeline_v1.pdf

I followed @WIS441I41News with AARoads to keep up on the project.

Crews have been cutting in the new US 10/WI 441 bridges over the future Racine St access roadway over the past few days.  Westbound was done overnight Sat-Sun (11-12 June) and I'll have to check, but they may have 'flipped' the eastbound side overnight last night (Tue-Wed).  When this is complete, traffic will be using the westbound side of the new bridges.

Mike

You mean the traffic will be using the new eastbound bridge while the old one is rehabbed?  The old bridge is going to carry westbound traffic only while the new one will carry eastbound traffic when the project is complete.

No, this is at the interchange just east of the river bridge.  The 'flip' for the river bridge happens in late summer or early fall.

Mike

peterj920

I drove the new stretch yesterday over the new Racine St interchange and see what you meant.  When traffic is switched over to the new bridge it looks like there is going to be a pretty sharp transition and traffic is probably going to back up.  I have a couple of pictures below. 




peterj920









The new US 10/Wis 441 Little Lake Butte Des Mortes Bridge opened to traffic today for I-41 north to US 10 east/Wis 441 traffic north traffic today.  In the next few weeks, all traffic will be switched to the eventual eastbound bridge while the old bridge is rehabbed to handle westbound traffic. 

The Ghostbuster

Maybe during the next signage replacement project, they could give the WI 441 solo segment exit numbers. They should have had them from the get-go IMHO.

peterj920

Quote from: The Ghostbuster on October 17, 2016, 04:58:49 PM
Maybe during the next signage replacement project, they could give the WI 441 solo segment exit numbers. They should have had them from the get-go IMHO.

WIS 441 has had mileage numbers for years, but no exit numbers for some reason.  After exit numbers and mile markers for US 10 were added, the Wis 441 numbers were kept and replaced with new signs, resulting in that stretch having 2 different mile markers.

The Ghostbuster

Erroneous US 10 exit numbers and mile markers at that.

msunat97

Is the project still on track?

mgk920


invincor

Quote from: The Ghostbuster on October 18, 2016, 05:42:52 PM
Erroneous US 10 exit numbers and mile markers at that.

What's the error?

triplemultiplex

Quote from: invincor on October 19, 2017, 12:46:57 PM
Quote from: The Ghostbuster on October 18, 2016, 05:42:52 PM
Erroneous US 10 exit numbers and mile markers at that.

What's the error?

They don't correspond to the physical mileage of US 10 in Wisconsin.  By a LOT.
If you measure actual mileage of US 10, the mile markers and exit numbers would put 0 somewhere around Coon Rapids, Minnesota.
"That's just like... your opinion, man."

The Ghostbuster

I got my mileage information on US 10 from Wikipedia. It says that the very first exit on US 10 in Wisconsin in Marshfield (STH-13 north and CTH-A south) is numbered Exit 186, although Wikipedia calculates the exit's mileage from the Minnesota/Wisconsin state line is 146.95 miles, a difference of about 40 miles from the exit number. I know Wikipedia is not the most reliable source of information, but I suspect the mileage calculations are accurate. Source: https://en.wikipedia.org/wiki/U.S._Route_10_in_Wisconsin.

invincor

I just did a cursory check using the official state highway map, and that 40-mile error looks about right. 
I wondered if it could've been calculated using US 10's historical routing where it joined with US 12 to Hudson, but that mileage works out about the same as the current one, so that's not where it came from. 

Anyone have any ideas how this wide of an error got introduced? 

The Ghostbuster

Maybe a mileage miscalculation by WISDOT? As for the co-designation of US 10 with US 12 from Humbird to Hudson (enroute to St. Paul, MN), that only lasted from 1926-1934, so I doubt it was a factor in why the exits on US 10 are off the actual mileage by about 40 miles. All things considered, the current exit numbers on US 10 are likely here to stay.



Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.