I 40 Construction in Sallisaw Oklahoma

Started by robbones, January 27, 2019, 05:17:50 PM

Previous topic - Next topic

US71

Quote from: robbones on November 26, 2020, 04:53:34 PM
I'll get some pictures tomorrow of the construction progress. Currently both EB and WB traffic are back on their separate carriageways. The interchange on US 64 is about 75% complete with the traffic on the new on and off ramps.




I've been meaning to check it out, have not made it over there.
Like Alice I Try To Believe Three Impossible Things Before Breakfast


robbones

Current construction progress on I 40 WB in Sallisaw, OK

SM-G960U1


robbones


robbones


Plutonic Panda

Thank you for the pics! Looking good out there

rte66man

I had no idea they were also doing so much work on 64 as well as 40.  Was hoping they would be done before the winter but progress is being made. Thanks for the pics.
When you come to a fork in the road... TAKE IT.

                                                               -Yogi Berra

SoonerCowboy

Very nice pics. I was out that way back in September, and I can see a lot of progress made.

robbones

Construction is about 90% complete. All the roads are completed and the interchange of I-40 and US 64. Below are the pictures from US 64.

SM-G960U1


robbones

I 40 EB from the US 64 on ramp

SM-G960U1


robbones

I 40 WB from the US 64 interchange

SM-G960U1


rte66man

Looks about 90% done. Thanks for the pics.
When you come to a fork in the road... TAKE IT.

                                                               -Yogi Berra