News:

Thank you for your patience during the Forum downtime while we upgraded the software. Welcome back and see this thread for some new features and other changes to the forum.

Main Menu

Vermont

Started by Alex, January 29, 2009, 04:48:50 PM

Previous topic - Next topic

froggie

Quote from: astralentityWhat I'm seeing is they're using the "Town of xx" signs on surface roads, like my example above at the Shoreham/Addison line on VT 22A.

The problem here is that Shoreham and Addison aren't adjacent.  Bridport is in between.  Did you mean Addison/Bridport?  I'm not aware of anything at that location.

A photo of the sign in question would help.


astralentity

Quote from: froggie on February 01, 2020, 01:09:32 PM
Quote from: astralentityWhat I'm seeing is they're using the "Town of xx" signs on surface roads, like my example above at the Shoreham/Addison line on VT 22A.

The problem here is that Shoreham and Addison aren't adjacent.  Bridport is in between.  Did you mean Addison/Bridport?  I'm not aware of anything at that location.

A photo of the sign in question would help.

Yes, you're correct.  I had a jumble of things in my head at the time I posted.  It's the Addison/Bridport line heading north on 22A.  Next time I'm there I'll take a pic.

I guess that's what happens when you've traveled the entirety of 22A from Granville to Ferrisburgh and back several times in your life  :spin:

bob7374

VTrans has created a webpage devoted to its upcoming placement of 'milepoint' exit number signs throughout the state. Like MassDOT they created an interactive map that shows the new milepost exit number and the corresponding, to be kept, for now, sequential number. They also have exit lists by highway, including for US 4 and US 7 and VT 289 (showing no new numbers). They are assigning the milepost exit numbers to all exits, even interstate to interstate, for example the I-93 milepost numbers for the I-91 exit will be 11 A and B.

The website: https://vtrans.vermont.gov/projects/exit-numbering

shadyjay

Still think its a waste of time and money.  They're going through the trouble to make these new signs, which I think will just add to the confusion.  Instead, they could've made this website to educate the public on the new mile-based exits, then gone around and slapped up the new numbers on the existing signs, except replacing a few gores/tabs which are too small to accommodate 3 digits. 

But I digress...

amroad17

Quote from: shadyjay on April 21, 2020, 12:07:55 AM
Still think its a waste of time and money.  They're going through the trouble to make these new signs, which I think will just add to the confusion.  Instead, they could've made this website to educate the public on the new mile-based exits, then gone around and slapped up the new numbers on the existing signs, except replacing a few gores/tabs which are too small to accommodate 3 digits. 

But I digress...
This could be their way of grooming the public on mile-based exits.  Instead of changing the EXIT signs to the mile-based numbers and having a supplemental OLD EXIT xx, in this way, they are preparing for the mile-based exit numbers while still retaining the "traditional" sequential numbers so as not to "upset the apple cart" for Vermont citizens.

Seems to be a recurring theme for much of the New England states--and to some extent, New York.
I don't need a GPS.  I AM the GPS! (for family and friends)

bob7374

#480
Based on a post to several Private FB road groups, Vermont has started putting up its 'Milepoint Exit #' signs along I-89. A photo in the post shows Exit 2 with the Milepoint Exit 13 tab at the bottom. Based on a comment the tabs have been added at least as far north as Exit 17 (MP 97). According to the post Vermont doesn't plan to change the existing sequential exit numbers until the next round of sign replacement around 2030. Road trip anyone?

Update. I've gotten permission to post the photo from Steve Goodwin on my New England Exit Renumbering website:

machias

Quote from: amroad17 on April 21, 2020, 01:17:52 AM
Quote from: shadyjay on April 21, 2020, 12:07:55 AM
Still think its a waste of time and money.  They're going through the trouble to make these new signs, which I think will just add to the confusion.  Instead, they could've made this website to educate the public on the new mile-based exits, then gone around and slapped up the new numbers on the existing signs, except replacing a few gores/tabs which are too small to accommodate 3 digits. 

But I digress...
This could be their way of grooming the public on mile-based exits.  Instead of changing the EXIT signs to the mile-based numbers and having a supplemental OLD EXIT xx, in this way, they are preparing for the mile-based exit numbers while still retaining the "traditional" sequential numbers so as not to "upset the apple cart" for Vermont citizens.

Seems to be a recurring theme for much of the New England states--and to some extent, New York.

You have to feel bad for motorists and others who base their whole identity on their exit number

shadyjay

I still find it amusing that the one road in Vermont with mile-based exits is losing exit numbers completely as part of this project.  Granted, the mile markers count up from a southern terminus that hasn't (and probably never will be) built.  But, amusing nevertheless.

Wonder if anyone would notice if the one exit on I-93 just became the mile-based number, without this milepoint b/s. 

vdeane

Quote from: shadyjay on June 09, 2020, 08:12:26 PM
I still find it amusing that the one road in Vermont with mile-based exits is losing exit numbers completely as part of this project.  Granted, the mile markers count up from a southern terminus that hasn't (and probably never will be) built.  But, amusing nevertheless.

Wonder if anyone would notice if the one exit on I-93 just became the mile-based number, without this milepoint b/s. 
They're taking away the exit numbers on VT 289?  I thought the reason the "milepoint exit" column said "N/A" was because the exit numbers were already mileage-based.
Please note: All comments here represent my own personal opinion and do not reflect the official position of NYSDOT or its affiliates.

Alps

Quote from: vdeane on June 09, 2020, 09:14:57 PM
Quote from: shadyjay on June 09, 2020, 08:12:26 PM
I still find it amusing that the one road in Vermont with mile-based exits is losing exit numbers completely as part of this project.  Granted, the mile markers count up from a southern terminus that hasn't (and probably never will be) built.  But, amusing nevertheless.

Wonder if anyone would notice if the one exit on I-93 just became the mile-based number, without this milepoint b/s. 
They're taking away the exit numbers on VT 289?  I thought the reason the "milepoint exit" column said "N/A" was because the exit numbers were already mileage-based.
This.

shadyjay

Didn't think of that.  I assumed they were removing the exit numbers since they count from a future that will most likely never occur.  But yeah they could be left alone.  I guess we'll wait and see.

bob7374

Meanwhile, it now looks like it won't be until 2035 until Vermont renumbers its exits:
https://www.wcax.com/content/news/Mile-markers-added-to-Vermont-interstate-exits-571269701.html

vdeane

Yikes.  This just keeps getting worse.  15 years from now?  Might as well be never.  And no, VT, the feds did not mandate little plaques, they mandated conversion... the plaques are just your way of trying to weasel out of it, probably in the hopes that everybody will have forgotten about this (or changed the policy) come 2035.
Please note: All comments here represent my own personal opinion and do not reflect the official position of NYSDOT or its affiliates.

Pete from Boston

#488
Quote from: bob7374 on June 09, 2020, 03:46:35 PM
Based on a post to several Private FB road groups, Vermont has started putting up its 'Milepoint Exit #' signs along I-89. A photo in the post shows Exit 2 with the Milepoint Exit 13 tab at the bottom. Based on a comment the tabs have been added at least as far north as Exit 17 (MP 97). According to the post Vermont doesn't plan to change the existing sequential exit numbers until the next round of sign replacement around 2030. Road trip anyone?

Update. I've gotten permission to post the photo from Steve Goodwin on my New England Exit Renumbering website:


Good lord, that's some confusing nonsense for motorists. They even invented the word "milepoint,"  because a good thing to do is to make motorists think about extra things and their purpose while driving.

EDIT: As it turns out, they did not, in fact, invent the word.

https://www.definitions.net/definition/MILEPOINT

           "MilePoint is a new travel social
            network for frequent flyers/business
            travelers."

Alex

Quote from: vdeane on June 16, 2020, 02:30:44 PM
Yikes.  This just keeps getting worse.  15 years from now?  Might as well be never.  And no, VT, the feds did not mandate little plaques, they mandated conversion... the plaques are just your way of trying to weasel out of it, probably in the hopes that everybody will have forgotten about this (or changed the policy) come 2035.

This is from a state that probably will never build another mile of new road. Shouldn't be surprised that they are lackluster on implementing this.

vdeane

Quote from: Alex on June 16, 2020, 06:51:18 PM
Quote from: vdeane on June 16, 2020, 02:30:44 PM
Yikes.  This just keeps getting worse.  15 years from now?  Might as well be never.  And no, VT, the feds did not mandate little plaques, they mandated conversion... the plaques are just your way of trying to weasel out of it, probably in the hopes that everybody will have forgotten about this (or changed the policy) come 2035.

This is from a state that probably will never build another mile of new road. Shouldn't be surprised that they are lackluster on implementing this.
They still have long distances between exits, rending sequential numbers of little utility, and a numbering anomaly resulting from the I-89/I-91 junction not being numbered on I-89.
Please note: All comments here represent my own personal opinion and do not reflect the official position of NYSDOT or its affiliates.

amroad17

$250,000 (of federal money) for an "extra step" when the DOT could have just changed the EXIT tabs or put on an overlay for, I'm guessing, a lot less money!  It is just Vermont holding on to an outdated tradition of sequential exit numbers--especially in a state that is perfect for a changeover from sequential to mile(point)-based exits.
I don't need a GPS.  I AM the GPS! (for family and friends)

abqtraveler

Quote from: amroad17 on June 17, 2020, 02:04:02 AM
$250,000 (of federal money) for an "extra step" when the DOT could have just changed the EXIT tabs or put on an overlay for, I'm guessing, a lot less money!  It is just Vermont holding on to an outdated tradition of sequential exit numbers--especially in a state that is perfect for a changeover from sequential to mile(point)-based exits.

People up in New England are very resistant to change, hence why Vermont is gong with Milepoint exit placards until the next round of sign replacements takes place 10-20 years down the road. Apparently that was enough to satisfy the FHWA's requirement for mile-based exit numbers, for now.
2-d Interstates traveled:  4, 5, 8, 10, 15, 20, 24, 25, 27, 29, 35, 39, 40, 41, 43, 45, 49, 55, 57, 64, 65, 66, 69, 70, 71, 72, 74, 75, 76(E), 77, 78, 81, 83, 84(W), 85, 87(N), 89, 90, 91, 93, 94, 95

2-d Interstates Clinched:  12, 22, 30, 37, 44, 59, 80, 84(E), 86(E), 238, H1, H2, H3, H201

froggie

^ Correct.  Local media has reported that FHWA signed off on this.

vdeane

#494
Yeah, if I were FHWA, I wouldn't have, especially with the long time scale.  Who knows if Vermont will even still be doing full-scale sign rehabs anymore in 15 years?  They could become like New York, where replace in kind on a per-sign basis is often done instead.  With modern GIS-based inventories and asset management software, I expect such to become increasingly common across the country - after all, the reason for a corridor-wide rehab in the first place is because you don't know the condition of every individual sign.  As transportation dollars become increasingly scarce, I don't see why a state would spend the money to do it the old way.  Yes, the old way would make roadgeeks more happy... but states don't budget for roadgeeks.  They budget to serve the needs of the traveling public for the lowest cost possible, so if you can get a section of road back to good condition by replacing 5 signs instead of 20, you're going to replace 5.

(personal opinion)
Please note: All comments here represent my own personal opinion and do not reflect the official position of NYSDOT or its affiliates.

roadman65

#495
Quote from: Pete from Boston on June 16, 2020, 06:47:49 PM
Quote from: bob7374 on June 09, 2020, 03:46:35 PM
Based on a post to several Private FB road groups, Vermont has started putting up its 'Milepoint Exit #' signs along I-89. A photo in the post shows Exit 2 with the Milepoint Exit 13 tab at the bottom. Based on a comment the tabs have been added at least as far north as Exit 17 (MP 97). According to the post Vermont doesn't plan to change the existing sequential exit numbers until the next round of sign replacement around 2030. Road trip anyone?

Wonder why they skipped I-91?  I can see that they consider interstate to interstate junctions as meaningless like PennDOT did in their days of sequential numbers, but here on I-91  at the same interchange you get an exit number.
Every day is a winding road, you just got to get used to it.

Sheryl Crowe

vdeane

Although for the longest time that number was only barely signed... but I-189 has a number too.
Please note: All comments here represent my own personal opinion and do not reflect the official position of NYSDOT or its affiliates.

froggie

Worth noting that, originally, I-91 didn't have an exit number at I-89 either.  This appears to have been changed ca. 1970 when the Exit 10 number (previously the US 5/WRJ exit) was moved to the I-89 interchange and everything north of there was adjusted (it helps that, except for some mileage in Derby, nothing was finished north of Norwich at the time).

Also, curiously, the 1971 state map shows I-89 as having Exit 1 at I-91 and Exit 1A at US 4.  I suspect it was never signed as such because from the 1972 edition on, Exit 1 went back to US 4.

jcroyer80

Sounds like today was the groundbreaking for Segment 3 (out of 4) of the Autoroute 35 expansion towards the Vermont border.  From the Vermont press release "Segment 3 of A-35 stretches 8.9 kilometers (5.6 miles) from Route 133 in Saint-Sebastien south to Saint-Armand. Segment 4 is the final 4.5 kilometers (2.8 miles) that will connect south to the U.S-Canadian border. The MTQ indicates a full-completion target date in 2025."

https://governor.vermont.gov/press-release/governor-phil-scott-congratulates-quebec-autoroute-35-groundbreaking

PHLBOS

Quote from: vdeane on June 16, 2020, 02:30:44 PMYikes.  This just keeps getting worse.  15 years from now?  Might as well be never.
And one thought CT was slow to change.
GPS does NOT equal GOD



Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.