Checked out the work on Saturday. (See my
Five-state road trip post for details.) Looks like there will be only one access point along the new route. All the other county roads I drove up were bridged over. I didn't go up three roads which looked to be really minor in nature.
A post upthread said the work was supposed to be done last fall. They obviously missed that deadline. Any updates on a completion date? Looked to me like all they lack is the final surface (it's asphalt) and tying in to the existing four-lane at each end.
I plan to go check it out again when it's open to traffic.
They now have WV 817 concurrently signed with US 35. Last time I was there, it wasn't signed concurrently; WV 817 ended at the intersection near the Buffalo Bridge and apparently picked back up again as a separate segment near Pt. Pleasant. All they'll have to do now is remove the US 35 signs and reposition the WV 817 signs on the posts when the new route opens.