Regional Boards > Northwest

SR-520 Portage Bay Bridge & Montlake Lid Concepts

(1/2) > >>

KEK Inc.:
WSDOT released new pictures of the I-5 to Evergreen Point Bridge concept pictures on their Flickr after they closed the road last weekend for final lane striping and landscaping. 


Box Girder:


Cable-Stay:


Bill Dawson Trail under Montlake:


On top of Montlake Lid:






nexus73:
The illustration missed two things.  The rain and the congestion...LOL!  Aside from that humorous aside, how many lanes will the new bridge have?

Rick

Bruce:

--- Quote from: nexus73 on September 16, 2014, 06:19:39 PM ---The illustration missed two things.  The rain and the congestion...LOL!  Aside from that humorous aside, how many lanes will the new bridge have?
--- End quote ---

Must have been for a summer Saturday. The new floating bridge and the new Portage Bay Bridge will both be 6 lanes (4 GP, 2 HOV).

nexus73:
Thank you for the reply Bruce :-)

Rick

Henry:
Interesting drawings, but if I had to choose just one, I'd go with the cable-stay.

Navigation

[0] Message Index

[#] Next page

Go to full version