QuoteThe proposed project includes a range of roadway and intersection improvements involving Germantown Pike (G170) and Ridge Pike (SR 4031) corridors, designed as early actions in support of a future, separately programmed Second Bridge Crossing over the Perkiomen Creek project south of the existing bridge. See attached Project Location Map and Roadway Aerial Plan.
Proposed improvements include:
•Constructing a new Germantown Pike Connector Road between Germantown Pike (G170) and SR 4031 (Ridge Pike) approximately 1,300 feet east of the existing poorly skewed signalized intersection of those same roadways.
•Extending the new Germantown Pike Connector Road southwest of SR 4031 (Ridge Pike) to Pechins Mill Road (township).
•Providing a traffic signal at the new SR 4031 (Ridge Pike)/new Germantown Pike Connector Road intersection and eliminating the poorly skewed SR 4031 (Ridge Pike)/Germantown Pike (G170) signalized intersection and the adjacent stop sign controlled SR 4009 (River Road)/Germantown Pike (G170) intersection immediately east of the Perkiomen Creek bridge.
•Providing a roundabout at the northern end of the new Germantown Pike Connector Road.
•Extending SR 4009 (River Road) to the proposed roundabout.
•Widening of SR 4031 (Ridge Pike) to add shoulders and sidewalks between the Perkiomen Creek bridge and Crosskeys Road (township) and to provide turn lanes at the new SR 4031 (Ridge Pike)/new Germantown Pike Connector Road signalized intersection.
•Providing new storm drainage and storm water management facilities in the project area.
•Providing minor roadway improvements (shoulder reconstruction, guiderail, mill/overlay) to Pechins Mill Road (township)
•Providing a short length township roadway, with cul-de-sac, as 4th roundabout leg for several private driveway connections.◦Note - construction cost estimate increase since the original CEE preparation is attributable to additional work added and described in two prior bullets, plus new costs associated with: hazmat items not previously identified for lead in soil (gun club), earthwork items subsequently confirmed in final GER (benching, stone drainage for high groundwater and removal of unsuitable material), excavation for driveway and parking lot reconstruction; significant additional drainage item quantities, lighting items not accounted for originally, and general finalization of pavement, curb and sidewalk items.
•Demolishing three (3) structures impacted by proposed roadway widening (or new alignment) and storm water management facility. The demolitions will be completed as part of an early action construction project (separate MPMS 82115).
Quote from: roadman65 on Today at 12:33:17 AMhttps://maps.app.goo.gl/nXUufMWidfnysogFA
I take that "The Islands" refers to Nantucket and Martha's Vineyard on this guide on SB MA28.
Quote from: roadman65 on Today at 12:33:17 AMhttps://maps.app.goo.gl/nXUufMWidfnysogFA
I take that "The Islands" refers to Nantucket and Martha's Vineyard on this guide on SB MA28.