Started by mvak36, January 14, 2017, 04:40:27 PM

Previous topic - Next topic

mvak36

I missed this earlier but apparently they awarded a Design-Build contract for the I-70 Climbing Lanes project during yesterday's meeting.

News Release: https://www.modot.org/node/18315
Quote

ESS Team Selected for I-70 Climbing Lanes at Mineola Hill in Montgomery County
Project Expected to be Completed by Nov. 30, 2021

HANNIBAL — By the end of next year, drivers will have the opportunity to utilize a third lane on both east and westbound Interstate 70 in Montgomery County in the area known as Mineola Hill. The ESS Team, headquartered in Columbia, Missouri, was selected today as the apparent best-value proposer by the Missouri Highways and Transportation Commission.

This highway project was made possible by a federal Infrastructure for Rebuilding America (INFRA) grant in combination with the replacement of the I-70 Missouri River Bridge at Rocheport in Boone and Cooper Counties.

The ESS Team is comprised of Emery Sapp & Sons serving as the prime contractor and Bartlett & West providing design services.

The ESS Team was one of three design-build teams competing for the contract. Design-build is a project delivery method that combines both the design and construction phases into one contract to save time and resources. Information about the project can be found at https://www.modot.org/mineola-hill-climbing-lanes-design-build.

"The project's primary purpose is to construct eastbound and westbound truck climbing lanes near Mineola Hill to enable traffic to flow more safely and efficiently and to replace the bridges within the project limits to replace existing deficient structures,"  explained MoDOT Project Director Brandi Baldwin. Construction on the project will begin later this summer.

"We're proud to have been selected to build the new lanes and look forward to a good working relationship with the team and the region,"  said Matt Oesch, project manager for the ESS Team. "We're committed to building a quality project at a good value as quickly as possible."

The project goals are:
   

       
  • Optimize traffic flow and safety with the project limits during and after construction.
  • Use the available resources wisely to improve safety, reliability and long-term performance of the assets with the project limits.
  • Meet or beat the construction completion date of Nov. 30, 2021.The ESS Team's goal is to subcontract 10 percent of the construction and 14 percent of the professional and design activities to Disadvantaged Business Enterprise companies.  Federal workforce goals also require that 11.4 percent of those working on the project are minorities, and 6.9 percent are female.
  • The next step in the design-build process is for the ESS Team to fine-tune its design plans. Construction is expected to begin in July.
  • The program budget is $15.8 million dollars which includes preliminary engineering, construction engineering, stipends and the $14.4 million dollar design-build contract.


Counties: Counties visited
Travel Mapping: Summary


Revive 755

Quote from: mvak36 on April 02, 2020, 04:38:47 PM
Job J6I3389 Route I-55 JEFFERSON County. Grading and pavement Route I-55 near St. louis county, the total length of improvement being 0.785 miles.

Aux lane for SB I-55 between Route A and US 67 in the Festus - Crystal City area.

mvak36

#102
May 15, 2020 Letting: Bid Results. Bid Award Winners.

Projects listed in blue font are part of Missouri Focus on Bridges program.

Job J2P3262 Route Various VARIOUS County. Job Order Contract for guardrail repair at various locations in the Northeast District, the total length of improvement being 0 miles.
Job J2P3364 Route US 61 LEWIS County. Lighting improvements at Rte. P interchange in Canton, the total length of improvement being 0.501 miles.
Job J0I3006F Route Various VARIOUS County. Job Order Contract for asphalt pavement repair at various interstate locations in the urban Kansas City District, the total length of improvement being 0 miles.
Job J0I3006H Route I-70 VARIOUS County. Job Order Contract for asphalt repair at various locations in the Kansas City District, the total length of improvement being 0 miles.
Job J3P3118C Route Various PETTIS County. Signal improvement at various intersection in Sedalia, the total length of improvement being 0 miles.
Job J4I3175 Route Various VARIOUS County. Job Order Contracting for bridge repair at various locations in the urban Kansas City District, the total length of improvement being 0 miles.
Job J4I3239 Route Various VARIOUS County. Job Order Contract for lighting repair at various locations in the urban Kansas City District, the total length of improvement being 0 miles.
Job J4I3269 Route Various VARIOUS County. Job Order Contracting for fence repair at various location in the urban Kansas City District, the total length of improvement being 0 miles.
Job J4P3187 Route Various VARIOUS County. Job Order Contract for concrete pavement repair in various major route locations in the urban Kansas City District, the total length of improvement being 0 miles.
Job J4P3381 Route Various VARIOUS County. Sign installation at various locations in the urban Kansas City District, the total length of improvement being 0 miles.
Job J4S3167 Route 7 JACKSON County. Signal improvements and add intersection turn lanes on 8th Street in Blue Springs, the total length of improvement being 0.379 miles.
Job J4S3205 Route 1 CLAY County. Build new roundabout on Route 1 at Parvin Road, the total length of improvement being 0.108 miles.
Job J5P3426 Route Various CALLAWAY, COLE, MILLER County. Signal improvements at MO 52 and RT CC in Eldon; at RT OO and Summit Dr. in Holts Summit; at RT C and RT CC in Jefferson City, the total length of improvement being 0 miles.
Job J5S3322 Route 66 LACLEDE County. Bridge removal west of Lebanon over the Gasconade River, the total length of improvement being 0.265 miles.
Job J5S3431 Route N, Y MARIES County. Resurface from Route 133 to Route 28 and Route Y from Route 28 to the ends of state maintenance, the total length of improvement being 8.544 miles.
Job J6I3515 Route I-70 ST CHARLES County. Pavement improvements from Mid Rivers Mall Drive to Fifth Street, the total length of improvement being 6.767 miles.
Job J6I3525 Route Various ST CHARLES, ST LOUIS County. Box culvert & channel cleanout at various locations in the St. Louis District, the total length of improvement being 0 miles.
Job J6M0274 Route Various VARIOUS County. Signal improvements at various locations in the St. Louis District, the total length of improvement being 0 miles.

(1): Job J6P3188B Route 141 ST LOUIS County. Interchange improvements and bridge improvements at the Route 364 interchange, the total length of improvement being 0.338 miles.
(2): Job J6P3188C Route 141 ST LOUIS County. Interchange Improvements at the Route 364 interchange, the total length of improvement being 1.619 miles.

Job J6P3246 Route 50 FRANKLIN County. Resurface and intersection improvements at Route EE and East Denmark Rd. near Union, MO, the total length of improvement being 2.809 miles.
Job J6P3380 Route Various ST LOUIS, ST LOUIS CITY County. Job Order Contract for guardrail repair at various locations throughout St. Louis County/City, the total length of improvement being 0 miles.
Job J6P3381 Route Various VARIOUS County. Job Order Contract for guard cable repair at various locations throughout the St. Louis District, the total length of improvement being 0 miles.
Job J6P3382 Route Various VARIOUS County. Job Order Contract for fence repair at various locations throughout the St. Louis District, the total length of improvement being 0 miles.
Job J6S3258 Route 115 ST LOUIS CITY County. Microsurface and ADA improvements from St. Louis city limits to Natural Bridge, the total length of improvement being 4.86 miles.
Job J6S3275 Route 231 ST LOUIS County. Pavement rehabilitation just south of River City Casino Blvd along Rte. 231 to Franru Lane, the total length of improvement being 2.872 miles.
Job J6S3300 Route F ST CHARLES County. Pavement and shoulder improvements from Route D in New Melle to Route 94 near Defiance, the total length of improvement being 10.329 miles.
Job J6S3402 Route AF FRANKLIN County. Signal and lighting improvements at Route 185 and I-44 ramps in Sullivan, the total length of improvement being 0.498 miles.
Job J6S3514 Route I-64 ST LOUIS County. Drainage improvements on south outer road east of Timberlake Manon Drive and on north outer road east of Mason Road, the total length of improvement being 0.114 miles.
Job J6I2222 Route I-64 ST LOUIS CITY County. Interchange improvements from west of Ewing Ave to east of 21st Street, the total length of improvement being 0.89 miles.

(1): Job J7P2228C Route 160 DADE County. Bridge deck replacement over Stockton Lake, 4 miles east of Greenfield, the total length of improvement being 0.443 miles.
(2): Job J7P3195 Route 160 DADE County. Bridge deck replacement over Stockton Lake, 4 miles east of Greenfield, the total length of improvement being 0.333 miles.


(1): Job J7P3120 Route 37 BARRY County. Coldmill, resurface and ADA improvements from south of Route 60 to the Arkansas State line, the total length of improvement being 31.67 miles.
(2): Job J7P3400 Route 37 BARRY County. Resurface and add passing lane 1 mile north of Wahburn, the total length of improvement being 0.845 miles.

Job J7P3416 Route Various VARIOUS County. Job Order Contract for guardrail and guard cable repair at various locations in the rural Southwest District, the total length of improvement being 0 miles.

(1): Job J8P3113 Route 60 GREENE County. Coldmill and resurface from Route 174 in Republic to Route 413, the total length of improvement being 8.326 miles.
(2): Job J8P3127 Route 60 GREENE County. Coldmill and resurface from west of Illinois Street to 174, the total length of improvement being 5.143 miles.
(3): Job J8S3159B Route 60 GREENE County. Intersection improvements at Route 174 in Republic, the total length of improvement being 0.562 miles.

Job J8P3183 Route Various VARIOUS County. Job Order Contract for guardrail and guard cable repair in the urban Southwest District, the total length of improvement being 0 miles.
Job J9M0276 Route BUS 67 BUTLER County. Conduit installation from Route W on BU 67 to BU 60, the total length of improvement being 2.552 miles.
Job J9P3212 Route 17 TEXAS County. Bridge replacement over Big Creek, the total length of improvement being 0.287 miles.
Job J9P3623 Route Various PEMISCOT, PERRY County. Slide repair at various locations within the Southeast District, the total length of improvement being 0 miles.
Job J9P3662 Route Various VARIOUS County. Pavement marking along Route 60 and Route 67, the total length of improvement being 0 miles.
Job J9S3063 Route BUS 61 SCOTT County. Bridge replacement over Route M and Railroad, the total length of improvement being 0.187 miles.
Job J9S3637 Route Various VARIOUS County. Job Order Contract for ADA transition plan improvements at various locations in Southeast District, the total length of improvement being 0 miles.
Counties: Counties visited
Travel Mapping: Summary

mvak36

#103
Not many listings in this letting (probably due to funding issues due to COVID). I will update this post if more projects are added.

June 19, 2020 Letting: Bid Results. Bid Award Winners.

Projects listed in blue font are part of Missouri Focus on Bridges program.

Job J1I3233 Route I-229 ANDREW, BUCHANAN County. Coldmill and resurface from I-29, north of St. Joseph, to Route 371, the total length of improvement being 10.66 miles.
Job J7P3174 Route 54 VERNON County. Bridge deck replacement over Missouri and Northern Arkansas Railroad in Nevada, the total length of improvement being 0.257 miles.
Job J7P3190G Route 266 GREENE County. Bridge replacement over Pickerel Branch 1.3 miles east of Plano, the total length of improvement being 0.05 miles.
Job J9S3616 Route AB HOWELL County. Grading and pavement from 2.2 miles west of Route 160 to 2 miles west of Route 160, the total length of improvement being 0.214 miles.

EDIT: Additional project added to letting.
Job J1P3236 Route 36 CALDWELL, LINN, LIVINGSTON County. Coldmill and resurface from Parson's Creek to Macon Co., LAJR from Clinton to Macon Counties, the total length of improvement being 73.358 miles.
Counties: Counties visited
Travel Mapping: Summary

mvak36

The winning bids for the May letting were announced at the MHTC meeting today (6/3)
Counties: Counties visited
Travel Mapping: Summary

Gnutella

Good, Mineola Hill is always a clusterfuck.

skluth

Quote from: Revive 755 on April 02, 2020, 09:51:48 PM
Quote from: mvak36 on April 02, 2020, 04:38:47 PM
Job J6I3389 Route I-55 JEFFERSON County. Grading and pavement Route I-55 near St. louis county, the total length of improvement being 0.785 miles.

Aux lane for SB I-55 between Route A and US 67 in the Festus - Crystal City area.

That's nice and probably needed. But what's really needed is a NB US 67 to NB I-55 flyover ramp. I hate that cloverleaf ramp and I bet any traffic on NB I-55 hates slowing down for all the traffic entering from that ramp.

STLmapboy

Quote from: mvak36 on February 10, 2019, 07:06:56 PM
(1): Job J6S3141 Route 109 ST LOUIS County. Bridge rehabilitation over Route 100, the total length of improvement being 0.104 miles.
(2): Job J6S3141B Route 109 ST LOUIS County. Add roundabout at Route 100, the total length of improvement being 0.3492 miles.
(3): Job J6S3141C Route 109 ST LOUIS County. Add bicycle/pedestrian trail s/o Route 100 to Cambury Lane, the total length of improvement being 0.281 miles.
(4): Job J6S3141D Route 109 ST LOUIS County. Add roundabout at Main Street, the total length of improvement being 0.19 miles.

My uncle is a city planner in Wildwood and was looking to MoDOT for a few years to get the south roundabout in at 109. Glad everything's gone through by now.
Teenage STL area roadgeek.
Missouri>>>>>Illinois

ozarkman417

MODOT hasn't released any new bid lettings for quite some time now. Could it be the second wave? Funding?  Even the last one had very few projects.

mvak36

The winning bids for the June letting were announced at the MHTC meeting on July 8.
Counties: Counties visited
Travel Mapping: Summary

mvak36

Quote from: ozarkman417 on July 13, 2020, 12:33:22 PM
MODOT hasn't released any new bid lettings for quite some time now. Could it be the second wave? Funding?  Even the last one had very few projects.

We'll find out either this week or next week when they post the August lettings in their Online Plans room. I'm guessing with the funding issues there might not be too many.
Counties: Counties visited
Travel Mapping: Summary

mvak36

#111
August 21, 2020 Letting: Bid Results. Bid Award Winners.

Projects listed in blue font are part of Missouri Focus on Bridges program.

Job J1S3122 Route V HARRISON County. Bridge replacement over Coal Creek, 1.2 miles north of Rte. WW near Cainsville, the total length of improvement being 0.143 miles.
Job J1S3344 Route 111 HOLT County. Resurface from Rte. 118 to Rte. 159 near Big Lake and on SP 111 from Rte. 111 to Rte. 59 in Craig, the total length of improvement being 4.439 miles.

(1): Job J1S3354 Route D ATCHISON County. Resurface from Rte. A to Rte. 136 near Phelps City, the total length of improvement being 5.026 miles.
(2): Job J1S3357 Route U ATCHISON County. Resurface from Rte. 136 to Rte. E near Phelps City, the total length of improvement being 3.655 miles.
(3): Job J1S3358 Route E ATCHISON County. Resurface from Rte. U to Rte. 111 near Langdon, the total length of improvement being 2.345 miles.
(4): Job J1S3375 Route W HOLT County. Resurface from I-29 to Rte. 111 in Corning, the total length of improvement being 0.762 miles.

(1): Job J1S3355 Route V ATCHISON County. Resurface from Iowa state line to end of state maintenance, the total length of improvement being 5.68 miles.
(2): Job J1S3356 Route Z ATCHISON County. Resurface from I-29 to end of route, the total length of improvement being 3.298 miles.
(3): Job J1S3357B Route U ATCHISON County. Resurface from Rte. E to end of state maintenance near Phelps City, the total length of improvement being 3.808 miles.

(1): Job J1S3374 Route 111 HOLT County. Resurface from Rte. W in Corning to Spur 111 in Craig, the total length of improvement being 8.057 miles.
(2): Job J1S3376 Route 111 ATCHISON, HOLT County. Resurface from Rte. E to Rte. W in Corning, the total length of improvement being 9.812 miles.

Job J2P3262 Route Various VARIOUS County. Job order contract for guardrail repair in Audrain, Randolph, Monroe, Ralls, Marion, Shelby, Pike, Montgomery, Lincoln, Warren Counties, the total length of improvement being 0 miles.
Job J2P3262B Route Various VARIOUS County. Job order contract for guardrail repair in Macon, Schuyler, Scotland, Knox, Adair, Lewis, Clark Counties, the total length of improvement being 0 miles.
Job J4I3382 Route Various VARIOUS County. Sign installation at various locations in the urban Kansas City District, the total length of improvement being 0 miles.
Job J4I3475 Route I-70 JACKSON County. Drainage repair 0.5 miles east of Route H/F, the total length of improvement being 0.058 miles.
Job J0I3006H Route I-70 VARIOUS County. Job Order Contract for asphalt pavement repair at various locations in the Kansas City District, the total length of improvement being 0 miles.
Job J5I3408 Route Various BOONE, CALLAWAY, MORGAN, PULASKI, WASHINGTON County. High friction surface treatment on curves on multiple routes across Central District, the total length of improvement being 3.216 miles.
Job J5P3323 Route 5 LACLEDE County. Coldmill and resurface from west of Adams Ave. to south of Farmers Ln., Rte. 64 at Rte. 5 and add intersection turn lane at exit ramp 129 on I-44 eastbound at Rte. 5 in Lebanon, the total length of improvement being 2.44 miles.
Job J5S3367 Route O CALLAWAY County. Bridge deck replacement over Auxvasse Creek, 6 miles southeast of Fulton, the total length of improvement being 0.36 miles.
Job J6S3513 Route 61, 67, 50 ST LOUIS County. Pavement marking from 0.3 miles south of Rte. D to Swan Drive and Grand Avenue to Barracksview Road, the total length of improvement being 14.018 miles.

(1): Job J7S3181 Route H GREENE, POLK County. Resurface on Rte. H from Rte. 32 to Rte. WW, the total length of improvement being 20.49 miles.
(2): Job J7S3215 Route KK POLK County. Resurface from Rte. 13 to Rte. H, the total length of improvement being 6.697 miles.
(3): Job J8S3092 Route H GREENE County. Resurface from Rte. WW to Stoneridge St., the total length of improvement being 4.431 miles.
(4): Job J8S3185 Route KK GREENE County. Resurface from Rte. H to US 65, the total length of improvement being 5.068 miles.
(5): Job J8S3186 Route AA GREENE County. Resurface from Rte. H to US 65, the total length of improvement being 5.072 miles.

(1): Job J7S3189K Route A BATES County. Resurface from the Kansas state line to I-49, the total length of improvement being 16.632 miles.
(2): Job J7S3189L Route F BATES County. Resurface from Rte. J to Loop 49 in Passaic, the total length of improvement being 9.93 miles.
(3): Job J7S3189M Route J BATES County. Resurface from Kansas state line to Rte. F, the total length of improvement being 5.46 miles.
(4): Job J7S3189N Route Y BATES County. Resurface from Rte. 18 in Merwin to Rte. J in Amsterdam, the total length of improvement being 4.638 miles.

Job J7S3301 Route MO 245 CEDAR, DADE County. Resurface from Rte. 32 west of Fair Play to Rte. 160, the total length of improvement being 16.28 miles.

(1): Job J7M0265 Route Various VARIOUS County. Job Order Contract for signal and lighting repairs at various locations in the Southwest District, the total length of improvement being 0 miles.
(2): Job J7M0266 Route Various VARIOUS County. Job Order Contract for signal and lighting repairs at various locations in the Southwest District, the total length of improvement being 0 miles.
(3): Job J8M0262 Route Various VARIOUS County. Job Order Contract for signal and lighting repair in various locations in the Southwest District, the total length of improvement being 0 miles.

Edit: Additional Projects added
Job J1S3157 Route 139 CHARITON County. Bridge replacement over Grand River Overflow, 1.6 miles west of Rte. EE near Sumner, the total length of improvement being 0.117 miles.
Job J1S3158 Route P HARRISON County. Bridge replacement over White Oak Creek, 0.4 miles west of Rte. TT near McFall, the total length of improvement being 0.091 miles.
Job J2S2185 Route Z CARROLL County. Bridge replacement over Tater Hill Creek, 1.1 miles west of Rte. 65 near Coloma, the total length of improvement being 0.129 miles.
Counties: Counties visited
Travel Mapping: Summary

kphoger

Quote from: mvak36 on July 16, 2020, 03:52:55 PM
Projects listed in blue font are part of Missouri Focus on Bridges program.

Were you planning to format some of them to be blue?
Keep right except to pass.  Yes.  You.
Visit scenic Orleans County, NY!
Male pronouns, please.

Quote from: Philip K. DickIf you can control the meaning of words, you can control the people who must use them.

mvak36

Quote from: kphoger on July 16, 2020, 03:58:57 PM
Quote from: mvak36 on July 16, 2020, 03:52:55 PM
Projects listed in blue font are part of Missouri Focus on Bridges program.

Were you planning to format some of them to be blue?

I haven't seen any yet in the listing. I probably copied that over from another letting. I'll remove it for now and will add it if any of those bridge projects are added.
Counties: Counties visited
Travel Mapping: Summary

US71

Quote from: mvak36 on April 29, 2020, 10:49:04 AM
May 15, 2020 Letting:

Job J5S3322 Route 66 LACLEDE County. Bridge removal west of Lebanon over the Gasconade River, the total length of improvement being 0.265 miles.


This project is on hold. The Missouri 66 Association is trying to save this bridge, but the state appears to be dragging its heels and creating new obstacles.
Like Alice I Try To Believe Three Impossible Things Before Breakfast

ozarkman417

September 18, 2020 Letting:

Projects listed in blue font are part of Missouri Focus on Bridges program.

Job J1P3234 Route 136 NODAWAY County. Resurface from 102 River to Rte. 46 near Ravenwood, the total length of improvement being 8.223 miles.
Job J3S3137 Route Y PETTIS County. Resurface from Quisenberry Road to Route 65, the total length of improvement being 3.169 miles.
Job J4P3212 Route H JACKSON County. Intersection Improvement at Pink Hill Rd, the total length of improvement being 0.157 miles.
Job J5I3423 Route I-70 BOONE, CALLAWAY County. Pavement repair from Saline County line to Montgomery County line, the total length of improvement being 99.73 miles.
Job J5P3333 Route 50 COLE County. Resurface from east of West Truman Blvd. to east of Kaylor Bridge Road and from east of Route M to east of Stoney Gap Road, the total length of improvement being 12.399 miles.

(1): Job J5P3343 Route 47 WASHINGTON County. Seal coat from the Franklin County Line to Rte. 21, the total length of improvement being 11.064 miles.
(2): Job J5S3345 Route 47 WASHINGTON County. Seal coat from Rte. 21 to St. Francois County line, the total length of improvement being 8.472 miles.

Job J5S3264 Route N OSAGE County. Bridge replacement over Contrary Creek north of Freedom, the total length of improvement being 0.104 miles.
Job J5S3281 Route FF DENT County. Bridge replacement over Norman Creek, the total length of improvement being 0.066 miles.
Job J5S3282 Route N MARIES County. Bridge deck replacement over Rodgers Creek, the total length of improvement being 0.035 miles.
Job J5S3316 Route Various COOPER, HOWARD County. Resurface from Rte. U to Rte. 50 in Tipton, on Rte. W from Rte. A to Rte. 240 and on Rte. EE from Rte. A to Rte. J in Howard County, the total length of improvement being 33.838 miles.
Job J5S3331 Route Various LACLEDE County. Seal coat on various routes in Laclede County, the total length of improvement being 15.621 miles.
Job J5S3353 Route Various ST FRANCOIS, WASHINGTON County. Seal coat on various routes in Washington and St. Francois counties, the total length of improvement being 33.579 miles.
Job J5S3355 Route D,V MARIES, PULASKI County. Seal coat from Rte. 28 to I-44 and Maries County Rte. V from Rte. 42 to Rte. N, the total length of improvement being 16.516 miles.
Job J5S3504 Route F CALLAWAY County. Bridge rehabilitation over US 54 west of Fulton, the total length of improvement being 0.049 miles.
Job J5S3385 Route U WASHINGTON County. Resurface from Route 8 to Route M, the total length of improvement being 9.536 miles.
Job J6P3523 Route 67 ST LOUIS County. Pavement improvements from north of I-70 to south of Page Avenue, the total length of improvement being 3.651 miles.
Job J6S3049 Route 180 ST LOUIS County. Resurface from Interstate 170 to St. Louis City limits, the total length of improvement being 3.633 miles.
Job J6S3233 Route 30 ST LOUIS County. Signal Improvements from Sappington Road to Seibert Avenue, the total length of improvement being 0 miles.
Job J6S3545 Route 70 ST LOUIS CITY County. Bridge rehabilitation over I-70 at West Florissant Avenue, the total length of improvement being 0.108 miles.
Job J7I3358 Route I-49 MCDONALD County. Resurface from 1.5 miles north of Rte. EE to Goodin Hollow Road, the total length of improvement being 7.179 miles.
Job J7P3281 Route US54 VERNON County. Resurface from the Kansas State line to Webster Street in Nevada, the total length of improvement being 16.107 miles.

(1): Job J7S3189B Route J BARRY County. Resurface from beginning of state maintenance to Rte. 86 south of Golden, the total length of improvement being 3.741 miles.
(2): Job J7S3189C Route 76 STONE County. Resurface from Flat Creek Road west of Cape Fair to Rte. 173, the total length of improvement being 3.954 miles.
(3): Job J7S3189D Route OO STONE County. Resurface from beginning of route to Rte. 13 near Kimberling City, the total length of improvement being 2.78 miles.

(1): Job J7S3189I Route BB GREENE County. Resurface on Rte. BB From MO 123 To MO 13, the total length of improvement being 11.189 miles.
(2): Job J8S3123 Route O GREENE County. Resurface from Jackson Street in Willard to Rte. 13, the total length of improvement being 5.654 miles.

Job J7S3302 Route B VERNON County. Resurface from I-49 in Sheldon to Rte. 97 and upgrade pedestrian facilities to comply with ADA Transition Plan at First St. in Sheldon, the total length of improvement being 14.861 miles.     

US71

I received an e-mail this morning that the MO 76 bridge at Table Rock Lake is being re-decked. Was that on a previous post I missed?
Like Alice I Try To Believe Three Impossible Things Before Breakfast

ozarkman417

Quote from: US71 on August 17, 2020, 12:07:40 PM
I received an e-mail this morning that the MO 76 bridge at Table Rock Lake is being re-decked. Was that on a previous post I missed?

Quote from:  March 15, 2019 MODOT Bid Lettings(1): Job J7P2228B Route 76 STONE County. Bridge deck replacement over Table Rock Lake near Cape Fair, the total length of improvement being 0.354 miles.

mvak36

Quote from: ozarkman417 on August 17, 2020, 12:00:24 PM
September 18, 2020 Letting:
 

Thanks for doing that. Was busy with work last week so I completely forgot about this.
Counties: Counties visited
Travel Mapping: Summary

ozarkman417

October 16, 2020 Letting:

Projects listed in blue font are part of Missouri Focus on Bridges program.

(1): Job J1P3106 Route 169 GENTRY County. Bridge rehabilitation over Middle Fork Grand River, 0.6 mile east of Rte. YY near Gentry, the total length of improvement being 0.093 miles.
(2): Job J1S3253 Route EE HARRISON County. Bridge rehabilitation over Panther Creek, 0.1 mile south of Rte. F, near New Hampton, the total length of improvement being 0.034 miles.

(1): Job J1S3061 Route B HOLT County. Bridge rehabilitation over I-29 near Oregon, the total length of improvement being 0.091 miles.
(2): Job J1S3136 Route A DEKALB County. Bridge rehabilitation over Lost Creek, 0.5 mile south of Rte. W near Maysville, the total length of improvement being 0.098 miles.

(1): Job J1S3161 Route BB MERCER County. Bridge deck replacement over Branch of Weldon Fork Creek, 3.5 miles west of Rte. 65, near Mercer, the total length of improvement being 0.028 miles.
(2): Job J1S3163 Route Y PUTNAM County. Bridge deck replacement over Blackbird Creek, 2.6 miles south of Rte. 129 near Unionville, the total length of improvement being 0.055 miles.

(1): Job J1S3245 Route 11 LINN County. Scrub seal from intersection of Rte. 11 and Rte. 129 to intersection of Rte. 11 and Bus. Route 36 in Brookfield, the total length of improvement being 21.825 miles.
(2): Job J1S3247 Route 129 LINN, SULLIVAN County. Scrub seal from intersection of Rte. H and Rte. 129 to intersection of Rte. 129 and Rte. 11 south of Green City, the total length of improvement being 11.362 miles.

Job J2P3334 Route 36 MARION, SHELBY County. Pavement improvements from 1.7 miles west of Rte. Z to 0.7 mile west of Bus. 36 west junction at Monroe City, the total length of improvement being 7.231 miles.

(1): Job J2S3204 Route J RALLS County. Seal Coat from Rte. 36 to Rte. 154 at Perry, the total length of improvement being 19.123 miles.
(2): Job J2S3205 Route W MONROE, RALLS County. Seal coat from Rte. 24 in Monroe City to Rte. J, the total length of improvement being 4.001 miles.
(3): Job J2S3209 Route W MARION County. Seal coat from Rte. 61 north junction to Rte. 61 south junction and on Rte. 61 outer road from Rte. W to 0.3 mile south of Rte. W in Hannibal, the total length of improvement being 3.305 miles.
(4): Job J2S3229 Route A MARION County. Resurface from Rte. 6 to Rte. 168 near Palmyra, the total length of improvement being 8.387 miles.
(5): Job J2S3302 Route H MARION, RALLS County. Resurface from Rte. 36 to Rte. 19 at Center, the total length of improvement being 13.541 miles.
(6): Job J2S3305 Route 61 MARION County. Seal coat from 0.1 mile north of Rte. BB to 0.1 mile north of Rte. 24 and Rte. 61 in Palmyra, the total length of improvement being 2.782 miles.
(7): Job J2S3306 Route 168 MARION, SHELBY County. Seal coat from Rte. 15 to Bus 61 in Palmyra, the total length of improvement being 31.169 miles.
(8): Job J2S3331 Route C MARION County. Seal coat from Rte. Z west junction to Rte. 168 near Palmyra, the total length of improvement being 9.759 miles.
(9): Job J2S3348 Route DD RALLS County. Resurface from Rte. 36 to end of state maintenance near Huntington Lane, the total length of improvement being 3.718 miles.
(10): Job J2S3349 Route Z MARION, RALLS County. Seal coat from Rte. C to Rte. 36 near Monroe City, the total length of improvement being 6.788 miles.

Job J3S3147 Route T JOHNSON County. Resurface from Route 58 in Kingsville to Route 2, the total length of improvement being 7.703 miles.
Job J4I3222 Route I-70 JACKSON County. Resurface from Route 7 to Horseshoe Creek bridge, the total length of improvement being 8.742 miles.
Job J4I3233 Route 24 JACKSON County. Sign improvements on I-70 and I-435, the total length of improvement being 29.374 miles.
Job J4P3248 Route 2 CASS County. Resurface and shoulder improvements from the Kansas state line to I-49, the total length of improvement being 16.259 miles.
Job J5I3137 Route I-70 CALLAWAY County. Coldmill and resurface from Cedar Creek at the Boone/Callaway County line to Route 54 in Kingdom City, the total length of improvement being 23.288 miles.
Job J5S3176 Route J GASCONADE County. Bridge replacement over First Creek 0.5 miles west of Rte. 100, the total length of improvement being 0.063 miles.
Job J6P3446 Route Various FRANKLIN, JEFFERSON, ST CHARLES, ST LOUIS, ST LOUIS CITY County. Job order contract for bridge repairs at various major route locations in the St. Louis District, the total length of improvement being 0 miles.
Job J6Q3173E Route Various FRANKLIN, JEFFERSON, ST CHARLES, ST LOUIS, ST LOUIS CITY County. ITS improvements at various locations in the St. Louis District, the total length of improvement being . miles.
Job J7P3107C Route 249, FF JASPER County. Bridge Rehabilitation on northbound bridge over I-44 and on Rte. FF over I-49 and I-44 in Joplin, the total length of improvement being 0.236 miles.

(1): Job J7S3189E Route MM TANEY County. Resurface from Rte. 76 in Mildred to end of Rte., the total length of improvement being 1.177 miles.
(2): Job J7S3189F Route K TANEY County. Resurface from Rte. 76 to end of state maintenance, the total length of improvement being 2.782 miles.
(3): Job J7S3189G Route VV TANEY County. Resurface from beginning of state maintenance to Rte. 76, the total length of improvement being 2.059 miles.
(4): Job J7S3189H Route P TANEY County. Resurface from Rte. 265 to end of state maintenance, the total length of improvement being 0.844 miles.

Job J7S3205 Route 123 POLK County. Bridge replacement over Barren Creek 1.3 miles south of Fair Play, the total length of improvement being 0.061 miles.
Job J7S3292 Route 90 BARRY, MCDONALD County. Resurface and shoulder improvements from Rte. 43 near Southwest City to Rte. 37 near Washburn, the total length of improvement being 45.765 miles.
Job J8S3205 Route NN CHRISTIAN, GREENE County. Resurface from 0.1 mile south of Farm Road 197 to 0.1 mile east of Rte. J in Ozark, the total length of improvement being 4.337 miles.
Job J9I3545 Route I-55 SCOTT County. Resurface from I-57 to Rte. 77, the total length of improvement being 29.245 miles.
Job J9P3233 Route 61 CAPE GIRARDEAU, PERRY, STE GENEVIEVE County. Resurface from Rte. OO to north of Rte. 177, the total length of improvement being 61.14 miles.

*Job 6S3404 & Job 7I3363 are said to appear on this letting according to the FOB document, but is not on MoDOT's Online Plan Room yet.       

mvak36

Quote from: ozarkman417 on September 11, 2020, 10:22:51 PM
October 16, 2020 Letting:

Job J4I3233 Route 24 JACKSON County. Sign improvements on I-70 and I-435, the total length of improvement being 29.374 miles.
   

Looks like they're doing the signage upgrades for the re-route of US24.
Counties: Counties visited
Travel Mapping: Summary

STLmapboy

Quote from: mvak36 on September 12, 2020, 10:59:28 PM
Quote from: ozarkman417 on September 11, 2020, 10:22:51 PM
October 16, 2020 Letting:

Job J4I3233 Route 24 JACKSON County. Sign improvements on I-70 and I-435, the total length of improvement being 29.374 miles.
   

Looks like they're doing the signage upgrades for the re-route of US24.
I'm sorry, where's 24 being rerouted to?
Teenage STL area roadgeek.
Missouri>>>>>Illinois

mvak36

Quote from: STLmapboy on September 13, 2020, 04:58:14 PM
Quote from: mvak36 on September 12, 2020, 10:59:28 PM
Quote from: ozarkman417 on September 11, 2020, 10:22:51 PM
October 16, 2020 Letting:

Job J4I3233 Route 24 JACKSON County. Sign improvements on I-70 and I-435, the total length of improvement being 29.374 miles.
   

Looks like they're doing the signage upgrades for the re-route of US24.
I'm sorry, where's 24 being rerouted to?
I think the part from the downtown loop to 435 will now follow 70 till the 70/435 interchange and the north up 435 back to the current US24.
Counties: Counties visited
Travel Mapping: Summary

Ned Weasel

Quote from: mvak36 on September 13, 2020, 05:12:00 PM
I think the part from the downtown loop to 435 will now follow 70 till the 70/435 interchange and the north up 435 back to the current US24.

That seems really out of the way.  Like something Kansas would do.
"I was raised by a cup of coffee." - Strong Bad imitating Homsar

Disclaimer: Views I express are my own and don't reflect any employer or associated entity.

mvak36

#124
Here's the link to MODOT's request of the US24 relocation to AASHTO from back in 2018: https://route.transportation.org/wp-content/uploads/sites/50/2018/09/ALL-USRN-Applications-MO-OH-Annual-Meeting-2018.pdf

Pages 5 and 6 of that pdf have a picture of the new routing.