Regional Boards > Midwest - Great Lakes

Illinois interesting bid annoucements

<< < (3/62) > >>

ET21:

--- Quote from: Rick Powell on July 30, 2013, 11:10:36 AM ---
--- Quote from: Revive 755 on July 29, 2013, 08:50:14 PM ---3) The map on Sheet 4 in this set is definitely old since I-355 is not shown as complete, but it shows a continuation of the IL 394 freeway along IL 394 and then branching off of IL 1 to pass east of Beecher.  It also shows the South Suburban branching off of IL 394.
http://eplan.dot.il.gov/desenv/080213/60W67-027/PLANS/PL-60W67-027.pdf

--- End quote ---

Both the village's land use plan and the South Suburban Airport master plan envision the Beecher bypass being west of, not east of Beecher, utilizing the Ashland Avenue corridor.

--- End quote ---

It'll be interesting to see if they will consider doing something with 394 now that a 3rd airport has been approved.

Stratuscaster:
Not a fan of the overhead sign design for IL-59 thru the DDI - more specifically the way they have the far left lane signed for both I-88 and IL-59, right next to a sign with just IL-59.

I'm sure it's all related to the OAPL requirement...but it's got the potential to be just a tad confusing. (FWIW, I thought the same thing on the signage for the far right exit lane for SB IL-83 from I-88 that has both routes on it. I know it's to tell folks "yes you can get back on I-88 from this lane, too" - but it's still odd to me.)

http://eplan.dot.il.gov/desenv/061413/60I31-198/PLANS/PL-60I31-198-301-400.pdf
http://eplan.dot.il.gov/desenv/061413/60I31-198/PLANS/PL-60I31-198-301-500.pdf

Revive 755:
List of projects for the January 2014 Letting is up:
http://www.dot.il.gov/desenv/011714/nlitemdesc.pdf

* Item 87 is the I-57 interchange with Stunkel Road in Will County

* Item 129 is decorative LED lighting for the WB US 24 Mississippi River Bridge.

Plans are/will be posted at http://eplan.dot.il.gov/desenv/011714/011714plans.html

Revive 755:
There are certainly some unique fractions on the signs for I-255 for one of the January projects:
http://eplan.dot.il.gov/desenv/011714/76F10-063/PLANS/PL-76F10-063-101-206.pdf

Don't think I've seen '59/64 mile' or '57/64 mile' before.

(Edited to fix typo)

NE2:

--- Quote from: Revive 755 on December 20, 2013, 07:40:06 PM ---There are sp,e certainly a unique fractions on the signs for I-255 for one of the January projects:
http://eplan.dot.il.gov/desenv/011714/76F10-063/PLANS/PL-76F10-063-101-206.pdf

Don't think I've seen '59/64 mile' or '57/64 mile' before.

--- End quote ---
(pages 20, 26, 31, 34, 36)
Yeah, what the fuck?

Navigation

[0] Message Index

[#] Next page

[*] Previous page

Go to full version