hobsini2:

--- Quote from: paulthemapguy on May 12, 2021, 07:03:20 PM ---
--- Quote from: Brandon on May 09, 2021, 09:11:58 AM ---
--- Quote from: ET21 on May 08, 2021, 08:25:41 PM ---Item 206: Is that just the bridge or an interchange fix?

--- End quote ---
https://goo.gl/maps/5Ki63F6doLpFCgPy7 (Yes, that's wood under the girders on the left)

--- End quote ---

Those pieces of wood are just to support human bodies as they work on building or rehabilitating the bridge deck/superstructure.  They bridge the gap between flanges with pieces of wood, and sometimes plywood added on top of those, then stand on top of them as they paint/saw/rebar etc. They have no real impact on the bridge's structural integrity, so the construction workers often just forget about them and leave some or all of them there.

--- End quote ---
The 53 Bridge is getting a redecking and widening this summer.
https://www.wjol.com/seven-construction-projects-this-summer-of-which-five-are-on-i-55/#:~:text=I%2D55%20at%20Illinois%2053,2021%20and%20completed%20fall%202021.

Revive 755:
Item 71 on the June 2021 Letting has some of the signals on US 67 in Alton and Godfrey plus the signal at the IL 143 intersection with IL 140 getting the first flashing yellow arrows in District 8.

Revive 755:
List of projects for the July 30, 2021 Letting is up

* Item 6 installs a new traffic signal on IL 60 somewhere near Wauconda.

* Item 11 is a bridge replacement and some roadway reconstruction with traffic signal work somewhere on IL 132 in Lake County

* Item 12 adds a new traffic signal to IL 126 at the Will County/Kendall County line.

* Item 30 replaces the bridge on IL 8 over BNSF near Edwards.

* Item 43:  "9 miles of lane addition, median barrier installation and resurfacing existing lanes of I-57 from mile post 66 to Marcum Branch"

* Item 67 reconstruction the IL 72 intersection with State Street and Getzleman Road in Hampshire

ilpt4u:

--- Quote from: Revive 755 on June 25, 2021, 10:02:13 PM ---List of projects for the July 30, 2021 Letting is up

* Item 43:  "9 miles of lane addition, median barrier installation and resurfacing existing lanes of I-57 from mile post 66 to Marcum Branch"

--- End quote ---
That pushes the 6-laning of I-57 between Mt Vernon and Marion from West Frankfort (which was the previous segment) up to the southern end of Rend Lake/just north of Benton

Maybe I-57 really will ultimately become a 6-lane Freeway between I-24 and I-64

Rick Powell:

--- Quote from: ilpt4u on June 26, 2021, 04:13:49 AM ---Maybe I-57 really will ultimately become a 6-lane Freeway between I-24 and I-64

--- End quote ---

With this project and the others mentioned here, the only remaining 6-lane gap in that section will be south of Marion to I-24.

https://news.wsiu.org/transportation/2020-10-01/idot-plans-lots-of-work-on-i-57-in-southern-illinois