AARoads Forum

Please login or register.

Login with username, password and session length
Advanced search  

News:

New rules to ensure post quality. See this thread for details.

Author Topic: MODOT Contract Lettings  (Read 27696 times)

mvak36

  • *
  • Offline Offline

  • Posts: 1059
  • Last Login: September 20, 2021, 11:38:51 PM
Re: MODOT Contract Lettings
« Reply #150 on: May 16, 2021, 11:58:07 AM »

June 18, 2021 Letting: Bid Results. Bid Award Winners.

Projects listed in blue font are part of Missouri Focus on Bridges program. None listed as of now

(1): Job J1I3434 Route I-35 DAVIESS County. Scour repair at the Grand River 1.9 miles north of Rte. DD near Pattonsburg, the total length of improvement being 0.015 miles.
(2): Job J1P3435 Route 136 MERCER County. Scour repair at 0.9 mile east of Rte. DD near Ravanna, the total length of improvement being 0.038 miles.

(1): Job J1MAMD01 Route Various VARIOUS County. Resurface on various routes in Grundy, Mercer, Linn, Putnam, and Sullivan Counties, the total length of improvement being 75.59 miles.
(2): Job J2MAMD08 Route 149 ADAIR, PUTNAM County. Resurface from Rte. AA to Rte. 6 in Novinger, the total length of improvement being 10.653 miles.

Job J1P3303 Route 6 GRUNDY, SULLIVAN County. Scrub seal from Rte. 65 to Rte. 5 south of Milan and from east of Rte. 5, north of Milan, to Rte. 129 in Green City, the total length of improvement being 34.355 miles.

(1): Job J2MAMD01 Route A LEWIS County. Resurface from Rte. E in Williamstown to Rte. 16 in Monticello, the total length of improvement being 9.803 miles.
(2): Job J2MAMD13 Route B SCOTLAND County. Resurface from Iowa State line to Rte. 136, the total length of improvement being 13.962 miles.
(3): Job J2MAMD14 Route H CLARK County. Resurface from Rte. 81 0.5 mile south of Rte. Y to Rte. 61, the total length of improvement being 12.02 miles.

Job J2MAMD16 Route Y MACON, RANDOLPH County. Resurface from Rte. 63 near Excello to Rte. J in Randolph County, the total length of improvement being 10.874 miles.
Job J3S3209 Route 13 LAFAYETTE County. Slide repair from Rte. 224 to Delaware Street in Lexington, the total length of improvement being 0.091 miles.

(1): Job J5MAMD01 Route BB,NN MONITEAU County. Resurface Rte. NN from Moon Valley Road to Rte. 5 and Rte. BB from Rte. 50 to Arthur Road, the total length of improvement being 5.757 miles.
(2): Job J5MAMD02 Route JJ MORGAN County. Resurface from Rte. 135 to Rte. D, the total length of improvement being 7.645 miles.

Job J5MAMD04 Route Various CALLAWAY County. Resurface Rte. PP from Rte. BB to Rte. 94, Rte. K from Rte. D to Montgomery County line, and Rte. HH from I-70 to Rte. 54, the total length of improvement being 23.792 miles.
Job J6P3482 Route 364 ST CHARLES County. Median barrier installation over I-64 between on and off ramps, the total length of improvement being 0.378 miles.
Job J6S3476 Route I-44 ST LOUIS County. Pavement, guardrail, signal, and ADA improvements on the north and south outer roads between Antire Road to Yarnell Road, the total length of improvement being 5.184 miles.

(1): Job J7Q3414B Route I-44 GREENE, JASPER, LAWRENCE, NEWTON, WEBSTER County. ITS improvements at various locations on I-44 in the rural Southwest District, the total length of improvement being 0 miles.
(2): Job J8Q3181B Route Various GREENE County. ITS improvements at various locations in Urban Southwest District, the total length of improvement being 0 miles.

Job J9P3585 Route 51 PERRY County. Bridge rehabilitation over Mississippi River and Union Pacific Rail Road, the total length of improvement being 0.597 miles.

EDIT: Additional lettings added
Job J1M0264 Route 169 BUCHANAN County. Repair damaged culvert at 0.1 mile south of Karnes Road in St. Joseph, the total length of improvement being 0.086 miles.

(1): Job J3MAMD01 Route Various JOHNSON County. Resurface on various routes in the Rural Kansas City District, the total length of improvement being 13.413 miles.
(2): Job J4MAMD01 Route Various CASS County. Resurface various routes in the Urban Kansas City District, the total length of improvement being 12.218 miles.

Job J6MAMD02 Route Various FRANKLIN County. Resurface from I-44 to end of maintenance, Rte. JJ from end of maintenance to I-44, and Rte. W from I-44 to end of maintenance, the total length of improvement being 13.56 miles.
Job J0M0063 Route Various VARIOUS County. On-call slab stabilization statewide, the total length of improvement being 0 miles.
« Last Edit: July 01, 2021, 03:05:49 PM by mvak36 »
Logged
Counties: Counties visited
Travel Mapping: Summary

mvak36

  • *
  • Offline Offline

  • Posts: 1059
  • Last Login: September 20, 2021, 11:38:51 PM
Re: MODOT Contract Lettings
« Reply #151 on: June 08, 2021, 02:20:45 PM »

The winning bids for the May letting were awarded at the MHTC meeting on 6/2/21.
Logged
Counties: Counties visited
Travel Mapping: Summary

mvak36

  • *
  • Offline Offline

  • Posts: 1059
  • Last Login: September 20, 2021, 11:38:51 PM
Re: MODOT Contract Lettings
« Reply #152 on: July 01, 2021, 03:07:17 PM »

The winning bids for the June letting were awarded at the MHTC meeting on 7/1/21.
Logged
Counties: Counties visited
Travel Mapping: Summary

mvak36

  • *
  • Offline Offline

  • Posts: 1059
  • Last Login: September 20, 2021, 11:38:51 PM
Re: MODOT Contract Lettings
« Reply #153 on: July 16, 2021, 12:11:58 PM »

August 20, 2021 Letting: Bid Results. Bid Award Winners.

Projects listed in blue font are part of Missouri Focus on Bridges program.

Job J1I3231 Route I-29 ATCHISON, HOLT County. Resurface from Rte. 111 near Rock Port to Rte. W, the total length of improvement being 8.685 miles.
Job J1I3242 Route I-35 HARRISON County. Bridge rehabilitation over Pole Cat Creek south of Bethany, 2.2 miles south of I-35 and Rte. 136 interchange, the total length of improvement being 0.123 miles.

(1): Job J1I3271 Route I-29 HOLT County. Bridge deck replacement over Rte. 59, 8.1 miles north of Rte. 118, near Craig, the total length of improvement being 0.228 miles.
(2): Job J1P3254 Route 159 HOLT County. Bridge rehabilitation over Big Lake Overflow 1 mile west of Rte. 111, near Big Lake, the total length of improvement being 0.067 miles.
(3): Job J1S3058 Route U BUCHANAN County. Bridge deck replacement over Contrary Creek, 5.5 miles east of Rte. 59 near St. Joseph, the total length of improvement being 0.05 miles.
(4): Job J1S3203 Route 111 ATCHISON County. Bridge deck replacement over I-29, 2.9 miles south of Rock Port, the total length of improvement being 0.115 miles.
(5): Job J1S3251 Route 59 ANDREW County. Bridge rehabilitation over Route I-29 1.2 miles south of the Nodaway River, near Fillmore, the total length of improvement being 0.06 miles.

Job J1S3341 Route 69 CLINTON County. Intersection improvements at the intersection of Rte. 116 and US 69 near Lathrop, the total length of improvement being 0.198 miles.
Job J2P3370 Route Various VARIOUS County. Job order contract for guardrail repair at various locations in the Northeast District, the total length of improvement being 0 miles.
Job J6M0287 Route B JEFFERSON County. Sign installation on Rte. B at Column Drive, the total length of improvement being 0.372 miles.
Job J6P3596 Route 21 JEFFERSON County. Signal and lighting installation at Rte. 110 and Liberty School Rd. intersection, the total length of improvement being 0.287 miles.
Job J6S3434 Route 185,D FRANKLIN County. Resurface, Guardrail, and ADA improvements on Rte. 185 from Rte. AC to West Springfield Rd and on Rte. D from Rte. WW to West Springfield Rd, the total length of improvement being 8.635 miles.

(1): Job J7P3278 Route 32 POLK County. Resurface from Rte. 13 to Rte. D in Bolivar, the total length of improvement being 2.996 miles.
(2): Job J7S3279 Route 83 POLK County. Resurface on Springfield Ave. from Rte. 32 (Broadway St.) to Rte. 13 in Bolivar, the total length of improvement being 2.862 miles.

(1): Job J7S3296 Route Y HENRY County. Resurface from Rte. 52 in Windsor to Rte. C in Roseland, the total length of improvement being 9.506 miles.
(2): Job J7S3298 Route BENTON County. Resurface from US 65 near Lincoln to Rte. B, the total length of improvement being 14.293 miles.
(3): Job J7S3415 Route 2 HENRY County. Resurface from NE 1400 Road to Rte. WW in Windsor, the total length of improvement being 10.363 miles.

EDIT: Additional Letting Added.
Job 1I3457 Route I-29 BUCHANAN County. Repair bridge girders over Rte. 169, the total length of improvement being 0.030 miles.
« Last Edit: September 14, 2021, 06:04:12 PM by mvak36 »
Logged
Counties: Counties visited
Travel Mapping: Summary

mvak36

  • *
  • Offline Offline

  • Posts: 1059
  • Last Login: September 20, 2021, 11:38:51 PM
Re: MODOT Contract Lettings
« Reply #154 on: August 21, 2021, 09:05:52 AM »

September 17, 2021 Letting:

Projects listed in blue font are part of Missouri Focus on Bridges program.

(1): Job J1I3232 Route I-35 VARIOUS County. Resurface from 200' south of the Clinton/DeKalb county line, near Cameron, to the Route 69, 10 miles south of Pattonsburg, the total length of improvement being 14.814 miles.
(2): Job J1P3366 Route 69 DAVIESS County. Resurface from Route C to north of I-35, the total length of improvement being 8.812 miles.
(3): Job J1S3431 Route N HARRISON County. Resurface from the I-35 interchange to east of Eagleville, the total length of improvement being 0.188 miles.

(1): Job J1P3270 Route 24 CHARITON County. Bridge Deck Replacement over Palmer Creek 0.4 mile west of Rte. MM near Brunswick, the total length of improvement being 0.175 miles.
(2): Job J1S3218 Route M MERCER County. Bridge Replacement over Little Muddy Creek, 2.6 miles east of Rte. 65 near Mercer, the total length of improvement being 0.031 miles.
(3): Job J1S3263 Route TT CHARITON County. Bridge Deck Replacement over Turkey Creek 1.1 miles east of Rte. 139 near Sumner, the total length of improvement being 0.078 miles.
(4): Job J2S0502 Route 129 CHARITON County. Bridge Deck Replacement over Chariton River 0.5 mile south of Rte. O near Salisbury, the total length of improvement being 0.092 miles.

(1): Job J1P3301 Route 36 CALDWELL County. Resurface on US 36 From Caldwell County Line East to Hamilton EB lanes only, the total length of improvement being 11.469 miles.
(2): Job J1P3368 Route 36 BUCHANAN, DEKALB County. Resurface from .9 miles East of Route 6 (Taylor Road) to just East of Route AC near Ag Expo exit, the total length of improvement being 10.696 miles.

Job J1S3385 Route 116 BUCHANAN County. Bridge Rehabilitation over the Platte River 0.1 miles west of Rte E, the total length of improvement being 0.266 miles.

(1): Job J5P2190 Route 50 COLE County. Bridge Rehabilitation over the Osage River, 0.3 miles west of Route 63 junction, the total length of improvement being 0.344 miles.
(2): Job J5P3442 Route 50 COLE County. Bridge Rehabilitation over the Osage River, 0.3 miles west of the Route 63 junction, the total length of improvement being 0.546 miles.
(3): Job J5P3449 Route 50 COLE County. Bridge Rehabilitation Eastbound US 50 over the Moreau River, the total length of improvement being 0.109 miles.

Job J5P3326 Route 17, 52 MILLER County. Seal coat from Rte. 54 to Rte. 17 on Rte. 52 and from Rte. 52 to Rte. 42 on Rte. 17, the total length of improvement being 22.649 miles.
Job J5P3329 Route 135, W MILLER, MORGAN County. Seal coat from Rte. 50 to Rte. 5 on Rte. 135 and from Rte. Y to Bus. Rte. 54 on Rte. W, the total length of improvement being 47.459 miles.
Job J5P3347 Various Routes, CRAWFORD, MARIES County. Seal Coat on Route F from I-44 to Rte. 19, Rte. CC from Rte. 19 to Rte. C and Rte. 68 from Rte. 63 to 0.5 mile west of I-44, the total length of improvement being 29.927 miles.
Job J5P3382 Route 72 DENT, PHELPS County. Resurface on Rte. 72 from Rte. 63 to Rte. 32, the total length of improvement being 25.371 miles.
Job J5P3401 Route 54 CALLAWAY County. Resurface from County Road 147/143, 2.5 miles north of Kingdom City to the Audrain County Line, the total length of improvement being 6.967 miles.
Job J5P3409 Route 63 BOONE, CALLAWAY County. Resurface from Rte. B in Boone Co. to Rte. 54 in Callaway Co., the total length of improvement being 60.037 miles.

(1): Job J5S3340 Route WW, FF CRAWFORD County. Resurface on Route WW and on Route FF, the total length of improvement being 7.175 miles.
(2): Job J5S3394 Various Routes, CRAWFORD, PHELPS County. Resurface on Rte. BB from Rte. 8 to the end of state maintenance, on Rte. UU from I-44 south outer road to the end of state maintenance, on I-44 south outer road from Rte. ZZ to the Crawford County line and Rte. KK in Phelps County from Rte. 8 to the Crawford County line, the total length of improvement being 17.549 miles.

Job J5S3438 Route J, AA CAMDEN County. Seal coat from Rte. 7 to Rte. 54 on Rte. J and From end of state maintenance to Rte. 54 on Rte. AA, the total length of improvement being 16.231 miles.
Job J6I3492 Route I-70 ST CHARLES County. Resurface from the Warren County Line to Wentzville Pkwy, the total length of improvement being 4.775 miles.
Job J6M0286 Route 270 ST LOUIS County. Sound Wall Repair on I-270 east of Rte. 21, the total length of improvement being 0.0123 miles.
Job J6P3373 Route 364 ST CHARLES, ST LOUIS County. Signing, Guardrail, and Concrete Barrier from Jungs Sta. Road to east of Missouri River, the total length of improvement being 3.365 miles.

(1): Job J6P3418 Route 94 ST CHARLES County. Grading, Pavement, Bridge Rehab, and Wall at Rte 94/364 and Muegge Road, the total length of improvement being 2.05 miles.
(2): Job J6S3304 Route 94 ST CHARLES County. Resurface from Rte 364 to I-70, the total length of improvement being 2.02 miles.
(3): Job J6S3600 Route 94 ST CHARLES County. Grading and Pavement from Pralle lane to Shermann Drive, the total length of improvement being 0.971 miles.

Job J6S3090C Route E JEFFERSON County. Bank Stabilization 0.16 mi. s/o Rte. N in De Soto, the total length of improvement being 0.142 miles.
Job J6S3270 Route Big Bend ST LOUIS County. Bridge replacement at Big Bend over I-44, the total length of improvement being 0.18 miles.

(1): Job J7I3258 Route I-49 BATES, CASS County. Resurface on Rte. A and Rte. B in Archie to Rte. A and Rte. B in Rich Hill, the total length of improvement being 52.745 miles.
(2): Job J7S3295 Route 18 BATES, HENRY County. Resurface from east of I-49 in Adrian to County Road 1601 in Henry County, the total length of improvement being 17.519 miles.

Job J9S3504 Route D WAYNE County. Grading, pavement and culvert extension from East Fork Lost Creek to south of Co Rd 524, the total length of improvement being 1.235 miles.
Logged
Counties: Counties visited
Travel Mapping: Summary

kphoger

  • *
  • Offline Offline

  • Posts: 20202
  • Location: Wichita, KS
  • Last Login: September 05, 2021, 06:26:16 PM
Re: MODOT Contract Lettings
« Reply #155 on: August 23, 2021, 01:21:51 PM »

By the way, thank you for posting the county name so prominently on these.  It makes it much easier to scan through them and see if any interest me.
Logged
Keep right except to pass.  Yes.  You.
Visit scenic Orleans County, NY!
Male pronouns, please.

Quote from: Philip K. Dick
If you can control the meaning of words, you can control the people who must use them.

mvak36

  • *
  • Offline Offline

  • Posts: 1059
  • Last Login: September 20, 2021, 11:38:51 PM
Re: MODOT Contract Lettings
« Reply #156 on: August 24, 2021, 10:06:00 AM »

By the way, thank you for posting the county name so prominently on these.  It makes it much easier to scan through them and see if any interest me.

Sure no problem. That's how they have it on their Plans site. I just copy those over so I can't really take credit for that.
Logged
Counties: Counties visited
Travel Mapping: Summary

SkyPesos

  • *
  • Offline Offline

  • Posts: 3070
  • I-75: The clown of the Interstate Highway System.

  • Age: 18
  • Location: Cincinnati, OH/Lafayette, IN
  • Last Login: Today at 02:00:35 AM
Re: MODOT Contract Lettings
« Reply #157 on: August 24, 2021, 11:34:57 AM »

(1): Job J6P3418 Route 94 ST CHARLES County. Grading, Pavement, Bridge Rehab, and Wall at Rte 94/364 and Muegge Road, the total length of improvement being 2.05 miles.
(2): Job J6S3304 Route 94 ST CHARLES County. Resurface from Rte 364 to I-70, the total length of improvement being 2.02 miles.
(3): Job J6S3600 Route 94 ST CHARLES County. Grading and Pavement from Pralle lane to Shermann Drive, the total length of improvement being 0.971 miles.
Iím guessing the bridge rehab for MO 94 and Muegge is the in planning DDI? If itís not, then whatever this bridge rehab is would be a waste imo.
Also interesting that theyíre going to resurface MO 94 between 364 and I-70 now when there are plans later this decade to turn that section into a freeway w/ frontage lanes.
Logged
Traveled 2di: 4, 5, 10, 20, 24, 26, 29, 35, 39, 40, 44, 55, 57, 64, 65, 66, 68, 69, 70, 71, 72, 74, 75, 76, 77, 78, 79, 80, 81, 83, 84, 85, 87, 88, 90, 91, 93, 94, 95
Cities I've lived in: Cincinnati/Columbus, OH/Lafayette, IN/St Louis/Fuzhou
My Fictional Highways

mvak36

  • *
  • Offline Offline

  • Posts: 1059
  • Last Login: September 20, 2021, 11:38:51 PM
Re: MODOT Contract Lettings
« Reply #158 on: August 24, 2021, 11:41:23 AM »

(1): Job J6P3418 Route 94 ST CHARLES County. Grading, Pavement, Bridge Rehab, and Wall at Rte 94/364 and Muegge Road, the total length of improvement being 2.05 miles.
(2): Job J6S3304 Route 94 ST CHARLES County. Resurface from Rte 364 to I-70, the total length of improvement being 2.02 miles.
(3): Job J6S3600 Route 94 ST CHARLES County. Grading and Pavement from Pralle lane to Shermann Drive, the total length of improvement being 0.971 miles.
Iím guessing the bridge rehab for MO 94 and Muegge is the in planning DDI? If itís not, then whatever this bridge rehab is would be a waste imo.
Also interesting that theyíre going to resurface MO 94 between 364 and I-70 now when there are plans later this decade to turn that section into a freeway w/ frontage lanes.

I haven't looked at the plans (not sure I would understand it even I did), but the link you posted shows the Contract Award as October 2021 which lines up with when this letting gets awarded.
Logged
Counties: Counties visited
Travel Mapping: Summary

mvak36

  • *
  • Offline Offline

  • Posts: 1059
  • Last Login: September 20, 2021, 11:38:51 PM
Re: MODOT Contract Lettings
« Reply #159 on: August 24, 2021, 12:00:29 PM »

(1): Job J6P3418 Route 94 ST CHARLES County. Grading, Pavement, Bridge Rehab, and Wall at Rte 94/364 and Muegge Road, the total length of improvement being 2.05 miles.
(2): Job J6S3304 Route 94 ST CHARLES County. Resurface from Rte 364 to I-70, the total length of improvement being 2.02 miles.
(3): Job J6S3600 Route 94 ST CHARLES County. Grading and Pavement from Pralle lane to Shermann Drive, the total length of improvement being 0.971 miles.
Iím guessing the bridge rehab for MO 94 and Muegge is the in planning DDI? If itís not, then whatever this bridge rehab is would be a waste imo.
Also interesting that theyíre going to resurface MO 94 between 364 and I-70 now when there are plans later this decade to turn that section into a freeway w/ frontage lanes.

Is there enough room to make it a freeway? It looks fairly built up as it gets closer to I-70.
Logged
Counties: Counties visited
Travel Mapping: Summary

SkyPesos

  • *
  • Offline Offline

  • Posts: 3070
  • I-75: The clown of the Interstate Highway System.

  • Age: 18
  • Location: Cincinnati, OH/Lafayette, IN
  • Last Login: Today at 02:00:35 AM
Re: MODOT Contract Lettings
« Reply #160 on: August 24, 2021, 11:12:20 PM »

(1): Job J6P3418 Route 94 ST CHARLES County. Grading, Pavement, Bridge Rehab, and Wall at Rte 94/364 and Muegge Road, the total length of improvement being 2.05 miles.
(2): Job J6S3304 Route 94 ST CHARLES County. Resurface from Rte 364 to I-70, the total length of improvement being 2.02 miles.
(3): Job J6S3600 Route 94 ST CHARLES County. Grading and Pavement from Pralle lane to Shermann Drive, the total length of improvement being 0.971 miles.
I’m guessing the bridge rehab for MO 94 and Muegge is the in planning DDI? If it’s not, then whatever this bridge rehab is would be a waste imo.
Also interesting that they’re going to resurface MO 94 between 364 and I-70 now when there are plans later this decade to turn that section into a freeway w/ frontage lanes.

Is there enough room to make it a freeway? It looks fairly built up as it gets closer to I-70.
I think the plan is to keep the SPUI at I-70, instead of turning it into something fancier.

Though a (much cheaper) alternative to the full freeway is just to widen the entire stretch between MO 364 and I-70 to 6 lanes. Based on the wording of the contract above for MO 94, that could be possible this time around, instead of doing a freeway.

EDIT: I found this on the presentation in the link above. So including auxiliary lanes, I guess they're widening it to 8 lanes.
« Last Edit: August 24, 2021, 11:15:23 PM by SkyPesos »
Logged
Traveled 2di: 4, 5, 10, 20, 24, 26, 29, 35, 39, 40, 44, 55, 57, 64, 65, 66, 68, 69, 70, 71, 72, 74, 75, 76, 77, 78, 79, 80, 81, 83, 84, 85, 87, 88, 90, 91, 93, 94, 95
Cities I've lived in: Cincinnati/Columbus, OH/Lafayette, IN/St Louis/Fuzhou
My Fictional Highways

mvak36

  • *
  • Offline Offline

  • Posts: 1059
  • Last Login: September 20, 2021, 11:38:51 PM
Re: MODOT Contract Lettings
« Reply #161 on: September 14, 2021, 06:05:49 PM »

The winning bids for the August letting were awarded at the MHTC meeting on 9/9/21.
Logged
Counties: Counties visited
Travel Mapping: Summary

mvak36

  • *
  • Offline Offline

  • Posts: 1059
  • Last Login: September 20, 2021, 11:38:51 PM
Re: MODOT Contract Lettings
« Reply #162 on: September 14, 2021, 06:15:45 PM »

October 15, 2021 Letting:

Projects listed in blue font are part of Missouri Focus on Bridges program.

(1): Job J1P3252 Route 65 GRUNDY County. Bridge rehabilitation over Rte. 6 in Trenton, the total length of improvement being 0.077 miles.
(2): Job J1P3255 Route 36 LIVINGSTON County. Bridge rehabilitation over Blackwell Creek, 1.2 miles east of Rte. 65 near Chillicothe, the total length of improvement being 0.087 miles.
(3): Job J1S3259 Route UU CARROLL County. Bridge redeck over Turkey Creek 5.8 miles east of Rte. 65 near Carrollton, the total length of improvement being 0.114 miles.
(4): Job J1S3264 Route 139 CARROLL County. Bridge redeck over Hurricane Creek 2.9 miles south of Rte. HH near Hale, the total length of improvement being 0.099 miles.
(5): Job J1S3265 Route UU CARROLL County. Bridge redeck over Big Creek 5.9 miles east of Rte. 65 near Carrollton, the total length of improvement being 0.163 miles.
(6): Job J1S3266 Route 116 CALDWELL County. Bridge redeck over the Union Pacific Railroad 2 miles east of Rte. 13 near Polo, the total length of improvement being 0.103 miles.

Job J2P3281 Route 24 MARION County. Pavement repair and diamond grinding from 0.9 mile east of Rte. 61 to Mississippi River at West Quincy, the total length of improvement being 6.299 miles.

(1): Job J2S3208 Route TT ST CHARLES, WARREN County. Resurface from Route 94 near Dutzow to Route T in St. Charles County, the total length of improvement being 3.54 miles.
(2): Job J2S3239 Route A LINCOLN, WARREN County. Resurface from Route DD to I-70 near Pendleton in Warren County, the total length of improvement being 12.922 miles.
(3): Job J2S3240 Route U LINCOLN County. Resurface on Route 47 to Route J South Junction near Troy, the total length of improvement being 8.877 miles.

Job J2S3296 Route MM MARION County. Resurface from Rte. 24 to Rte. 61 in Hannibal and 0.4 mile east of Rte. 24 on outer road, the total length of improvement being 7.054 miles.
Job J2S3441 Route OR 70 MONTGOMERY, WARREN County. Resurface on Route Y in Jonesburg to 0.15 Mile West of West Warrenton Boulevard, the total length of improvement being 7.513 miles.

(1): Job J3S3148 Route H SALINE County. Resurface from Route 65 to Oleander Ave in Nelson, the total length of improvement being 11.719 miles.
(2): Job J3S3171 Route WW SALINE County. Resurface from Business Route 65 to 197th Trail, near Marshal, the total length of improvement being 3.467 miles.

Job J3S3161 Route E JOHNSON County. Resurface from Route 13 to Route NN, the total length of improvement being 13.513 miles.

(1): Job J4P3009 Route 50 JACKSON County. Bridge replacement over Chipman Road near Lee's Summit, the total length of improvement being 0.313 miles.
(2): Job J4P3009B Route 50 JACKSON County. Grading and pavement from w/o Murray Road to w/ Blue Parkway, the total length of improvement being 0.454 miles.

Job J4S3247 Route 152 PLATTE County. Coldmill and resurface from Route N to the west side of I-29, the total length of improvement being 5.238 miles.
Job J4S3340 Route 169 CLAY County. Resurface from Route KK to Clay/Clinton County Line, the total length of improvement being 3.849 miles.
Job J5P3328 Route Various VARIOUS County. Resurface and add shoulders Rte. 7 from Rte. 5 to Rte. 133, Rte. 52 from Rte. 17 to Rte. 133, and Rte. 133 in Richland, the total length of improvement being 39.5 miles.
Job J6I3541 Route I-70, 364 VARIOUS County. Bridge washing on I-70 and Rte. 364, the total length of improvement being 1.837 miles.
Job J6M0285 Route 340 ST LOUIS County. Erosion and pipe repair 1 mile west of route 170 at River Des Peres in University City, the total length of improvement being 0.013 miles.
Job J6P3637 Route 67 ST LOUIS County. Guard cable installation from Missouri River to north of New Jamestown Road, the total length of improvement being 1.343 miles.
Job J6Q3227E Route Various VARIOUS County. ITS maintenance within St. Louis District, the total length of improvement being 0 miles.

(1): Job J6S3303 Route 94 ST CHARLES County. Pavement preservation treatment from I-64 to Route 364, the total length of improvement being 3.514 miles.
(2): Job J6S3305 Route D ST CHARLES County. Preventative maintenance treatment from Route T to Route Z, the total length of improvement being 4.9 miles.

Job J6S3317 Route 94 ST CHARLES County. 3 Bridge rehabilitations at various locations near Saint Peters, the total length of improvement being 0.094 miles.

(1): Job J6S3429 Route 70 ST LOUIS CITY County. 14 Bridge rehabilitations at various overpasses from North Hanley Road to Madison St, the total length of improvement being 6.9 miles.
(2): Job J6S3429B Route 70 ST LOUIS CITY County. Bridge rehabilitation at Adelaide Avenue over City Streets and Railroads, the total length of improvement being 0.302 miles.

Job J6S3657 Route Various ST CHARLES, ST LOUIS County. Pavement repair on Various Routes in St. Charles and St. Louis Counties, the total length of improvement being 7.082 miles.

(1): Job J7S3304 Route D NEWTON County. Resurface from Mink Drive in Neosho to Route 76 in Longview, the total length of improvement being 12.995 miles.
(2): Job J7S3305 Route HH NEWTON County. Resurface from Route 86 to Route 60 in Neosho, the total length of improvement being 1.523 miles.
(3): Job J7S3307 Route H MCDONALD County. Resurface from Route 90 in Noel to Business 71 near Pineville, the total length of improvement being 7.052 miles.

(1): Job J7S3293B Route A, K WEBSTER County. Resurface and add shoulders on Route A from Route 38 to Route 60 and on Route K from Route 60 to Route 14, the total length of improvement being 27.463 miles.
(2): Job J7S3346 Route 38 WEBSTER County. Resurface from Route J to east of Blair Street in Marshfield, the total length of improvement being 2.1 miles.

(1): Job J7S3294 Route BB VERNON County. Resurface from Rte. 54 in Nevada to end of route I-49 south Milo., the total length of improvement being 13.308 miles.
(2): Job J7S3303 Route W VERNON County. Coldmill and resurface from beginning of route to Rte. 54 in Nevada, the total length of improvement being 3.648 miles.

Job J7L21ROA Route ROA BARRY County. Resurface in Roaring River State Park, the total length of improvement being 4.587 miles.
Job J9S3390 Route 63 HOWELL County. Resurface from McFarland street to Rte. 63 in West Plains, the total length of improvement being 4.27 miles.

EDIT: Additional letting added
(1): Job J6S3272 Route I-44 ST LOUIS CITY County. Bridge replacement at Broadway over I-44, the total length of improvement being 0.314 miles.
(2): Job J6S3638 Route I-44 ST LOUIS CITY County. Grading and pavement to rebuild off ramp from I-44 express lane to Broadway, the total length of improvement being 0.314 miles.
« Last Edit: September 16, 2021, 03:49:50 PM by mvak36 »
Logged
Counties: Counties visited
Travel Mapping: Summary

 


Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.