Plans for the I-295 NB third lane project got an update recently as well, with a roundabout now planned at the end of the I-95 Airport Road ramp.
https://deldot.gov/projects/index.shtml?dc=details&projectNumber=T202109101
After endless construction here, now they decide to add a lane?
What they did before was all part of the process to add that 3rd lane. This should be pretty easy to put in a lane now.
The biggest project with the preferred alternative...even though it'll be 3 lanes for about 1/2 mile prior to the split, we'll still find a lot of crowding into the right 2 lanes from Rt. 1 to that point.
Still not happy with the way they took I-295 on the SB side and made them lose a lane just after the merge with 95. Seriously congests 295 now, especially during times when traffic was lighter and no congestion existed earlier.
Agreed.
That area needs a rebuild that I hope someday happens as follows:
-295 SB remains 4 lanes after the 495 N exit
-295 SB becomes 3 lanes after the Newport exit
-295 then splits, the center and right lanes merge onto 95 south 'thru'
-the left and center lane flyover to serve as the exit for 4A,B,C and 3
Going further
95SB at the 495 merge splits:
-3 lanes are 95 SB thru, 2 lanes are for exits 5-3.