Regional Boards > Southeast

Greensboro Urban Loop

<< < (2/55) > >>

ATLRedSoxFan:
Was just through there yesterday on my way to Boston from Atlanta. I gotta say, from what I saw where I-85 is concerned, once it's finished the entire way through NC, it will be a sweet drive. NC has done a really great job with the upgrades through the Triad area as well as Charlotte and you can see there's more to come.

Buummu:
I just want to see the Greensboro Urban Loop complete... and now i hear that they plan to delay the projects for the Loop again.. WHAT... politics...

Strider:
Thread resurrection!

So far, The Greensboro Urban Loop is nearly 3/4 complete.

The section of I-840 from I-73/Bryan Blvd interchange to US 220 will be open in March 2018, with the extension to Lawndale Drive currently under construction; while the Eastern section (I-785/I-840, but will only be signed as I-785 for now) from US 70 to US 29 will be open by the end of the year if possible even though it is scheduled to be complete in Dec. 2018.

They are starting the bid for the final section of the Loop between Lawndale and US 29.

Strider:
And signages are already up for I-785. I hope bob7374 sends in some photos. For more information on the GUL, (Greensboro Urban Loop), go to this website:

http://www.malmeroads.net/ncfutints/futloop.html

bob7374:

--- Quote from: Strider on October 29, 2017, 09:39:38 PM ---And signages are already up for I-785. I hope bob7374 sends in some photos. For more information on the GUL, (Greensboro Urban Loop), go to this website:

http://www.malmeroads.net/ncfutints/futloop.html


--- End quote ---
New photos have been posted in the link above in the section devoted to the Northeast Segment (I-785/I-840).

Navigation

[0] Message Index

[#] Next page

[*] Previous page

Go to full version