Regional Boards > Northwest

I-5 Columbia River Crossing (OR/WA)

<< < (47/53) > >>

Sub-Urbanite:
For this bridge, design isn't going to play much of a factor, I don't think.

It has to be high enough for boats and low enough for Pearson Field and PDX.

And, fingers crossed, there's a design that fits within that Venn diagram…

kkt:
Oregon legislature approved $1 billion, Oregon's share of the bridge:

https://www.opb.org/article/2023/06/20/oregon-washington-interstate-5-i5-bridge-replacement-salem-politics-funding/


plain:
$6.3 Billion?? Might as well go for the gusto and build a bridge-tunnel at this point.

kalvado:

--- Quote from: plain on June 21, 2023, 07:08:48 PM ---$6.3 Billion?? Might as well go for the gusto and build a bridge-tunnel at this point.

--- End quote ---
Tunnel for $6B? Where do you think Oregon is, in Sweden or China?

The Ghostbuster:
With a $6.3 billion price tag, it may be a long time before the new CRC crossing is constructed. 2025 seems to be awfully optimistic with that kind of hefty price tag.

Navigation

[0] Message Index

[#] Next page

[*] Previous page

Go to full version