Regional Boards > Northwest
I-5 Columbia River Crossing (OR/WA)
pderocco:
Where are they going to get all that gold leaf?
kkt:
--- Quote from: plain on June 21, 2023, 07:08:48 PM ---$6.3 Billion?? Might as well go for the gusto and build a bridge-tunnel at this point.
--- End quote ---
Oh, by all means, let's spend another $100 million on a study. /s
Bruce:
Tolling on the existing Interstate Bridge is projected to begin in 2025 or 2026 and would be handled by Oregon DOT, according to KGW. Variable price of $1.50 to $3.55 with electronic collection, with an extra charge for photo-plate drivers. Nothing totally confirmed yet due to the uncertainty about the project.
https://www.kgw.com/article/news/local/the-story/interstate-bridge-tolling-timeline/283-6fbeff0f-5392-4b31-a723-8c7105b56670
Sub-Urbanite:
--- Quote from: Bruce on October 21, 2023, 01:23:12 AM ---Tolling on the existing Interstate Bridge is projected to begin in 2025 or 2026 and would be handled by Oregon DOT, according to KGW. Variable price of $1.50 to $3.55 with electronic collection, with an extra charge for photo-plate drivers. Nothing totally confirmed yet due to the uncertainty about the project.
https://www.kgw.com/article/news/local/the-story/interstate-bridge-tolling-timeline/283-6fbeff0f-5392-4b31-a723-8c7105b56670
--- End quote ---
Why would this be handled by ODOT? Just add this to the Good to Go system and call it… good to go?
Revive 755:
--- Quote from: pderocco on April 14, 2023, 12:27:01 AM ---178 feet is ridiculous. According to Wikipedia, the I-205 bridge only has 144 feet of clearance, and there's nothing between the two bridges but a bunch of marinas and houseboats.
--- End quote ---
Maybe the aerial photos are outdated but there appears to be some sort of commercial operation on the river about 1.5 miles east of I-5 bridge.
Navigation
[0] Message Index
[#] Next page
[*] Previous page
Go to full version