Regional Boards > Northwest

I-5 Columbia River Crossing (OR/WA)

<< < (48/51) > >>

pderocco:
Where are they going to get all that gold leaf?

kkt:

--- Quote from: plain on June 21, 2023, 07:08:48 PM ---$6.3 Billion?? Might as well go for the gusto and build a bridge-tunnel at this point.

--- End quote ---

Oh, by all means, let's spend another $100 million on a study.  /s

Bruce:
Tolling on the existing Interstate Bridge is projected to begin in 2025 or 2026 and would be handled by Oregon DOT, according to KGW. Variable price of $1.50 to $3.55 with electronic collection, with an extra charge for photo-plate drivers. Nothing totally confirmed yet due to the uncertainty about the project.

https://www.kgw.com/article/news/local/the-story/interstate-bridge-tolling-timeline/283-6fbeff0f-5392-4b31-a723-8c7105b56670

Sub-Urbanite:

--- Quote from: Bruce on October 21, 2023, 01:23:12 AM ---Tolling on the existing Interstate Bridge is projected to begin in 2025 or 2026 and would be handled by Oregon DOT, according to KGW. Variable price of $1.50 to $3.55 with electronic collection, with an extra charge for photo-plate drivers. Nothing totally confirmed yet due to the uncertainty about the project.

https://www.kgw.com/article/news/local/the-story/interstate-bridge-tolling-timeline/283-6fbeff0f-5392-4b31-a723-8c7105b56670

--- End quote ---

Why would this be handled by ODOT? Just add this to the Good to Go system and call it… good to go?

Revive 755:

--- Quote from: pderocco on April 14, 2023, 12:27:01 AM ---178 feet is ridiculous. According to Wikipedia, the I-205 bridge only has 144 feet of clearance, and there's nothing between the two bridges but a bunch of marinas and houseboats.
--- End quote ---

Maybe the aerial photos are outdated but there appears to be some sort of commercial operation on the river about 1.5 miles east of I-5 bridge.

Navigation

[0] Message Index

[#] Next page

[*] Previous page

Go to full version