Quote from: southshore720 on August 25, 2021, 12:35:57 PM
Quote from: abqtraveler on August 24, 2021, 09:43:07 AM
Quote from: chays on August 24, 2021, 01:02:24 AM
What is the latest on the I-95 exit renumbering project? From what I read, this project was supposed to start in late 2020, but I see no news about any progress let alone completion.
Last update I got back in the spring is that RIDOT needs additional funding to complete the exit renumbering on I-95. There's no timetable at this time as to when that may happen.
I wonder if these funding woes are also delaying the Route 146 signage replacement project as well.  They finished the North Smithfield contract, but the Providence to Lincoln contract remains in limbo.  The last movement on the project was the supplemental exit number signs.
Any updates on completing the Rte 146 signing project from Providence to Lincoln?  Is the pandemic/supply chain to blame for the delays?


abqtraveler

Quote from: southshore720 on November 17, 2021, 01:56:17 PM
Quote from: southshore720 on August 25, 2021, 12:35:57 PM
Quote from: abqtraveler on August 24, 2021, 09:43:07 AM
Quote from: chays on August 24, 2021, 01:02:24 AM
What is the latest on the I-95 exit renumbering project? From what I read, this project was supposed to start in late 2020, but I see no news about any progress let alone completion.
Last update I got back in the spring is that RIDOT needs additional funding to complete the exit renumbering on I-95. There's no timetable at this time as to when that may happen.
I wonder if these funding woes are also delaying the Route 146 signage replacement project as well.  They finished the North Smithfield contract, but the Providence to Lincoln contract remains in limbo.  The last movement on the project was the supplemental exit number signs.
Any updates on completing the Rte 146 signing project from Providence to Lincoln?  Is the pandemic/supply chain to blame for the delays?

Okay, there's about a trillion dollars in infrastructure money about to rain down on every state, so I would find it hard for RIDOT to come up with an excuse not to finish the Rt 146 signing and renumbering exits on I-95.
2-d Interstates traveled:  4, 5, 8, 10, 15, 20, 24, 25, 27, 29, 35, 39, 40, 41, 43, 45, 49, 55, 57, 64, 65, 66, 69, 70, 71, 72, 74, 75, 76(E), 77, 78, 81, 83, 84(W), 85, 87(N), 89, 90, 91, 93, 94, 95

2-d Interstates Clinched:  12, 22, 30, 37, 44, 59, 80, 84(E), 86(E), 238, H1, H2, H3, H201

bob7374


southshore720


yakra

Is the new ramp signed as Exit 6B?
"Officer, I'm always careful to drive the speed limit no matter where I am and that's what I was doin'." Said "No, you weren't," she said, "Yes, I was." He said, "Madam, I just clocked you at 22 MPH," and she said "That's the speed limit," he said "No ma'am, that's the route numbah!"  - Gary Crocker

bob7374

Quote from: yakra on November 21, 2021, 12:43:33 PM
Is the new ramp signed as Exit 6B?
It's Exit 3B, as part the milepost exit system put in place in 2019.

Mergingtraffic

Henderson Bridge button copy still hanging on.  The Exit is closed but the sign hasn't been touched.
I only take pics of good looking signs. Long live non-reflective button copy!
MergingTraffic https://www.flickr.com/photos/98731835@N05/

yakra

Quote from: bob7374 on November 21, 2021, 03:16:46 PM
It's Exit 3B, as part the milepost exit system put in place in 2019.
Oops, 'swhat I meant. Musta gotten confused by the route number. :pan:
"Officer, I'm always careful to drive the speed limit no matter where I am and that's what I was doin'." Said "No, you weren't," she said, "Yes, I was." He said, "Madam, I just clocked you at 22 MPH," and she said "That's the speed limit," he said "No ma'am, that's the route numbah!"  - Gary Crocker

southshore720

I drove on RI 10 North the other night and there is no permanent BGS signage yet for New Exit 3B to US 6 West.  There are temporary orange construction signs, but they are small and can easily be missed.  You almost have to be "in the know" to know the ramp's existence and to be prepared to exit left.  Unsure if GPS has recorded the new movement yet.

Beeper1

And knowing RIDOT's signing practices, that's all we are going to get.  Once the temp construction signs fall down they will put paper-thin sheet metal LGSs at the gore and mayyyybe 1/4 mile advance.   Ground mount, on the right hand side on the road, with all-caps-but-still-too-small lettering.

southshore720


Any updates on completing the Rte 146 signing project from Providence to Lincoln?  Is the pandemic/supply chain to blame for the delays?

Like the I-95 mileage exit # renumbering, this also went out for re-advertisement/re-bid.  Bids in by 2/2022 and a completion date of 6/2024.  I still don't understand why this was broken up into two contracts.

abqtraveler

Quote from: southshore720 on December 05, 2021, 09:13:35 PM

Any updates on completing the Rte 146 signing project from Providence to Lincoln?  Is the pandemic/supply chain to blame for the delays?

Like the I-95 mileage exit # renumbering, this also went out for re-advertisement/re-bid.  Bids in by 2/2022 and a completion date of 6/2024.  I still don't understand why this was broken up into two contracts.
Are the two signing contracts for Rt 146 complete sign replacements? If so, getting the project done in 2 years would still be faster than the time it takes Connecticut to do the same thing there.
2-d Interstates traveled:  4, 5, 8, 10, 15, 20, 24, 25, 27, 29, 35, 39, 40, 41, 43, 45, 49, 55, 57, 64, 65, 66, 69, 70, 71, 72, 74, 75, 76(E), 77, 78, 81, 83, 84(W), 85, 87(N), 89, 90, 91, 93, 94, 95

2-d Interstates Clinched:  12, 22, 30, 37, 44, 59, 80, 84(E), 86(E), 238, H1, H2, H3, H201

southshore720

Quote from: abqtraveler on December 06, 2021, 08:56:46 AM
Quote from: southshore720 on December 05, 2021, 09:13:35 PM

Any updates on completing the Rte 146 signing project from Providence to Lincoln?  Is the pandemic/supply chain to blame for the delays?

Like the I-95 mileage exit # renumbering, this also went out for re-advertisement/re-bid.  Bids in by 2/2022 and a completion date of 6/2024.  I still don't understand why this was broken up into two contracts.
Are the two signing contracts for Rt 146 complete sign replacements? If so, getting the project done in 2 years would still be faster than the time it takes Connecticut to do the same thing there.
Yes, full replacements.  And you are absolutely right about CT!!

southshore720


kernals12

Work is getting started on the rebuilding of the Washington Bridge in Providence


The structurally deficient bridge is being refurbished and major operational improvements will be made:

-Partial widening to provide five continuous lanes of I-195 westbound traffic over the bridge.
-A new bridge structure in East Providence to carry traffic from the Taunton Avenue/Warren Avenue/Veterans Memorial Parkway on-ramps over the new off-ramp to Waterfront Drive.
-A new bridge structure to carry traffic from Gano Street in Providence onto I-195 westbound.
-Restriping of I-195 westbound from the Broadway overpass to the new Waterfront Drive off-ramp to allow four lanes of through traffic on the mainline, eliminating the current lane drop at Broadway.
-Adding a through lane on the western end of the Washington Bridge to reduce the weaving movements between the Taunton Avenue/Warren Avenue/Veterans Memorial Parkway on-ramps and the Gano Street off-ramp.

Rhode Island is really making some impressive improvements to its highways.

kernals12

RIDOT has issued a contract for the construction of a new overpass on RI 146. That will make the road entire a freeway out to the Massachusetts border and leaves just one unimproved section between Providence and Worcester

Ted$8roadFan


Rothman

Please note: All comments here represent my own personal opinion and do not reflect the official position(s) of NYSDOT.

The Ghostbuster

It looks like everything between RI 99 and RI 146A will have to be plowed down to make these improvements. Do the locals support upgrading this segment of RI 146?

kernals12

Quote from: The Ghostbuster on April 19, 2022, 02:25:12 PM
It looks like everything between RI 99 and RI 146A will have to be plowed down to make these improvements. Do the locals support upgrading this segment of RI 146?

They're not adding any travel lanes. That dotted line just shows where they're adding wrong way signals and modifying acceleration ramps

vdeane

Quote from: kernals12 on April 19, 2022, 04:50:26 PM
Quote from: The Ghostbuster on April 19, 2022, 02:25:12 PM
It looks like everything between RI 99 and RI 146A will have to be plowed down to make these improvements. Do the locals support upgrading this segment of RI 146?

They're not adding any travel lanes. That dotted line just shows where they're adding wrong way signals and modifying acceleration ramps
The page says something about building frontage roads.  Are those not going to get rid of all the driveways directly on RI 146?  Many of those homes/businesses seem rather close.
Please note: All comments here represent my own personal opinion and do not reflect the official position of NYSDOT or its affiliates.

MATraveler128

Quote from: vdeane on April 19, 2022, 08:17:05 PM
Quote from: kernals12 on April 19, 2022, 04:50:26 PM
Quote from: The Ghostbuster on April 19, 2022, 02:25:12 PM
It looks like everything between RI 99 and RI 146A will have to be plowed down to make these improvements. Do the locals support upgrading this segment of RI 146?

They're not adding any travel lanes. That dotted line just shows where they're adding wrong way signals and modifying acceleration ramps
The page says something about building frontage roads.  Are those not going to get rid of all the driveways directly on RI 146?  Many of those homes/businesses seem rather close.

I noticed that too. If RIDOT built this out, the businesses would probably relocate. Rhode Island isn't exactly a state known for building frontage roads, I'm curious as to how this would work.
Decommission 128 south of Peabody!

Lowest untraveled number: 56

kernals12

Quote from: vdeane on April 19, 2022, 08:17:05 PM
Quote from: kernals12 on April 19, 2022, 04:50:26 PM
Quote from: The Ghostbuster on April 19, 2022, 02:25:12 PM
It looks like everything between RI 99 and RI 146A will have to be plowed down to make these improvements. Do the locals support upgrading this segment of RI 146?

They're not adding any travel lanes. That dotted line just shows where they're adding wrong way signals and modifying acceleration ramps
The page says something about building frontage roads.  Are those not going to get rid of all the driveways directly on RI 146?  Many of those homes/businesses seem rather close.

It looks like they are in fact planning to do that. Luckily it appears the buildings have setbacks large enough to accommodate it.

kernals12

Quote from: BlueOutback7 on April 19, 2022, 08:38:12 PM
Quote from: vdeane on April 19, 2022, 08:17:05 PM
Quote from: kernals12 on April 19, 2022, 04:50:26 PM
Quote from: The Ghostbuster on April 19, 2022, 02:25:12 PM
It looks like everything between RI 99 and RI 146A will have to be plowed down to make these improvements. Do the locals support upgrading this segment of RI 146?

They're not adding any travel lanes. That dotted line just shows where they're adding wrong way signals and modifying acceleration ramps
The page says something about building frontage roads.  Are those not going to get rid of all the driveways directly on RI 146?  Many of those homes/businesses seem rather close.

I noticed that too. If RIDOT built this out, the businesses would probably relocate. Rhode Island isn't exactly a state known for building frontage roads, I'm curious as to how this would work.

I hope they start a trend in the region

southshore720

I doubt the car dealerships will move.  They've been there forever.  The other major business on that stretch is the Drive-In Movie Theater, and that is set back enough not to take a hit.