News:

Thank you for your patience during the Forum downtime while we upgraded the software. Welcome back and see this thread for some new features and other changes to the forum.

Main Menu

Federal Aid Secondary Route System

Started by cahwyguy, February 03, 2018, 12:48:56 AM

Previous topic - Next topic

cahwyguy

More from the Nov/Dec 66 CHPW: "Grade and pave to reconstruct and widen South Street (Federal Aid Secondary Route 737) from two to four lanes as an urban extension project between the San Gabriel River in Artesia and Carmenita Avenue in Dairy Valley, a distance of 3.3 miles. Estimated cost, $1,230,000, of which the State will pay 615,000, Dairy Valley, $499,000, and Artesia $116,000."

Does anyone know more about the Federal Aid Secondary Route system in California? How much does it overlap with post-1964 state routes?
Daniel - California Highway Guy ● Highway Site: http://www.cahighways.org/ ●  Blog: http://blog.cahighways.org/ ● Podcast (CA Route by Route): http://caroutebyroute.org/ ● Follow California Highways on Facebook: https://www.facebook.com/cahighways



Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.