Mergingtraffic:
I figured I would post here some road news from Connecticut!

1) I-84 widening EIS is underway this past year and a new website is up:
http://www.i-84eis.com/

1A) New CT-8 Study being started:
http://www.route8study.com/

1B) Proposal for a new stack interchange at I-84/CT-8 In Waterbury....only $$ for the study, no $$ for anything else to proceed...should wrap up this year.
http://www.i84wins.com/

2) A lot of projects have been delayed b/c of the economy...here is a partial list of the major ones:

A) Extension of Route 11 Expressway...a lot are mad over this, they are blaming the governor as not being aggressive enough.  There is $$ for preliminary engineering work to begin but it's delayed anyway.  Congressman Joe Courtney and local politicians are demanding answers. 

B) I-84 Widening between Exits 22-25A to 6-lanes.....it was supposed to start this year....the last 3 miles to go and it's delayed!

C) I-84, CT-9 & CT-4 flyover connection project.....supposed to connect CT-4 SB to CT-9 SB and add flyover (or under) ramps from I-84 to CT-4 replacing the current left exits and entrances.

D) 4-laning of US-6 & US-202 in Danbury.

E) CT-15 & US-7 full interchange project.....started in 2005 until NIMBYs sued and halted work claiming loss of character.  It would have been finished by now! Uggh!

The DOT is supposed to release a list of priority projects next month.  They are also hoping for a new transportation bill from congress.  They say if that happens, some of these projects could proceed again.

New US-7 Expressway extension in Brookfield set to open next month.  New striping is down and only flimsy "Road Closed" barriers remain.  Although, the left lane ends abruptly and you have to use Exit 12 (which is the temporary ending)...but once the new highway opens it'll be a mute issue!

Portions of the new CT-72 boulevard in Bristol on track to open in March.

CT-2 Bypass around Foxwoods opened in August as an access-fully controlled super 4!

More to come...

kurumi:
Cool... I'm visiting family in mid-December and will make roadtrips to "the 2" and "the 7"

Alps:

--- Quote from: kurumi on October 29, 2009, 01:01:40 PM ---Cool... I'm visiting family in mid-December and will make roadtrips to "the 2" and "the 7"

--- End quote ---
Be on the lookout for a meet involving some of those projects.

shadyjay:
Wondering if they'll fix the incorrect exit number sequence going south.  Also, I'm sure the button copy Phase I signage is in jeopardy.  Though if they wanted to fix the signage on Exit 12, all they gotta do is remove the "TO" from the US 202 shield.  The rest is still relevant.

Mergingtraffic:

--- Quote from: shadyjay on November 04, 2009, 03:19:38 PM ---Wondering if they'll fix the incorrect exit number sequence going south.  Also, I'm sure the button copy Phase I signage is in jeopardy.  Though if they wanted to fix the signage on Exit 12, all they gotta do is remove the "TO" from the US 202 shield.  The rest is still relevant.

--- End quote ---

yes, the original 1978 button copy signage on US-7 north of I-84 will be replaced sometime next year...I saw it on the DOT TIP. 
Actually, the original singage that says "To US-202 New Milford" on Exit 12 NB has already been replaced with new signage.  It is still called Exit 12.  Although the exit tab is now on the right.