Letting schedule: I-30/I-35E interchange & Trinity River bridges redo in Dallas
Found this in a local DFW online forum, the poster found the info from TxDOT:
*************************************************
CCSJ: 1068-04-116
District: Dallas
Let Date: DEC 2012
Highway: IH 30
Let Status: Tentative
CSJ: 0009-11-226
Fund Cat: 3
Description: RECONSTRUCT INTERCHANGE WITH HOV / MANAGED LANES AND COLLECTOR
Limits From: IH 35E INTERCHANGE Limits To: WEST OF HOTEL STREET
Length: 0.5 Miles
Estimate: 114,200,000
District: Dallas
Let Date: DEC 2012
Highway: IH 35E
Let Status: Tentative
CSJ: 0196-03-205
Fund Cat: 2M
Description: RECONSTRUCT INTERCHANGE WITH HOV / MANAGED LANES AND COLLECTOR
Limits From: SOUTH OF IH 30
Limits To: SOUTH OF COMMERCE STREET
Length: 0.8 Miles
Estimate: 228,400,000
District: Dallas
Let Date: DEC 2012
Let Status: Tentative
Highway: IH 35E
Project ID: BR 2004(426) CSJ: 0442-02-118
Fund Cat: 6
Description: REPLACE BR & APPRS
Limits From: AT TRINITY RIVER
Length: 0.5 Miles
Limits To: NB & SB
Estimate: 101,000,000
District: Dallas
Let Date: DEC 2012
Highway: IH 35E
Let Status: Tentative
Fund Cat: 11
Project ID: BOR 2003(38) CSJ: 0442-02-132
Description: RECONSTRUCT, ADD COLLECTOR / DISTRIBUTOR ROADS AND HOV / MANAGED
Limits From: SOUTH OF COLORADO BLVD
Limits To: SOUTH OF IH 30
Length: 0.5 Miles
Estimate: $62,000,000
District: Dallas
Let Date: DEC 2012
Highway: IH 30
Let Status: Tentative
Project ID: BR ( ) CSJ: 1068-04-099
Fund Cat: 6
Description: REPLACE BRIDGES AND APPROACHES
Limits From: AT BECKLEY, AT TRINITY RIVER, AND
Limits To: AT RIVERFRONT BLVD
Length: 0.0
Estimate: $42,000,000
District: Dallas
Let Date: DEC 2012
Highway: IH 30
Let Status: Tentative
Project ID: IMD 2002(40) CSJ: 1068-04-116
Fund Cat: 3
Description: WIDEN AND RECONSTRUCT FREEWAY WITH HOV / MANAGED &
Limits From: EAST OF SYLVAN AVE Limits
To: IH 35E
Length: 1.5 Miles
Estimate: 152,400,000
-------------------
Totals for 1068-04-116
Length: 3.8 Miles
Estimate: 700,000,000