I just noticed an updated "project overview briefing packet" on the project web site
http://www.ih45northandmore.com/docs4/20170327_NHHIP_Presentation_Project%20Overview%20Briefing%20for%20Website.pdfProject site
http://www.ih45northandmore.com/On the last page there is a cost summary for the downtown work
Construction: $3.067 billion
Right-of-way: $875.4 billion
Total: $3.942 billion
Those numbers do not include the deck park, which could add another couple hundred million dollars.
The right-of-way on the east side of downtown, $423.6 million, is quite high.
Construction of Interstate 10 on the north side of downtown, including the big interchange complex with IH-45, is also quite high at $1.63 billion.
Work on the south side of downtown is slated to start in 2020, and work on the north side of downtown is slated to start in 2026. So that would put completion around 2030.
There's no word on the rest of the project, from downtown north to Beltway 8. North of downtown is actually most of the project length, and I'm concerned it could get pushed into the distant future (after 2030) since the downtown work will consume most available funding. I'm thinking some new transportation funding will be needed to get that part of the project moving forward anytime soon. I'm not optimistic about any non-tolled funding from a Trump infrastructure program, but that would seem to be the best hope for new funding in the short term.