MCTRA is only from the Harris County line at Spring Creek up to FM 1774 in Pinehurst. North of FM 1774, TxDOT will take over operations of the SH 249 Toll Road.
https://cms.revize.com/revize/montgomerycountytx/MCTRA%20249%20Tollway%20Comprehensive%20T&R%20Final%20Report%2002-16-18.pdf
OK, so:
1. Woodtrace to 1774 WILL be MCTRA?
2. Thats pretty small (3.6 miles or so) for the toll road authority, considering there are no toll roads in MC.
Makes me wonder how come they would do create an authority for just 3.6 miles, why not either have TXDOT do all of MC OR have the MC portion cover the whole county?
1) MCTRA segment is from Spring Creek to Woodtrace, TXDOT is from 1774 to 105
A. So what about from Woodtrace to 1774?
-When is that getting filled/by whom/and what is the split?
B. It looks like all the frontage roads of 249 follow 1774, thus the only way to continue on 249 at 1774 in Magnolia is on the toll road?
3) 1774 in Magnolia to 1488 (segment 1A), will be 4 toll lanes with ? frontage roads?
4) Segment 1B will be 2 toll lanes (1 in each direction) with no frontage roads, how does that work?
5) Segment 2 is 2 toll free lanes, at grade?