Re: I-57 Approved
« Reply #775 on: December 06, 2021, 08:36:02 AM »

Drove up that way for Turkey Day and I hope I'm eyeballing the inside and outside shoulders incorrectly, because both seemed way short of interstate specs on the new construction up to the Heber exit.

The 2-mile Jax segment between Vandenburg and Main hasn't been touched yet. In fact, weeds are growing in the road cracks. They need to dig that shit up when they terraform Mars.

Shoulders and ramps need work for sure.  They're pretty much going to need to consider 6-laning everything through Jacksonville, if that already isn't the plan, so they'll need to push the main carriageways all the way to the edge of the access roads and separate with barrier.  The tricky part of the Jacksonville work is going to be the James St. overpass as they will need to redo the dirtwork under it to make room for shoulder widening/6 laning.

James St. Overpass
Logged

capt.ron

  • *
  • Offline Offline

  • Posts: 320
  • Age: 50
  • Location: Central Arkansas
  • Last Login: Today at 02:18:23 PM
Re: I-57 Approved
« Reply #776 on: December 07, 2021, 12:52:28 AM »

Drove up that way for Turkey Day and I hope I'm eyeballing the inside and outside shoulders incorrectly, because both seemed way short of interstate specs on the new construction up to the Heber exit.

The 2-mile Jax segment between Vandenburg and Main hasn't been touched yet. In fact, weeds are growing in the road cracks. They need to dig that shit up when they terraform Mars.

Shoulders and ramps need work for sure.  They're pretty much going to need to consider 6-laning everything through Jacksonville, if that already isn't the plan, so they'll need to push the main carriageways all the way to the edge of the access roads and separate with barrier.  The tricky part of the Jacksonville work is going to be the James St. overpass as they will need to redo the dirtwork under it to make room for shoulder widening/6 laning.

James St. Overpass
6 laning is definitely in the works on 67 (Future I-57) in Jacksonville and it will be one nasty mess once it gets started. And as already stated, James St will have to have its overpass removed and reconfigured to make way for the wider freeway.
The shoulders, both inner and outer are substandard through Jacksonville. Once you pass Vandenburg (exit 11) heading north, you will be greeted by an extra traffic lane and wider shoulders, both inner and outer and they are wide enough to be "interstate" quality. In fact, the i-30 Arkansas River bridge is NOT interstate standard given the narrow outer shoulders.
Also, according to ARDOT's STIP, the section of US 67 from exit 16 to 19 is also slated to be replaced in the not too distant future (expanding from 4 to 6 lanes).
Logged

US20IL64

  • *
  • Offline Offline

  • Posts: 231
  • Location: Elmhurst IL
  • Last Login: May 04, 2022, 09:28:34 PM
Re: I-57 Approved
« Reply #777 on: December 07, 2021, 10:59:17 AM »

Glad to see I-57 going further, and not just a nearly 'intra-state' route. Will be able to go to DFW/TX from Chicagoland easier,  :cool:
Logged

I-39

  • *
  • Offline Offline

  • Posts: 1744
  • Last Login: May 16, 2022, 09:55:42 PM
Re: I-57 Approved
« Reply #778 on: December 07, 2021, 12:31:23 PM »

Drove up that way for Turkey Day and I hope I'm eyeballing the inside and outside shoulders incorrectly, because both seemed way short of interstate specs on the new construction up to the Heber exit.

The 2-mile Jax segment between Vandenburg and Main hasn't been touched yet. In fact, weeds are growing in the road cracks. They need to dig that shit up when they terraform Mars.

Shoulders and ramps need work for sure.  They're pretty much going to need to consider 6-laning everything through Jacksonville, if that already isn't the plan, so they'll need to push the main carriageways all the way to the edge of the access roads and separate with barrier.  The tricky part of the Jacksonville work is going to be the James St. overpass as they will need to redo the dirtwork under it to make room for shoulder widening/6 laning.

James St. Overpass
6 laning is definitely in the works on 67 (Future I-57) in Jacksonville and it will be one nasty mess once it gets started. And as already stated, James St will have to have its overpass removed and reconfigured to make way for the wider freeway.
The shoulders, both inner and outer are substandard through Jacksonville. Once you pass Vandenburg (exit 11) heading north, you will be greeted by an extra traffic lane and wider shoulders, both inner and outer and they are wide enough to be "interstate" quality. In fact, the i-30 Arkansas River bridge is NOT interstate standard given the narrow outer shoulders.
Also, according to ARDOT's STIP, the section of US 67 from exit 16 to 19 is also slated to be replaced in the not too distant future (expanding from 4 to 6 lanes).

What is taking so long to complete the Main Street to Vandenberg Blvd segment in Jacksonville? It sticks out like a sore thumb. They keep pushing it back for whatever reason.
Logged

capt.ron

  • *
  • Offline Offline

  • Posts: 320
  • Age: 50
  • Location: Central Arkansas
  • Last Login: Today at 02:18:23 PM
Re: I-57 Approved
« Reply #779 on: December 07, 2021, 01:05:53 PM »

Drove up that way for Turkey Day and I hope I'm eyeballing the inside and outside shoulders incorrectly, because both seemed way short of interstate specs on the new construction up to the Heber exit.

The 2-mile Jax segment between Vandenburg and Main hasn't been touched yet. In fact, weeds are growing in the road cracks. They need to dig that shit up when they terraform Mars.

Shoulders and ramps need work for sure.  They're pretty much going to need to consider 6-laning everything through Jacksonville, if that already isn't the plan, so they'll need to push the main carriageways all the way to the edge of the access roads and separate with barrier.  The tricky part of the Jacksonville work is going to be the James St. overpass as they will need to redo the dirtwork under it to make room for shoulder widening/6 laning.

James St. Overpass
6 laning is definitely in the works on 67 (Future I-57) in Jacksonville and it will be one nasty mess once it gets started. And as already stated, James St will have to have its overpass removed and reconfigured to make way for the wider freeway.
The shoulders, both inner and outer are substandard through Jacksonville. Once you pass Vandenburg (exit 11) heading north, you will be greeted by an extra traffic lane and wider shoulders, both inner and outer and they are wide enough to be "interstate" quality. In fact, the i-30 Arkansas River bridge is NOT interstate standard given the narrow outer shoulders.
Also, according to ARDOT's STIP, the section of US 67 from exit 16 to 19 is also slated to be replaced in the not too distant future (expanding from 4 to 6 lanes).

What is taking so long to complete the Main Street to Vandenberg Blvd segment in Jacksonville? It sticks out like a sore thumb. They keep pushing it back for whatever reason.


They had all of that "eminent domain" land near the freeway to deal with and then the utilities that had to be relocated and whatnot. I think they're getting their ducks in the row before they begin the last leg of that project.
Other than that, the portion of US 67 in White County is nearing completion. They are doing shoulder work right now. They were milling the surface down and replacing cracked sections of the freeway over the past year. The section in Lonoke county (up to exit 19) is next once they finish up the project in White County.
Logged

Great Lakes Roads

  • *
  • Offline Offline

  • Posts: 700
  • Ain't nobody got time for that!!

  • Age: 22
  • Location: La Porte, Indiana
  • Last Login: Today at 04:12:31 PM
Re: I-57 Approved
« Reply #780 on: December 17, 2021, 04:38:20 PM »

https://www.ardot.gov/wp-content/uploads/2021/12/2022-January-Letting-to-Post.pdf

The project to widen US 67 (Future I-57) through the cities of Jacksonville and Cabot (aka "The Gap") to three lanes in each direction is scheduled to let construction on/after May 18, 2022.
Logged

capt.ron

  • *
  • Offline Offline

  • Posts: 320
  • Age: 50
  • Location: Central Arkansas
  • Last Login: Today at 02:18:23 PM
Re: I-57 Approved
« Reply #781 on: December 18, 2021, 02:18:53 PM »

https://www.ardot.gov/wp-content/uploads/2021/12/2022-January-Letting-to-Post.pdf

The project to widen US 67 (Future I-57) through the cities of Jacksonville and Cabot (aka "The Gap") to three lanes in each direction is scheduled to let construction on/after May 18, 2022.
Finally they are moving forward with this. Within the widening project, the project also includes rebuilding both exits 16 and 19. The new overpasses are slated to be SPUI's.
Logged

Road Hog

  • *
  • Offline Offline

  • Posts: 1709
  • Location: Collin County, TX
  • Last Login: Today at 12:55:02 AM
Re: I-57 Approved
« Reply #782 on: December 21, 2021, 01:09:29 PM »

https://www.ardot.gov/wp-content/uploads/2021/12/2022-January-Letting-to-Post.pdf

The project to widen US 67 (Future I-57) through the cities of Jacksonville and Cabot (aka "The Gap") to three lanes in each direction is scheduled to let construction on/after May 18, 2022.
Finally they are moving forward with this. Within the widening project, the project also includes rebuilding both exits 16 and 19. The new overpasses are slated to be SPUI's.
Good. Exit 16 is a disaster even with the modifications made over the years. Evening traffic continually backs up onto the main lanes because 367 is too close and the traffic light there is a choke point. A SPUI would solve that issue.
Logged

MikieTimT

  • *
  • Offline Offline

  • Posts: 1085
  • Age: 49
  • Location: Wedington Woods, Arkansas
  • Last Login: May 20, 2022, 06:39:13 PM
Re: I-57 Approved
« Reply #783 on: December 27, 2021, 10:45:38 AM »

https://www.ardot.gov/wp-content/uploads/2021/12/2022-January-Letting-to-Post.pdf

The project to widen US 67 (Future I-57) through the cities of Jacksonville and Cabot (aka "The Gap") to three lanes in each direction is scheduled to let construction on/after May 18, 2022.

So, hopefully by 2025, most of I-57 in AR can be signed, at least up through Walnut Ridge.  By then, there should be movement on the new-terrain portions as well, or at least a route picked and ROW bought so that utility work can begin.
Logged

edwaleni

  • *
  • Offline Offline

  • Posts: 1538
  • Last Login: Today at 03:41:48 PM
Re: I-57 Approved
« Reply #784 on: December 27, 2021, 11:17:44 AM »

While comments closed on August 2nd, 2021 the response to the NOI for US-67/I-57 is due to be uploaded in the 1Q of 2022.

https://www.regulations.gov/search?filter=FHWA-2021-0009
Logged

mvak36

  • *
  • Offline Offline

  • Posts: 1158
  • Last Login: Today at 06:08:41 AM
Re: I-57 Approved
« Reply #785 on: January 14, 2022, 08:57:55 AM »

https://www.modot.org/node/24975

Quote

MoDOT Plans Virtual Public Hearing to Discuss Route 67 (Future I-57) in Butler County
MoDOT Accepts Public Input on Planned Improvements

SIKESTONóThe Missouri Department of Transportation will hold a virtual public hearing to discuss a proposed project to upgrade U.S. Route 67 in Butler County to four lanes in preparation for Future I-57. 

The virtual public hearing will be held Thursday, Feb. 3 from 4 to 6 p.m., with formal presentations beginning at 4 and 5 p.m. The same presentation will be delivered at both 4 and 5 p.m. to provide attendees with multiple opportunities to join the discussion. Throughout the online hearing, there will opportunities for attendees to ask questions or share comments. Attendees can join the virtual public hearing on Feb. 3 by visiting www.modot.org/futureI57.

The proposed project includes upgrading Route 67 to interstate standards from the Route 160/158 interchange south of Poplar Bluff, Missouri to the Missouri/Arkansas state line. The entire project limits are broken down into five phases: Phases 1A and 1B, as well as Phases 2-4.

Phases 1A, 1B and 2 are funded. Phase 1A received funding through Governor Mike Parsonís cost share program. Phases 1B and 2 were funded thanks to a cost share between MoDOT and the City of Poplar Bluff. This was made possible after Poplar Bluff voters approved a ballot measure led by the Highway 67 Corporation to help fund the expansion in August 2019.

The virtual public hearing will focus on Phase 2, which includes upgrading a two-mile section of Route 67 to four lanes from County Road 338 to County Road 352.

Funding is not yet secured for Phases 3 and 4; schedules will be determined as funding becomes available.

Interested persons may review the project in more detail and share their thoughts at www.modot.org/futureI57. Individuals interested in attending the virtual public hearing may visit www.modot.org/futureI57 to join on Feb. 3.

Comments will be accepted through Thursday, Feb. 17.
Logged
Counties: Counties visited
Travel Mapping: Summary

I-39

  • *
  • Offline Offline

  • Posts: 1744
  • Last Login: May 16, 2022, 09:55:42 PM
Re: I-57 Approved
« Reply #786 on: January 14, 2022, 11:37:50 AM »

https://www.modot.org/node/24975

Quote

MoDOT Plans Virtual Public Hearing to Discuss Route 67 (Future I-57) in Butler County
MoDOT Accepts Public Input on Planned Improvements

SIKESTONóThe Missouri Department of Transportation will hold a virtual public hearing to discuss a proposed project to upgrade U.S. Route 67 in Butler County to four lanes in preparation for Future I-57. 

The virtual public hearing will be held Thursday, Feb. 3 from 4 to 6 p.m., with formal presentations beginning at 4 and 5 p.m. The same presentation will be delivered at both 4 and 5 p.m. to provide attendees with multiple opportunities to join the discussion. Throughout the online hearing, there will opportunities for attendees to ask questions or share comments. Attendees can join the virtual public hearing on Feb. 3 by visiting www.modot.org/futureI57.

The proposed project includes upgrading Route 67 to interstate standards from the Route 160/158 interchange south of Poplar Bluff, Missouri to the Missouri/Arkansas state line. The entire project limits are broken down into five phases: Phases 1A and 1B, as well as Phases 2-4.

Phases 1A, 1B and 2 are funded. Phase 1A received funding through Governor Mike Parsonís cost share program. Phases 1B and 2 were funded thanks to a cost share between MoDOT and the City of Poplar Bluff. This was made possible after Poplar Bluff voters approved a ballot measure led by the Highway 67 Corporation to help fund the expansion in August 2019.

The virtual public hearing will focus on Phase 2, which includes upgrading a two-mile section of Route 67 to four lanes from County Road 338 to County Road 352.

Funding is not yet secured for Phases 3 and 4; schedules will be determined as funding becomes available.

Interested persons may review the project in more detail and share their thoughts at www.modot.org/futureI57. Individuals interested in attending the virtual public hearing may visit www.modot.org/futureI57 to join on Feb. 3.

Comments will be accepted through Thursday, Feb. 17.

Surprised Phase 3 isnít funded yet. But obviously, Phase 4 canít be done until Arkansas figures out a route to the state line.
Logged

capt.ron

  • *
  • Offline Offline

  • Posts: 320
  • Age: 50
  • Location: Central Arkansas
  • Last Login: Today at 02:18:23 PM
Re: I-57 Approved
« Reply #787 on: January 14, 2022, 01:18:20 PM »

Having driven the section of US 67 north (northeast) of Walnut Ridge, it looks like they could get by using a little bit of the existing roadway once you get past the Current River which sits just east of Pocahontas. The terrain is relatively flat and stays that way until you reach US 160 in MIssouri. Obviously some of the ROW is too close to the existing roadway for it to be used. Case in point, the state line stores right at the MO/AR border. But once you go north of there, it nothing but farmland on both sides of the highway. Then you approach Neelyville where if you blink your eyes 2 times, you're through it. Also the existing 2 lane in the rural areas outside of Neelyville are signed at 60 mph. And of course, the limit drops to 55 once you reach AR.
The "5 lane" section between Walnut Ridge and Pocahontas can't be used since most of the land on both sides is just as high or even higher than the existing roadway. I bet it will either be signed as either 67B or 367.
Logged

Road Hog

  • *
  • Offline Offline

  • Posts: 1709
  • Location: Collin County, TX
  • Last Login: Today at 12:55:02 AM
Re: I-57 Approved
« Reply #788 on: January 14, 2022, 08:40:45 PM »

When I-57 is completed, it might behoove ARDOT to restore the old US 67 to current AR 367 since it preserved the old parallel US highways at the beginning (61, 64, 65, 67 and 70).
Logged

MikieTimT

  • *
  • Offline Offline

  • Posts: 1085
  • Age: 49
  • Location: Wedington Woods, Arkansas
  • Last Login: May 20, 2022, 06:39:13 PM
Re: I-57 Approved
« Reply #789 on: January 25, 2022, 09:38:05 AM »

When I-57 is completed, it might behoove ARDOT to restore the old US 67 to current AR 367 since it preserved the old parallel US highways at the beginning (61, 64, 65, 67 and 70).

They've pretty much done just that north and east of Jacksonville up to Walnut Ridge.  South of and within Jacksonville, it was changed to AR-161 back in the 90's down to Prothro Junction on US-70, but it would only take a designation change to AR-367 as that's already the old alignment anyway.  They should continue the designation along the old alignment of US-67 north of Walnut Ridge once they have constructed the new alignment, though.
Logged

I-39

  • *
  • Offline Offline

  • Posts: 1744
  • Last Login: May 16, 2022, 09:55:42 PM
Re: I-57 Approved
« Reply #790 on: May 16, 2022, 09:46:40 PM »

Any more news on this as of late?
Logged

ilpt4u

  • *
  • Offline Offline

  • Posts: 2775
  • Location: Southern IL
  • Last Login: Today at 03:52:29 PM
Re: I-57 Approved
« Reply #791 on: May 16, 2022, 10:53:39 PM »

Any more news on this as of late?
MoDOT has let a contract for improvements in Poplar Bluff, as reported in the MoDOT Contract Letting thread on the Central States board:
May 20, 2022 Letting:

Job J9P3663 Route 67 BUTLER County. Grading and pavement from 0.5 mile north of Route 160 to County Road 360, the total length of improvement being 0.98 miles. Looks like this is part of the Future I-57 project
https://www.aaroads.com/forum/index.php?topic=19531.175
Logged

US71

  • Road Scholar , Master of Snark
  • *
  • Offline Offline

  • Posts: 11605
  • Mad man with a camera

  • Age: 62
  • Location: On the road again
  • Last Login: Today at 03:36:23 PM
    • The Road Less Taken
Re: I-57 Approved
« Reply #792 on: May 16, 2022, 11:55:53 PM »

Any more news on this as of late?

I'm like Hans Schultz: I hear nothing  :)
Logged
Like Alice I Try To Believe Three Impossible Things Before Breakfast

edwaleni

  • *
  • Offline Offline

  • Posts: 1538
  • Last Login: Today at 03:41:48 PM
Re: I-57 Approved
« Reply #793 on: May 17, 2022, 07:29:28 AM »

According to this, the first letting was planned for March 2022 for Phase 1A with construction to start in April of 2022.

https://www.modot.org/sites/default/files/documents/US%2067%20Future%20I57%20Handout_August%202021.pdf

The funding for up to Phase 2 is secured (Poplar Bluff to Harviell Ditch)

Phase 3 and Phase 4 don't have dates yet probably because they are still aligning funding.

Phase 4 requires a MOU with ARDOT on where the roads will meet.

As for ARDOT, they are still processing the alignment feedback north of Walnut Ridge.


Logged

mvak36

  • *
  • Offline Offline

  • Posts: 1158
  • Last Login: Today at 06:08:41 AM
Re: I-57 Approved
« Reply #794 on: May 20, 2022, 08:05:10 AM »

According to this, the first letting was planned for March 2022 for Phase 1A with construction to start in April of 2022.

https://www.modot.org/sites/default/files/documents/US%2067%20Future%20I57%20Handout_August%202021.pdf

The funding for up to Phase 2 is secured (Poplar Bluff to Harviell Ditch)

Phase 3 and Phase 4 don't have dates yet probably because they are still aligning funding.

Phase 4 requires a MOU with ARDOT on where the roads will meet.

As for ARDOT, they are still processing the alignment feedback north of Walnut Ridge.

Phase 1B and Phase 2 are scheduled to let in January 2023 according to MODOT's Draft STIP.