News:

Thanks to everyone for the feedback on what errors you encountered from the forum database changes made in Fall 2023. Let us know if you discover anymore.

Main Menu

US 41/Old 41 interchange (N. Terre Haute) to be converted to at-grade

Started by Kniwt, July 21, 2022, 02:40:27 AM

Previous topic - Next topic

Kniwt

The Tribune-Star in Terre Haute reports:
https://www.tribstar.com/news/local_news/indot-presents-plans-for-north-clinton-street-redo/article_f40e61db-0906-59e5-b3cd-fb26f13d8e90.html

QuoteVigo County residents Wednesday got a chance to review design plans of a $2.89 million Indiana Department of Transportation project that will reconfigure North Clinton Street, remove a bridge over U.S. 41 and construct a new at-grade intersection.

... The bridge over U.S. 41 was built in the 1960s, Perry said, and would be costly to replace, adding removing the structure will save on long-term maintenance costs. "The bridge is also lower than what is desired"  for most truck traffic, he said.

... Construction on the project is slated to start in the spring of 2023, with the bridge closure in the fall or winter of 2023, said INDOT spokeswoman Megan DeLucenay. "The project is anticipated to be completed in the winter of 2023 or more likely in early 2024,"  she said.



Great Lakes Roads




Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.