Question about the construction at I-44 and US-169 (Tulsa)

(1/3) > >>

BigOkie:
Was wondering if anyone had a link to some detail on the specifics of what is going on with this construction.  I ask because I drive by this frequently, and I see what appears to be a flyover or some sort of ramp pier up just to the northeast of the bridge.  All I see in some of the ODOT material is 'pavement rehab' along with 'interchange improvement'.  Does anyone know where I can find detailed plans for the improvements?  The link to ODOT's quick blurb is here

Thanks.

swake:

--- Quote from: BigOkie on December 30, 2022, 12:42:06 PM ---Was wondering if anyone had a link to some detail on the specifics of what is going on with this construction.  I ask because I drive by this frequently, and I see what appears to be a flyover or some sort of ramp pier up just to the northeast of the bridge.  All I see in some of the ODOT material is 'pavement rehab' along with 'interchange improvement'.  Does anyone know where I can find detailed plans for the improvements?  The link to ODOT's quick blurb is here

Thanks.

--- End quote ---

They say it badly, but it includes a new flyover from eastbound I-44 to northbound US-169. I've never seen any detailed plans released anywhere.

rte66man:

--- Quote from: swake on December 30, 2022, 06:05:40 PM ---
--- Quote from: BigOkie on December 30, 2022, 12:42:06 PM ---Was wondering if anyone had a link to some detail on the specifics of what is going on with this construction.  I ask because I drive by this frequently, and I see what appears to be a flyover or some sort of ramp pier up just to the northeast of the bridge.  All I see in some of the ODOT material is 'pavement rehab' along with 'interchange improvement'.  Does anyone know where I can find detailed plans for the improvements?  The link to ODOT's quick blurb is here

Thanks.

--- End quote ---

They say it badly, but it includes a new flyover from eastbound I-44 to northbound US-169. I've never seen any detailed plans released anywhere.

--- End quote ---

https://www.odot.org/contracts/a2022/plans2206/835-1_2206_SSP-4400(096)PM_1098105/0000_1098105_FULLFILE.pdf

BigOkie:

--- Quote from: rte66man on December 30, 2022, 06:43:36 PM ---
--- Quote from: swake on December 30, 2022, 06:05:40 PM ---
--- Quote from: BigOkie on December 30, 2022, 12:42:06 PM ---Was wondering if anyone had a link to some detail on the specifics of what is going on with this construction.  I ask because I drive by this frequently, and I see what appears to be a flyover or some sort of ramp pier up just to the northeast of the bridge.  All I see in some of the ODOT material is 'pavement rehab' along with 'interchange improvement'.  Does anyone know where I can find detailed plans for the improvements?  The link to ODOT's quick blurb is here

Thanks.

--- End quote ---

They say it badly, but it includes a new flyover from eastbound I-44 to northbound US-169. I've never seen any detailed plans released anywhere.

--- End quote ---

https://www.odot.org/contracts/a2022/plans2206/835-1_2206_SSP-4400(096)PM_1098105/0000_1098105_FULLFILE.pdf



--- End quote ---

Well that's a lot, but getting to the maps all I can see changing is a pier-elevated ramp from EB I-44 to NB US169, not even changing the cloverleaf config, just giving a little more runout for a merge.  Am I seeing that right?

Edit:  Looks to me like 'Ramp D' is the new config.  It does alter the clover a little but all it appears to do is take the merge away from EB 44 to NB 169 from the bridge grade and run it all the way by where the exit ramp from WB 44 to NB 169 is.  I'm not sure what that does actually.  Might make it a little safer but god do I hate cloverleafs in larger metros.

CtrlAltDel:
It looks something like a brief C-D road: