Isn't that one on the two lane section of I-40 they plan on widening to 3?
No, it's immediately west of the 15th st bridge. On the 2-lane section, bridges over Anderson Rd will need replacement, as well as several overpasses.
Yeah my mistake.
It looks like this stretch of I-40 is going be under construction for the better part of this entire decade. This project will likely take a year or two.
Then Sunnylane and a slew of other projects begin in 2025/26/27 to widen the freeway and redo the bridges. The interchange at I-35 is even due for some capacity upgrades on the 8yr plan. I-35 will be reconstructed from I-40 to I-44 along with its interchange at I-44 being completely reconstructed and reconfigured. Then I-40 will be widened East until the entire corridor is six lanes to Shawnee. So the I-40 expansion currently wrapping up essentially is a kick off to a long series of sporadic construction projects in this area so if you live here good luck.
Many projects are still planned on I-40 west which, I’m sure you know, OkDOT just reconstructed and widened. Still more projects on the way there too with Frisco road interchange to be redone this year.
OkDOT seriously needs a bigger budget as it is incredibly frustrating that it drags all of these projects out over a decade or more. It just means never ending construction on each road.
8 laning I-40 is even on ACOGs long term plan so that could happen in the 2030s or 40s.
PS, the section of I-40 closest to Tinker in between David Stanley is going require either acquisition of land(which is likely off the table) or a very complex widening which I think no such setup exists in Oklahoma. It will likely be partially buried similar to how the service roads are along US-75 in Dallas(central expressway). It will be expensive and isn’t even mentioned on the 8yr plan at all but it will be widened as there is no choice or else it becomes a bad bottleneck in the future. Another option is to bury it using a cut and cover and cap it with a park. I personally am excited for these possibilities as it will be a unique stretch of freeway but I don’t expect anything this decade.
Here is the 8year plan to see exact dates and costs:
https://www.odot.org/cwp-8-year-plan/cwp_ffy2020-ffy2027/8_year_cwp_divisionokc_map.pdf