Construction season is in full swing in Wyoming:
https://cowboystatedaily.com/2021/06/16/construction-season-in-wyoming-causes-continuing-delays-on-highways/Locations of this summer's construction projects include the following roads and locations; a map for the 2021 season is available here:
https://map.wyoroad.info/wtimap/index.html. Most projects involve pavement and bridge repairs and construction.
- Interstate 25: south of Cheyenne, between Cheyenne and Chugwater, Casper bridge construction, and around Kaycee
- Interstate 80: east of Cheyenne, in Telephone Canyon between Cheyenne and Laramie, west of Laramie, near Elk Mountain, between Sinclair and Walcott, east of Rock Springs near the airport, and west of Rock Springs
- Interstate 90: east of Moorcroft for bridge repairs
- U.S. Highway 14/16/20 in Cody
- U.S. Highway 14A/310/Wyoming Highway 789 near Lovell
- U.S. Highway 16 between Worland and Ten Sleep
- U.S. Highway 16 east of Ten Sleep
- U.S. Highway 16/20/Wyoming Highway 789 near Worland
- U.S. Highway 20/26 west of Casper
- U.S. Highway 20/26/87 in Casper
- U.S. Highway 20/Wyoming Highway 789 at Shoshoni
- U.S. Highway 26/89/189/191 south of Jackson
- U.S. Highway 26/287 between Moran Junction and Dubois
- U.S. Highway 85 between Lingle and Lusk
- U.S. Highway 89 between Thayne and Alpine Junction
- U.S. Highway 189/191 at Pinedale Bridge
- U.S. Highway 287 north of Lander
- U.S. Highway 287/Wyoming Highway 789 southeast of Lander
- U.S. Highway 310/Wyoming Highway 789 north of Powell
- Wyoming Highway 28 south of Lander
- Wyoming Highway 30 between Basin and Burlington
- Wyoming Highway 120 northwest of Cody
- Wyoming Highway 211 northwest of Cheyenne
- Wyoming Highway 220 southwest of Casper
- Wyoming Highway 296 northwest of Cody