AARoads Forum

Regional Boards => Great Lakes and Ohio Valley => Topic started by: Voyager on January 20, 2009, 06:28:18 PM

Title: WI: Marquette Interchange in Milwaukee, other area freeway improvements
Post by: Voyager on January 20, 2009, 06:28:18 PM
Has the upgrade to downtown Milwaukee been completed? I think the new Interchange in downtown is very beautiful.
Title: Re: Wisconsin
Post by: jd2death on January 21, 2009, 07:59:29 PM
What upgrade are you talking about if i may ask?
Title: Re: Wisconsin
Post by: catofdar on January 22, 2009, 12:43:15 AM
If you are referring to whether the Marquette Interchange has been completed, the answer is yes...back in August 2008.  Other than that, not sure what upgrade you are referring to either...
Title: Re: Wisconsin
Post by: jd2death on January 22, 2009, 01:11:36 AM
They really need to upgrade the I-794 Hoan Bridge. Its really in bad shape
Title: Re: Wisconsin
Post by: Scott5114 on January 22, 2009, 06:12:18 AM
Got to tour the Marquette Interchange at the Milwaukee sidetrip at the Chicago meet. I was impressed.
Title: Re: Wisconsin
Post by: Voyager on January 22, 2009, 06:24:11 AM
Is the Marquette interchange finished?
Title: Re: Wisconsin
Post by: jd2death on January 22, 2009, 06:31:11 AM
Quote from: voyager on January 22, 2009, 06:24:11 AM
Is the Marquette interchange finished?


Yes


August 08 is when they wrapped up
Title: Re: Wisconsin
Post by: catofdar on January 27, 2009, 12:18:50 AM
Scott...you have yet to see it completed!  You only saw it under construction...hopefully this August  ;-)
Title: Re: Wisconsin
Post by: SSOWorld on January 28, 2009, 04:52:48 PM
Next projects are the I-94 Corridor between Milwaukee and Illinois state line (Widen to 8 lanes - reconstruct - including the Mitchell Interchange (I-94/I-894 East end) and the Zoo Interchange (I-94/I-894 West End).
Title: Re: Wisconsin
Post by: jd2death on January 29, 2009, 01:17:58 AM
Quote from: Master son on January 28, 2009, 04:52:48 PM
Next projects are the I-94 Corridor between Milwaukee and Illinois state line (Widen to 8 lanes - reconstruct - including the Mitchell Interchange (I-94/I-894 East end) and the Zoo Interchange (I-94/I-894 West End).



That is gonna be a pain cause both have heavy traffic
Title: Re: Wisconsin
Post by: Scott5114 on January 29, 2009, 04:17:37 AM
Better get pictures of that all-text median sign down by County Q while you can!
Title: Re: Wisconsin
Post by: Alex on January 29, 2009, 04:52:58 PM
Any news on Interstate 41 coming to reality? How about the idea to remove Interstate 894 in favor of Interstate 41?
Title: Re: Wisconsin
Post by: jd2death on January 30, 2009, 03:47:02 AM
Wisconsin Department of Transportation officials are studying what improvements need to be made to U.S. Route 41 in order for it to upgraded to Interstate status.[2] Necessary upgrades must be made before any signage changes can happen, but the entire length from Milwaukee to Green Bay is expected to become a new Interstate 41.[2] The legislation was added to the 2005 federal highway bill (Transportation Equity Act: A Legacy for Users) by Congressman Tom Petri. Gannett Wisconsin Newspapers reviewed the state traffic records, and found that the number of cars traveling on 41 in northeast Wisconsin has nearly doubled since 1994.[2] It is unknown if the U.S. Route 41 shields will remain when I-41 signs are tentatively scheduled to go up in 2009.[citation needed] When complete, this will be only the second Interstate number to overlap its U.S. Route counterpart. The other is Interstate 74 & U.S. Route 74 in North Carolina.

Two expansion projects are scheduled for 2010. The first upgrades the old rural freeway west of Green Bay from CTH F(Scheuring Rd) past I-43 to CTH M(Lineville Rd) to a six-lane road with the rebuilding of all interchanges along the corridor; including a free-flow interchange with WIS 29.[3] The second is an expansion of the highway from WIS 26 to Breezewood Lane around Oshkosh from 4 to 6 lanes - including rebuilds of 9 interchanges and the Lake Butte des Morts causeway. [4] [5] The bridge over Lake Butte des Morts is scheduled to be expanded to eight lanes. [5] The second plan has a $292 million budget, and is scheduled to include two additional park and ride lots at State Highways 26 and 76. [5]

Studies are also underway on upgrading the US 41/US 10/WIS 441 interchange in the Neenah area. Currently, the interchange is missing the US 10 Eastbound to US 41 Northbound, and US 41 Northbound to US 10 Westbound ramp movements. This study is focusing on ways to reconstruct this interchange to allow all ramp movements.
Title: Re: Wisconsin
Post by: SSOWorld on January 30, 2009, 10:57:23 AM
old news - keeping in mind that first part's citation no longer is available.  The DOT tends to keep things under wraps too. :banghead:
Title: Re: Wisconsin
Post by: Tom on July 02, 2009, 08:06:06 PM
An article on Wisconsin's highways:
http://en.wikipedia.org/wiki/List_of_Wisconsin_numbered_highways (http://en.wikipedia.org/wiki/List_of_Wisconsin_numbered_highways) :coffee: