News:

Thank you for your patience during the Forum downtime while we upgraded the software. Welcome back and see this thread for some new features and other changes to the forum.

Main Menu

MODOT Contract Lettings

Started by mvak36, January 14, 2017, 04:40:27 PM

Previous topic - Next topic

mvak36

#150
June 18, 2021 Letting: Bid Results. Bid Award Winners.

Projects listed in blue font are part of Missouri Focus on Bridges program. None listed as of now

(1): Job J1I3434 Route I-35 DAVIESS County. Scour repair at the Grand River 1.9 miles north of Rte. DD near Pattonsburg, the total length of improvement being 0.015 miles.
(2): Job J1P3435 Route 136 MERCER County. Scour repair at 0.9 mile east of Rte. DD near Ravanna, the total length of improvement being 0.038 miles.

(1): Job J1MAMD01 Route Various VARIOUS County. Resurface on various routes in Grundy, Mercer, Linn, Putnam, and Sullivan Counties, the total length of improvement being 75.59 miles.
(2): Job J2MAMD08 Route 149 ADAIR, PUTNAM County. Resurface from Rte. AA to Rte. 6 in Novinger, the total length of improvement being 10.653 miles.

Job J1P3303 Route 6 GRUNDY, SULLIVAN County. Scrub seal from Rte. 65 to Rte. 5 south of Milan and from east of Rte. 5, north of Milan, to Rte. 129 in Green City, the total length of improvement being 34.355 miles.

(1): Job J2MAMD01 Route A LEWIS County. Resurface from Rte. E in Williamstown to Rte. 16 in Monticello, the total length of improvement being 9.803 miles.
(2): Job J2MAMD13 Route B SCOTLAND County. Resurface from Iowa State line to Rte. 136, the total length of improvement being 13.962 miles.
(3): Job J2MAMD14 Route H CLARK County. Resurface from Rte. 81 0.5 mile south of Rte. Y to Rte. 61, the total length of improvement being 12.02 miles.

Job J2MAMD16 Route Y MACON, RANDOLPH County. Resurface from Rte. 63 near Excello to Rte. J in Randolph County, the total length of improvement being 10.874 miles.
Job J3S3209 Route 13 LAFAYETTE County. Slide repair from Rte. 224 to Delaware Street in Lexington, the total length of improvement being 0.091 miles.

(1): Job J5MAMD01 Route BB,NN MONITEAU County. Resurface Rte. NN from Moon Valley Road to Rte. 5 and Rte. BB from Rte. 50 to Arthur Road, the total length of improvement being 5.757 miles.
(2): Job J5MAMD02 Route JJ MORGAN County. Resurface from Rte. 135 to Rte. D, the total length of improvement being 7.645 miles.

Job J5MAMD04 Route Various CALLAWAY County. Resurface Rte. PP from Rte. BB to Rte. 94, Rte. K from Rte. D to Montgomery County line, and Rte. HH from I-70 to Rte. 54, the total length of improvement being 23.792 miles.
Job J6P3482 Route 364 ST CHARLES County. Median barrier installation over I-64 between on and off ramps, the total length of improvement being 0.378 miles.
Job J6S3476 Route I-44 ST LOUIS County. Pavement, guardrail, signal, and ADA improvements on the north and south outer roads between Antire Road to Yarnell Road, the total length of improvement being 5.184 miles.

(1): Job J7Q3414B Route I-44 GREENE, JASPER, LAWRENCE, NEWTON, WEBSTER County. ITS improvements at various locations on I-44 in the rural Southwest District, the total length of improvement being 0 miles.
(2): Job J8Q3181B Route Various GREENE County. ITS improvements at various locations in Urban Southwest District, the total length of improvement being 0 miles.

Job J9P3585 Route 51 PERRY County. Bridge rehabilitation over Mississippi River and Union Pacific Rail Road, the total length of improvement being 0.597 miles.

EDIT: Additional lettings added
Job J1M0264 Route 169 BUCHANAN County. Repair damaged culvert at 0.1 mile south of Karnes Road in St. Joseph, the total length of improvement being 0.086 miles.

(1): Job J3MAMD01 Route Various JOHNSON County. Resurface on various routes in the Rural Kansas City District, the total length of improvement being 13.413 miles.
(2): Job J4MAMD01 Route Various CASS County. Resurface various routes in the Urban Kansas City District, the total length of improvement being 12.218 miles.

Job J6MAMD02 Route Various FRANKLIN County. Resurface from I-44 to end of maintenance, Rte. JJ from end of maintenance to I-44, and Rte. W from I-44 to end of maintenance, the total length of improvement being 13.56 miles.
Job J0M0063 Route Various VARIOUS County. On-call slab stabilization statewide, the total length of improvement being 0 miles.
Counties: Counties visited
Travel Mapping: Summary


mvak36

The winning bids for the May letting were awarded at the MHTC meeting on 6/2/21.
Counties: Counties visited
Travel Mapping: Summary

mvak36

The winning bids for the June letting were awarded at the MHTC meeting on 7/1/21.
Counties: Counties visited
Travel Mapping: Summary

mvak36

#153
August 20, 2021 Letting: Bid Results. Bid Award Winners.

Projects listed in blue font are part of Missouri Focus on Bridges program.

Job J1I3231 Route I-29 ATCHISON, HOLT County. Resurface from Rte. 111 near Rock Port to Rte. W, the total length of improvement being 8.685 miles.
Job J1I3242 Route I-35 HARRISON County. Bridge rehabilitation over Pole Cat Creek south of Bethany, 2.2 miles south of I-35 and Rte. 136 interchange, the total length of improvement being 0.123 miles.

(1): Job J1I3271 Route I-29 HOLT County. Bridge deck replacement over Rte. 59, 8.1 miles north of Rte. 118, near Craig, the total length of improvement being 0.228 miles.
(2): Job J1P3254 Route 159 HOLT County. Bridge rehabilitation over Big Lake Overflow 1 mile west of Rte. 111, near Big Lake, the total length of improvement being 0.067 miles.
(3): Job J1S3058 Route U BUCHANAN County. Bridge deck replacement over Contrary Creek, 5.5 miles east of Rte. 59 near St. Joseph, the total length of improvement being 0.05 miles.
(4): Job J1S3203 Route 111 ATCHISON County. Bridge deck replacement over I-29, 2.9 miles south of Rock Port, the total length of improvement being 0.115 miles.
(5): Job J1S3251 Route 59 ANDREW County. Bridge rehabilitation over Route I-29 1.2 miles south of the Nodaway River, near Fillmore, the total length of improvement being 0.06 miles.

Job J1S3341 Route 69 CLINTON County. Intersection improvements at the intersection of Rte. 116 and US 69 near Lathrop, the total length of improvement being 0.198 miles.
Job J2P3370 Route Various VARIOUS County. Job order contract for guardrail repair at various locations in the Northeast District, the total length of improvement being 0 miles.
Job J6M0287 Route B JEFFERSON County. Sign installation on Rte. B at Column Drive, the total length of improvement being 0.372 miles.
Job J6P3596 Route 21 JEFFERSON County. Signal and lighting installation at Rte. 110 and Liberty School Rd. intersection, the total length of improvement being 0.287 miles.
Job J6S3434 Route 185,D FRANKLIN County. Resurface, Guardrail, and ADA improvements on Rte. 185 from Rte. AC to West Springfield Rd and on Rte. D from Rte. WW to West Springfield Rd, the total length of improvement being 8.635 miles.

(1): Job J7P3278 Route 32 POLK County. Resurface from Rte. 13 to Rte. D in Bolivar, the total length of improvement being 2.996 miles.
(2): Job J7S3279 Route 83 POLK County. Resurface on Springfield Ave. from Rte. 32 (Broadway St.) to Rte. 13 in Bolivar, the total length of improvement being 2.862 miles.

(1): Job J7S3296 Route Y HENRY County. Resurface from Rte. 52 in Windsor to Rte. C in Roseland, the total length of improvement being 9.506 miles.
(2): Job J7S3298 Route BENTON County. Resurface from US 65 near Lincoln to Rte. B, the total length of improvement being 14.293 miles.
(3): Job J7S3415 Route 2 HENRY County. Resurface from NE 1400 Road to Rte. WW in Windsor, the total length of improvement being 10.363 miles.

EDIT: Additional Letting Added.
Job 1I3457 Route I-29 BUCHANAN County. Repair bridge girders over Rte. 169, the total length of improvement being 0.030 miles.
Counties: Counties visited
Travel Mapping: Summary

mvak36

#154
September 17, 2021 Letting: Bid Results. Bid Award Winners.

Projects listed in blue font are part of Missouri Focus on Bridges program.

(1): Job J1I3232 Route I-35 VARIOUS County. Resurface from 200' south of the Clinton/DeKalb county line, near Cameron, to the Route 69, 10 miles south of Pattonsburg, the total length of improvement being 14.814 miles.
(2): Job J1P3366 Route 69 DAVIESS County. Resurface from Route C to north of I-35, the total length of improvement being 8.812 miles.
(3): Job J1S3431 Route N HARRISON County. Resurface from the I-35 interchange to east of Eagleville, the total length of improvement being 0.188 miles.

(1): Job J1P3270 Route 24 CHARITON County. Bridge Deck Replacement over Palmer Creek 0.4 mile west of Rte. MM near Brunswick, the total length of improvement being 0.175 miles.
(2): Job J1S3218 Route M MERCER County. Bridge Replacement over Little Muddy Creek, 2.6 miles east of Rte. 65 near Mercer, the total length of improvement being 0.031 miles.
(3): Job J1S3263 Route TT CHARITON County. Bridge Deck Replacement over Turkey Creek 1.1 miles east of Rte. 139 near Sumner, the total length of improvement being 0.078 miles.
(4): Job J2S0502 Route 129 CHARITON County. Bridge Deck Replacement over Chariton River 0.5 mile south of Rte. O near Salisbury, the total length of improvement being 0.092 miles.

(1): Job J1P3301 Route 36 CALDWELL County. Resurface on US 36 From Caldwell County Line East to Hamilton EB lanes only, the total length of improvement being 11.469 miles.
(2): Job J1P3368 Route 36 BUCHANAN, DEKALB County. Resurface from .9 miles East of Route 6 (Taylor Road) to just East of Route AC near Ag Expo exit, the total length of improvement being 10.696 miles.

Job J1S3385 Route 116 BUCHANAN County. Bridge Rehabilitation over the Platte River 0.1 miles west of Rte E, the total length of improvement being 0.266 miles.

(1): Job J5P2190 Route 50 COLE County. Bridge Rehabilitation over the Osage River, 0.3 miles west of Route 63 junction, the total length of improvement being 0.344 miles.
(2): Job J5P3442 Route 50 COLE County. Bridge Rehabilitation over the Osage River, 0.3 miles west of the Route 63 junction, the total length of improvement being 0.546 miles.
(3): Job J5P3449 Route 50 COLE County. Bridge Rehabilitation Eastbound US 50 over the Moreau River, the total length of improvement being 0.109 miles.

Job J5P3326 Route 17, 52 MILLER County. Seal coat from Rte. 54 to Rte. 17 on Rte. 52 and from Rte. 52 to Rte. 42 on Rte. 17, the total length of improvement being 22.649 miles.
Job J5P3329 Route 135, W MILLER, MORGAN County. Seal coat from Rte. 50 to Rte. 5 on Rte. 135 and from Rte. Y to Bus. Rte. 54 on Rte. W, the total length of improvement being 47.459 miles.
Job J5P3347 Various Routes, CRAWFORD, MARIES County. Seal Coat on Route F from I-44 to Rte. 19, Rte. CC from Rte. 19 to Rte. C and Rte. 68 from Rte. 63 to 0.5 mile west of I-44, the total length of improvement being 29.927 miles.
Job J5P3382 Route 72 DENT, PHELPS County. Resurface on Rte. 72 from Rte. 63 to Rte. 32, the total length of improvement being 25.371 miles.
Job J5P3401 Route 54 CALLAWAY County. Resurface from County Road 147/143, 2.5 miles north of Kingdom City to the Audrain County Line, the total length of improvement being 6.967 miles.
Job J5P3409 Route 63 BOONE, CALLAWAY County. Resurface from Rte. B in Boone Co. to Rte. 54 in Callaway Co., the total length of improvement being 60.037 miles.

(1): Job J5S3340 Route WW, FF CRAWFORD County. Resurface on Route WW and on Route FF, the total length of improvement being 7.175 miles.
(2): Job J5S3394 Various Routes, CRAWFORD, PHELPS County. Resurface on Rte. BB from Rte. 8 to the end of state maintenance, on Rte. UU from I-44 south outer road to the end of state maintenance, on I-44 south outer road from Rte. ZZ to the Crawford County line and Rte. KK in Phelps County from Rte. 8 to the Crawford County line, the total length of improvement being 17.549 miles.

Job J5S3438 Route J, AA CAMDEN County. Seal coat from Rte. 7 to Rte. 54 on Rte. J and From end of state maintenance to Rte. 54 on Rte. AA, the total length of improvement being 16.231 miles.
Job J6I3492 Route I-70 ST CHARLES County. Resurface from the Warren County Line to Wentzville Pkwy, the total length of improvement being 4.775 miles.
Job J6M0286 Route 270 ST LOUIS County. Sound Wall Repair on I-270 east of Rte. 21, the total length of improvement being 0.0123 miles.
Job J6P3373 Route 364 ST CHARLES, ST LOUIS County. Signing, Guardrail, and Concrete Barrier from Jungs Sta. Road to east of Missouri River, the total length of improvement being 3.365 miles.

(1): Job J6P3418 Route 94 ST CHARLES County. Grading, Pavement, Bridge Rehab, and Wall at Rte 94/364 and Muegge Road, the total length of improvement being 2.05 miles.
(2): Job J6S3304 Route 94 ST CHARLES County. Resurface from Rte 364 to I-70, the total length of improvement being 2.02 miles.
(3): Job J6S3600 Route 94 ST CHARLES County. Grading and Pavement from Pralle lane to Shermann Drive, the total length of improvement being 0.971 miles.

Job J6S3090C Route E JEFFERSON County. Bank Stabilization 0.16 mi. s/o Rte. N in De Soto, the total length of improvement being 0.142 miles.
Job J6S3270 Route Big Bend ST LOUIS County. Bridge replacement at Big Bend over I-44, the total length of improvement being 0.18 miles.

(1): Job J7I3258 Route I-49 BATES, CASS County. Resurface on Rte. A and Rte. B in Archie to Rte. A and Rte. B in Rich Hill, the total length of improvement being 52.745 miles.
(2): Job J7S3295 Route 18 BATES, HENRY County. Resurface from east of I-49 in Adrian to County Road 1601 in Henry County, the total length of improvement being 17.519 miles.

Job J9S3504 Route D WAYNE County. Grading, pavement and culvert extension from East Fork Lost Creek to south of Co Rd 524, the total length of improvement being 1.235 miles.
Counties: Counties visited
Travel Mapping: Summary

kphoger

By the way, thank you for posting the county name so prominently on these.  It makes it much easier to scan through them and see if any interest me.
Keep right except to pass.  Yes.  You.
Visit scenic Orleans County, NY!
Male pronouns, please.

Quote from: Philip K. DickIf you can control the meaning of words, you can control the people who must use them.

mvak36

Quote from: kphoger on August 23, 2021, 01:21:51 PM
By the way, thank you for posting the county name so prominently on these.  It makes it much easier to scan through them and see if any interest me.

Sure no problem. That's how they have it on their Plans site. I just copy those over so I can't really take credit for that.
Counties: Counties visited
Travel Mapping: Summary

SkyPesos

Quote from: mvak36 on August 21, 2021, 09:05:52 AM
(1): Job J6P3418 Route 94 ST CHARLES County. Grading, Pavement, Bridge Rehab, and Wall at Rte 94/364 and Muegge Road, the total length of improvement being 2.05 miles.
(2): Job J6S3304 Route 94 ST CHARLES County. Resurface from Rte 364 to I-70, the total length of improvement being 2.02 miles.
(3): Job J6S3600 Route 94 ST CHARLES County. Grading and Pavement from Pralle lane to Shermann Drive, the total length of improvement being 0.971 miles.
I'm guessing the bridge rehab for MO 94 and Muegge is the in planning DDI? If it's not, then whatever this bridge rehab is would be a waste imo.
Also interesting that they're going to resurface MO 94 between 364 and I-70 now when there are plans later this decade to turn that section into a freeway w/ frontage lanes.

mvak36

Quote from: SkyPesos on August 24, 2021, 11:34:57 AM
Quote from: mvak36 on August 21, 2021, 09:05:52 AM
(1): Job J6P3418 Route 94 ST CHARLES County. Grading, Pavement, Bridge Rehab, and Wall at Rte 94/364 and Muegge Road, the total length of improvement being 2.05 miles.
(2): Job J6S3304 Route 94 ST CHARLES County. Resurface from Rte 364 to I-70, the total length of improvement being 2.02 miles.
(3): Job J6S3600 Route 94 ST CHARLES County. Grading and Pavement from Pralle lane to Shermann Drive, the total length of improvement being 0.971 miles.
I'm guessing the bridge rehab for MO 94 and Muegge is the in planning DDI? If it's not, then whatever this bridge rehab is would be a waste imo.
Also interesting that they're going to resurface MO 94 between 364 and I-70 now when there are plans later this decade to turn that section into a freeway w/ frontage lanes.

I haven't looked at the plans (not sure I would understand it even I did), but the link you posted shows the Contract Award as October 2021 which lines up with when this letting gets awarded.
Counties: Counties visited
Travel Mapping: Summary

mvak36

Quote from: SkyPesos on August 24, 2021, 11:34:57 AM
Quote from: mvak36 on August 21, 2021, 09:05:52 AM
(1): Job J6P3418 Route 94 ST CHARLES County. Grading, Pavement, Bridge Rehab, and Wall at Rte 94/364 and Muegge Road, the total length of improvement being 2.05 miles.
(2): Job J6S3304 Route 94 ST CHARLES County. Resurface from Rte 364 to I-70, the total length of improvement being 2.02 miles.
(3): Job J6S3600 Route 94 ST CHARLES County. Grading and Pavement from Pralle lane to Shermann Drive, the total length of improvement being 0.971 miles.
I'm guessing the bridge rehab for MO 94 and Muegge is the in planning DDI? If it's not, then whatever this bridge rehab is would be a waste imo.
Also interesting that they're going to resurface MO 94 between 364 and I-70 now when there are plans later this decade to turn that section into a freeway w/ frontage lanes.

Is there enough room to make it a freeway? It looks fairly built up as it gets closer to I-70.
Counties: Counties visited
Travel Mapping: Summary

SkyPesos

#160
Quote from: mvak36 on August 24, 2021, 12:00:29 PM
Quote from: SkyPesos on August 24, 2021, 11:34:57 AM
Quote from: mvak36 on August 21, 2021, 09:05:52 AM
(1): Job J6P3418 Route 94 ST CHARLES County. Grading, Pavement, Bridge Rehab, and Wall at Rte 94/364 and Muegge Road, the total length of improvement being 2.05 miles.
(2): Job J6S3304 Route 94 ST CHARLES County. Resurface from Rte 364 to I-70, the total length of improvement being 2.02 miles.
(3): Job J6S3600 Route 94 ST CHARLES County. Grading and Pavement from Pralle lane to Shermann Drive, the total length of improvement being 0.971 miles.
I’m guessing the bridge rehab for MO 94 and Muegge is the in planning DDI? If it’s not, then whatever this bridge rehab is would be a waste imo.
Also interesting that they’re going to resurface MO 94 between 364 and I-70 now when there are plans later this decade to turn that section into a freeway w/ frontage lanes.

Is there enough room to make it a freeway? It looks fairly built up as it gets closer to I-70.
I think the plan is to keep the SPUI at I-70, instead of turning it into something fancier.

Though a (much cheaper) alternative to the full freeway is just to widen the entire stretch between MO 364 and I-70 to 6 lanes. Based on the wording of the contract above for MO 94, that could be possible this time around, instead of doing a freeway.

EDIT: I found this on the presentation in the link above. So including auxiliary lanes, I guess they're widening it to 8 lanes.

mvak36

The winning bids for the August letting were awarded at the MHTC meeting on 9/9/21.
Counties: Counties visited
Travel Mapping: Summary

mvak36

#162
October 15, 2021 Letting: Bid Results. Bid Award Winners.

Projects listed in blue font are part of Missouri Focus on Bridges program.

(1): Job J1P3252 Route 65 GRUNDY County. Bridge rehabilitation over Rte. 6 in Trenton, the total length of improvement being 0.077 miles.
(2): Job J1P3255 Route 36 LIVINGSTON County. Bridge rehabilitation over Blackwell Creek, 1.2 miles east of Rte. 65 near Chillicothe, the total length of improvement being 0.087 miles.
(3): Job J1S3259 Route UU CARROLL County. Bridge redeck over Turkey Creek 5.8 miles east of Rte. 65 near Carrollton, the total length of improvement being 0.114 miles.
(4): Job J1S3264 Route 139 CARROLL County. Bridge redeck over Hurricane Creek 2.9 miles south of Rte. HH near Hale, the total length of improvement being 0.099 miles.
(5): Job J1S3265 Route UU CARROLL County. Bridge redeck over Big Creek 5.9 miles east of Rte. 65 near Carrollton, the total length of improvement being 0.163 miles.
(6): Job J1S3266 Route 116 CALDWELL County. Bridge redeck over the Union Pacific Railroad 2 miles east of Rte. 13 near Polo, the total length of improvement being 0.103 miles.

Job J2P3281 Route 24 MARION County. Pavement repair and diamond grinding from 0.9 mile east of Rte. 61 to Mississippi River at West Quincy, the total length of improvement being 6.299 miles.

(1): Job J2S3208 Route TT ST CHARLES, WARREN County. Resurface from Route 94 near Dutzow to Route T in St. Charles County, the total length of improvement being 3.54 miles.
(2): Job J2S3239 Route A LINCOLN, WARREN County. Resurface from Route DD to I-70 near Pendleton in Warren County, the total length of improvement being 12.922 miles.
(3): Job J2S3240 Route U LINCOLN County. Resurface on Route 47 to Route J South Junction near Troy, the total length of improvement being 8.877 miles.

Job J2S3296 Route MM MARION County. Resurface from Rte. 24 to Rte. 61 in Hannibal and 0.4 mile east of Rte. 24 on outer road, the total length of improvement being 7.054 miles.
Job J2S3441 Route OR 70 MONTGOMERY, WARREN County. Resurface on Route Y in Jonesburg to 0.15 Mile West of West Warrenton Boulevard, the total length of improvement being 7.513 miles.

(1): Job J3S3148 Route H SALINE County. Resurface from Route 65 to Oleander Ave in Nelson, the total length of improvement being 11.719 miles.
(2): Job J3S3171 Route WW SALINE County. Resurface from Business Route 65 to 197th Trail, near Marshal, the total length of improvement being 3.467 miles.

Job J3S3161 Route E JOHNSON County. Resurface from Route 13 to Route NN, the total length of improvement being 13.513 miles.

(1): Job J4P3009 Route 50 JACKSON County. Bridge replacement over Chipman Road near Lee's Summit, the total length of improvement being 0.313 miles.
(2): Job J4P3009B Route 50 JACKSON County. Grading and pavement from w/o Murray Road to w/ Blue Parkway, the total length of improvement being 0.454 miles.

Job J4S3247 Route 152 PLATTE County. Coldmill and resurface from Route N to the west side of I-29, the total length of improvement being 5.238 miles.
Job J4S3340 Route 169 CLAY County. Resurface from Route KK to Clay/Clinton County Line, the total length of improvement being 3.849 miles.
Job J5P3328 Route Various VARIOUS County. Resurface and add shoulders Rte. 7 from Rte. 5 to Rte. 133, Rte. 52 from Rte. 17 to Rte. 133, and Rte. 133 in Richland, the total length of improvement being 39.5 miles.
Job J6I3541 Route I-70, 364 VARIOUS County. Bridge washing on I-70 and Rte. 364, the total length of improvement being 1.837 miles.
Job J6M0285 Route 340 ST LOUIS County. Erosion and pipe repair 1 mile west of route 170 at River Des Peres in University City, the total length of improvement being 0.013 miles.
Job J6P3637 Route 67 ST LOUIS County. Guard cable installation from Missouri River to north of New Jamestown Road, the total length of improvement being 1.343 miles.
Job J6Q3227E Route Various VARIOUS County. ITS maintenance within St. Louis District, the total length of improvement being 0 miles.

(1): Job J6S3303 Route 94 ST CHARLES County. Pavement preservation treatment from I-64 to Route 364, the total length of improvement being 3.514 miles.
(2): Job J6S3305 Route D ST CHARLES County. Preventative maintenance treatment from Route T to Route Z, the total length of improvement being 4.9 miles.

Job J6S3317 Route 94 ST CHARLES County. 3 Bridge rehabilitations at various locations near Saint Peters, the total length of improvement being 0.094 miles.

(1): Job J6S3429 Route 70 ST LOUIS CITY County. 14 Bridge rehabilitations at various overpasses from North Hanley Road to Madison St, the total length of improvement being 6.9 miles.
(2): Job J6S3429B Route 70 ST LOUIS CITY County. Bridge rehabilitation at Adelaide Avenue over City Streets and Railroads, the total length of improvement being 0.302 miles.

Job J6S3657 Route Various ST CHARLES, ST LOUIS County. Pavement repair on Various Routes in St. Charles and St. Louis Counties, the total length of improvement being 7.082 miles.

(1): Job J7S3304 Route D NEWTON County. Resurface from Mink Drive in Neosho to Route 76 in Longview, the total length of improvement being 12.995 miles.
(2): Job J7S3305 Route HH NEWTON County. Resurface from Route 86 to Route 60 in Neosho, the total length of improvement being 1.523 miles.
(3): Job J7S3307 Route H MCDONALD County. Resurface from Route 90 in Noel to Business 71 near Pineville, the total length of improvement being 7.052 miles.

(1): Job J7S3293B Route A, K WEBSTER County. Resurface and add shoulders on Route A from Route 38 to Route 60 and on Route K from Route 60 to Route 14, the total length of improvement being 27.463 miles.
(2): Job J7S3346 Route 38 WEBSTER County. Resurface from Route J to east of Blair Street in Marshfield, the total length of improvement being 2.1 miles.

(1): Job J7S3294 Route BB VERNON County. Resurface from Rte. 54 in Nevada to end of route I-49 south Milo., the total length of improvement being 13.308 miles.
(2): Job J7S3303 Route W VERNON County. Coldmill and resurface from beginning of route to Rte. 54 in Nevada, the total length of improvement being 3.648 miles.

Job J7L21ROA Route ROA BARRY County. Resurface in Roaring River State Park, the total length of improvement being 4.587 miles.
Job J9S3390 Route 63 HOWELL County. Resurface from McFarland street to Rte. 63 in West Plains, the total length of improvement being 4.27 miles.

EDIT: Additional lettings added
(1): Job J6S3272 Route I-44 ST LOUIS CITY County. Bridge replacement at Broadway over I-44, the total length of improvement being 0.314 miles.
(2): Job J6S3638 Route I-44 ST LOUIS CITY County. Grading and pavement to rebuild off ramp from I-44 express lane to Broadway, the total length of improvement being 0.314 miles.
Withdrawn. Will be let in a future letting.

Job J4S3273 Route 58 CASS County. Intersection improvements and resurfacing at the intersection of Route 58 and Ward Rd., at the intersection of Route 58 and Route 291, and from e/o Prairie to Route 291 near Raymore, the total length of improvement being 2.584 miles.
Counties: Counties visited
Travel Mapping: Summary

mvak36

The winning bids for the September letting were awarded at the MHTC meeting on 10/7/21.

Please note that the links they provided don't open a pdf like before. It opens a pop up asking whether you want to open or download the file.
Counties: Counties visited
Travel Mapping: Summary

mvak36

#164
Lot of projects in this one.

November 19, 2021 Letting: Bid Results. Bid Award Winners.

Projects listed in blue font are part of Missouri Focus on Bridges program.

(1): Job J1P3107 Route 136 NODAWAY County. Bridge replacement over Mozingo Creek 1 mile east of Rte. F near Maryville, the total length of improvement being 0.034 miles.
(2): Job J1P3160 Route 136 NODAWAY County. Bridge replacement over Long Branch 1.2 miles west of Rte. E near Ravenwood, the total length of improvement being 0.032 miles.

(1): Job J1P3275 Route 24, 65 CARROLL County. 7 Bridge rehabilitations over Moss Creek Drainage Ditch, Rte. 10, outer road 24, Rte. 65, BNSF railroad, Little Wakenda Creek, the total length of improvement being 0.371 miles.
(2): Job J1P3302 Route 24 CARROLL County. Resurface from Dewitt to Carrollton, the total length of improvement being 14.691 miles.

Job J1P3277 Route 36 LIVINGSTON County. Resurface in the eastbound lane from Rte. C to Parsons Creek and in the westbound lanes from Coon Creek to Parsons Creek., the total length of improvement being 12.511 miles.
Job J1P3295 Route 36 BUCHANAN County. Bridge rehabilitation over the Missouri River, on eastbound and westbound lanes bridges, in St. Joseph., the total length of improvement being 0.504 miles.

(1): Job J1P3306 Route 13 CALDWELL County. Resurface and add shoulders from North of Route HH in Kingston to Ray County line, the total length of improvement being 8.042 miles.
(2): Job J1S3305 Route M ANDREW County. Resurface from Route 48 to Route 169 near Union Star, the total length of improvement being 5.439 miles.

Job J1S3213 Route B GENTRY County. Bridge replacement over Grantham Creek 1 mile north of Rte. O near Ravenwood., the total length of improvement being 0.087 miles.

(1): Job J1S3215 Route A HARRISON County. Bridge redeck over I-35, 0.4 mile east of Rte. 69 near Ridgeway, the total length of improvement being 0.056 miles.
(2): Job J1S3230 Route Z DAVIESS County. Bridge redeck over Sampson Creek, 1.1 miles east of Rte. AA near Pattonsburg, the total length of improvement being 0.055 miles.
(3): Job J1S3278 Route YY PUTNAM County. Bridge redeck over Sandy Creek, 2.5 miles north of Rte. 136, near Unionville, the total length of improvement being 0.028 miles.
(4): Job J1S3279 Route D MERCER County. Bridge redeck over Sandy Creek, 1.4 miles south of Rte. 136, near Mount Moriah, the total length of improvement being 0.031 miles.

(1): Job J2MAMD03 Route A CLARK, LEWIS County. Resurface from Rte. 136 to Rte. E in Williamstown, the total length of improvement being 19.684 miles.
(2): Job J2MAMD05 Route 149 ADAIR, MACON County. Resurface from Rte. 6 to Rte. 11 and from Rte. 11 to Rte. J in Goldsberry, the total length of improvement being 23.446 miles.
(3): Job J2MAMD10 Route U CLARK, SCOTLAND County. Resurface from Rte. 136 to Rte. A 1.9 miles south of Wyaconda, the total length of improvement being 15.464 miles.

(1): Job J2P3103 Route 6 KNOX, SHELBY County. Resurface from Rte. 6 north junction at Edina to Rte. 168 in Shelbyville, the total length of improvement being 32.044 miles.
(2): Job J2S3363 Route P KNOX County. ADA improvements from west city limits to Fulton St. in Edina, the total length of improvement being 0.406 miles.
(3): Job J2S3402 Route BB KNOX County. ADA improvements from Rte. 15 to Plevna Place in Plevna, the total length of improvement being 0.047 miles.

(1): Job J2P3277 Route 6 KNOX, LEWIS, MARION County. Seal coat from Rte. 15 to 0.2 mile west of Rte. 61 near Taylor, the total length of improvement being 40.827 miles.
(2): Job J2S3332 Route V LEWIS, MARION County. Seal coat from Rte. 6 to Rte. 61 near Maywood, the total length of improvement being 6.084 miles.

Job J2P3279 Route 63 ADAIR, MACON, RANDOLPH County. Resurface from Bus. 63 to 1.6 miles south of Route 24 near Moberly in Randolph County, the total length of improvement being 25.853 miles.
Job J3P3064 Route 50 JOHNSON County. Coldmill and Resurface from County Road 1501 to 0.1 mile east of Route 13 in Warrensburg, the total length of improvement being 20.734 miles.

(1): Job J3S3151 Route TT PETTIS County. Resurface from Route 50 to Lamms Lane, the total length of improvement being 2.982 miles.
(2): Job J3S3165 Route U PETTIS County. Resurface from 28th Street to Route V in Sedalia, the total length of improvement being 7.878 miles.
(3): Job J3S3170 Route U PETTIS County. Resurface from Route V to the Benton County line, the total length of improvement being 2.972 miles.

Job J4I3331 Route 635 PLATTE County. Resurface from I-29 to the Kansas state line, the total length of improvement being 3.098 miles.
Job J4I3332 Route 49 CASS County. Resurface from 163rd Street to 0.2 mile north of 283rd Street, the total length of improvement being 18.576 miles.
Job J4I3333 Route 435 PLATTE County. Coldmill and resurface from Platte County line to I-29, the total length of improvement being 10.746 miles.
Job J4P3295D Route A CLAY County. Intersection improvements at 112th Street, the total length of improvement being 0.32 miles.
Job J4P3344 Route 45 PLATTE County. Resurface from 650' n/o Moore's Ferry Road to east of I-435, the total length of improvement being 2.354 miles.
Job J4P3346 Route 69 CLAY County. Resurface from Clinton County line to Rte. 92, the total length of improvement being 5.994 miles.

(1): Job J5I3397 Route I-44 CRAWFORD, PHELPS County. Resurfacing from Sugartree Road interchange to east of Route F interchange, the total length of improvement being 52.782 miles.
(2): Job J5I3482 Route I-44 PHELPS County. Bridge rehabilitation and culvert extension over Bourbouse River Branch and over East Fork Little Beaver Creek, the total length of improvement being 0.043 miles.
(3): Job J5I3572 Route I-44 PHELPS County. Reconstruction of pavement on east bound lanes of I-44 from Rolla to St. James, the total length of improvement being 8.2 miles.

(1): Job J5S3284 Route Various VARIOUS County. Bridge rehabilitation and redeck on Route 100 over the Gasconade River near Gasconade, on Route 42 over the Gasconade River near Vienna , on Route 89 over the Gasconade River near Rich Fountain, the total length of improvement being 0.795 miles.
(2): Job J5S3344 Route 89 OSAGE County. Bridge redeck over Swan Creek near Rich Fountain, the total length of improvement being 0.082 miles.


Job J5S3346 Route C CRAWFORD County. Resurface from Route 19 to I-44, the total length of improvement being 12.36 miles.

(1): Job J5S3356 Route P, O WASHINGTON County. Resurface from MO 8 to SME on Route O; from MO 8 to Route C on Route P, the total length of improvement being 16.559 miles.
(2): Job J5S3396 Route F WASHINGTON County. Resurface from west of Coleman Ave. to SME, the total length of improvement being 8.242 miles.

Job J5S3410 Route Sorrels Overpass BOONE County. Bridge superstructure replacement over I-70 in Columbia, the total length of improvement being 0.272 miles. Moved to Emergency Letting on October 22, 2021
Job J6I3424 Route 70 ST LOUIS CITY County. Resurface from Branch Street to Biddle Street and Biddle Street under I-44, the total length of improvement being 1.89 miles.
Job J6I3471 Route I-270 and I-255 ST LOUIS County. Sign Installation on I-270 and I-255 from Riverview to Koch Road, the total length of improvement being 31.483 miles.

(1): Job J6P3308 Route 367 ST LOUIS County. 9 Bridge Rehabilitations from Route 67 (Lindbergh) to I-270 and then at Maline Creek, the total length of improvement being 1.091 miles.
(2): Job J6S3437 Route 367 ST LOUIS County. Resurface on Route 367 from North of I-270 to Halls Ferry Circle, the total length of improvement being 3.42 miles.

Job J6P3478 Route Various VARIOUS County. Sign Installation various locations in the St. Louis District, the total length of improvement being 0 miles.

(1): Job J7P3210 Route 65 CHRISTIAN, TANEY County. Resurface from 0.4 mile north of Route EE in Christian County to 0.8 mile north of Route 465 in Taney County, the total length of improvement being 16.091 miles.
(2): Job J7P3352 Route 65 CHRISTIAN County. High Friction Surface Treatment on curves near Saddlebrooke, the total length of improvement being 0.592 miles.

Job J7P3387 Route 265 STONE County. Resurface from Route 76 to 0.5 mile north of Route 165, the total length of improvement being 5.342 miles.

(1): Job J7P3389 Route Various VARIOUS County. High friction surface treatment on various routes in various counties, the total length of improvement being 1.713 miles.
(2): Job J8P3206 Route 14 CHRISTIAN County. High Friction Surface Treatment from west of Carroll Road to west of Hilltop Court near Nixa, the total length of improvement being 0.397 miles.

Job J7S3367D Route 160 GREENE County. ADA Improvements on Route 160 from Chandler Avenue to Routes F and V and on Route V from north of College Street to Route 160 in Ash Grove, the total length of improvement being 0.313 miles.

(1): Job J8P3087D Route 160, 744 GREENE County. Intersection improvement on West Bypass at Rte. 744 (Kearney Street) in Springfield, the total length of improvement being 0.5 miles.
(2): Job J8P3170 Route 160 GREENE County. Resurface from I-44 to Route 413 (Sunshine Street), the total length of improvement being 7.962 miles.
(3): Job J8S3168 Route 160 GREENE County. Resurface on West Bypass from Route 413 (Sunshine Street) to north of Route 60 (James River Freeway), the total length of improvement being 2.173 miles.

(1): Job J8S3217 Route OR 44 GREENE County. Resurface at various locations in Springfield and Strafford, the total length of improvement being 5.68 miles.
(2): Job J8S3218 Route OR44/OR13 GREENE County. Resurface on various outer road locations near Route 13 in north Springfield, the total length of improvement being 0.413 miles.
(3): Job J8S3219 Route OR44 GREENE County. Resurface from Farm Road 112 to 0.2 mile west of Route 13 in Springfield, the total length of improvement being 2.042 miles.

Job J7S3194 Route 86 TANEY County. Bridge Replacement over Long Creek Branch of Table Rock Lake, the total length of improvement being 0.612 miles.
Job J9I3601 Route 55 STE GENEVIEVE County. Resurface from Rte. T to .4 miles south of Rte. M and on southbound lanes from .4 mils south of Rte. M to, the total length of improvement being 25.431 miles.

(1): Job J9P3391 Route AB SCOTT County. Resurface from County Road 217 to I-55 and on Airport Road from Rte. AB south 1.1 miles, the total length of improvement being 2.9 miles.
(2): Job J9S3464 Route K SCOTT County. Resurface from Rte. N near Scott City to Rte. AB, the total length of improvement being 1.32 miles.

Job J9P3629 Route Various VARIOUS County. Erosion control repair at various locations in the Southeast District, the total length of improvement being 0 miles.
Job J9P3705 Route 67 WAYNE County. Resurface northbound from 0.7 miles north of Rte. 34 to south of Lodi and southbound from 3.8 to 5.6 miles south of Madison County line and 0.8 miles south of Rte. 34 to Bus. 67 at Greenville, the total length of improvement being 8.587 miles.
Job J9P3746 Route 5 DOUGLAS, OZARK County. Add Shoulders from Douglas County Rte. A to Ozark County Rte. MM, the total length of improvement being 24.466 miles.
Job J9S3363 Route T VARIOUS County. Resurface from Rte. 51 near Puxico to Rte. 60, the total length of improvement being 19.034 miles.

(1): Job J9S3404 Route NN DUNKLIN County. Resurface from US 412 to State Line, the total length of improvement being 16.26 miles.
(2): Job J9S3600 Route NN DUNKLIN County. Add Shoulders from US 412 to State Line, the total length of improvement being 16.26 miles.

(1): Job J9S3433 Route E MADISON County. Resurface from the Iron County line to Bus. 67, the total length of improvement being 16.4 miles.
(2): Job J9S3482 Route 47 ST FRANCOIS County. Resurface from Washington County line to 0.2 miles east of Rte. 67 in Bonne Terre, the total length of improvement being 7.179 miles.

Job J9S3499 Route A PERRY County. Pavement improvements and culvert replacement 1.1 miles west of Wittenberg, the total length of improvement being 0.481 miles.
Job J9S3540 Route H NEW MADRID County. Bridge replacement over Ash Slough Ditch, the total length of improvement being 0.281 miles.
Job J9S3639 Route Various VARIOUS County. ADA Improvements at various locations in the Southeast District, the total length of improvement being 0 miles.
Job J9S3651 Route B MISSISSIPPI County. Resurface from Rte. 62 in Bertrand to Rte. 80, the total length of improvement being 8.47 miles.
Job J9S3750 Route 160 HOWELL County. Resurface and add center turn lane from 0.1 mile west of Rte. AB to the north intersection of County Road 6070, the total length of improvement being 2.662 miles. Will be let in December.

EDIT: Additional lettings added
(1): Job J6I3413 Route I-255 ST LOUIS County. Bridge rehabilitation at the Mississippi River, the total length of improvement being 1.591 miles.
(2): Job J6I3500 Route I-255 ST LOUIS County. Bridge rehabilitation over Koch Road, the total length of improvement being 1.591 miles.

(1): Job J7I3008 Route I-44 NEWTON County. Resurface from OK state line to 0.4 miles east of Loop 49 (Range Line Road) near Joplin, the total length of improvement being 17.668 miles.
(2): Job J7I3530 Route 49 JASPER County. Grading and pavement to add acceleration lane at I-44, the total length of improvement being 0.234 miles.
(3): Job J7P3401 Route 166 NEWTON County. Resurface from the Kansas State line to I-44, the total length of improvement being 0.752 miles.

Job J2P3370 Route Various VARIOUS County. Job order contract for guardrail repair at various locations in the Northeast District, the total length of improvement being 0 miles.
Counties: Counties visited
Travel Mapping: Summary

J N Winkler

Quote from: mvak36 on October 08, 2021, 03:35:10 PMPlease note that the links they provided don't open a pdf like before. It opens a pop up asking whether you want to open or download the file.

A couple of additional observations in this vein:

*  My MoDOT downloader has not worked since at least September 24 (the website address must have changed since the initial request lands on a redirect page that is not followed).  I plan to repair it in due course.

*  My script that extracts signing sheets automatically has not worked reliably since early this year.  It relies on sheet titles being populated as bookmarks in the PDF, and plans sets that have had bookmarks started slowing to a trickle sometime in the late winter and have now stopped altogether.  I have investigated the possibility of dumping each sheet to plain text and searching for signing-related keywords, a strategy that has worked well with other state DOTs that include metadata when they plot sheets.  With MoDOT, however, attempts at dumping text return just one garbage character per sheet.
"It is necessary to spend a hundred lire now to save a thousand lire later."--Piero Puricelli, explaining the need for a first-class road system to Benito Mussolini

mvak36

#166
October 22, 2021 Letting (Emergency Letting): Bid Results. Bid Award Winners.

Job J5S3410 Route Sorrels Overpass BOONE County. Bridge superstructure replacement over I-70 in Columbia, the total length of improvement being 0.272 miles.

Article about bridge damage: https://www.columbiamissourian.com/news/modot-updates-plans-for-sorrels-overpass/article_96631b16-30e3-11ec-b258-dbdee70685ab.html

MODOT News Release
Quote
COLUMBIA — The Missouri Department of Transportation has awarded a contract for the accelerated replacement of the North Sorrel Overpass Drive bridge over Interstate 70 west of Columbia. The overpass, located at mile marker 122 on the west side of Columbia, was significantly damaged by a passing truck on Monday, October 18. The damages resulted in the closure of the bridge.

A plan had previously been in place to replace the 63-year-old bridge in 2022. However, this damage placed the bridge on a fast track for completion. The contract was awarded to Emery Sapp and Sons, Inc., which submitted the low bid of $1,038,857.

"In the aftermath of Monday's crash, it became imperative to accelerate this project,"  said Assistant Central District Engineer Randy Aulbur. "With the awarding of this contract, the contractor can begin as early as Monday, October 25. We are excited to move forward with the demolition and replacement of this structure."

Under the terms of the contract, the current bridge must be demolished by November 8. MoDOT says there will be closures along I-70 as that demolition takes place. Closures will take place overnight and the majority will be single lane closures. Any full eastbound or westbound closures that are necessary will be limited to 15 minutes in one direction before traffic will be opened and allowed to clear. Motorists are encouraged to use alternate routes when possible, add extra time to their commute, and expect some delays in both directions of I-70.

"The closures are necessary for the safety of travelers and workers on the road,"  said Aulbur. "We will be working with the contractor to limit those closures and keep them as brief as possible."

Updates on specific closure times will be available through the MoDOT Traveler Information Map, signs on the roadway, news releases and social media. Details on the construction of the new bridge will be released once demolition is complete. MoDOT appreciates the patience of motorists during this project.

Project Website
Counties: Counties visited
Travel Mapping: Summary

Revive 755

Quote from: mvak36 on October 08, 2021, 03:58:13 PM
Route 367 ST LOUIS County. Resurface on Route 367 from North of I-270 to Halls Ferry Circle, the total length of improvement being 3.42 miles.

Job J6P3478 Route Various VARIOUS County. Sign Installation various locations in the St. Louis District, the total length of improvement being 0 miles.

There are also a lot of retroreflective signal backplates going in with this one.

mvak36

The winning bids for the October letting were awarded at the MHTC meeting on 11/3/21.
Counties: Counties visited
Travel Mapping: Summary

mvak36

#169
December 17, 2021 Letting: Bid Results. Bid Award Winners.

Projects listed in blue font are part of Missouri Focus on Bridges program.

Job J1MAMD02 Route Various VARIOUS County. Resurface in various counties in the Northwest District, the total length of improvement being 76.644 miles.

(1): Job J1P3446 Route 13 CALDWELL County. Bridge repair over Route 36 in Hamilton, the total length of improvement being 0.021 miles.
(2): Job J1P3456 Route 36 CALDWELL County. Sign installation in eastbound and westbound lanes 0.5 mile from route 13 in Hamilton, the total length of improvement being 0 miles.

(1): Job J2P3211 Route 79 PIKE, RALLS County. Resurface from Routes E and N to 0.8 Mile South of Route 54 East Junction in Louisiana, the total length of improvement being 24.52 miles.
(2): Job J2P3218 Route 54, 79 PIKE County. ADA improvement from Dougherty Pike to 4th Street and Noyes Street to South Carolina Street in Louisiana, the total length of improvement being 0.657 miles.
(3): Job J2P3346 Route 54, 79 PIKE, RALLS County. Pavement improvements from Routes E and N to 0.1 Mile North of Route 54 near Louisiana, the total length of improvement being 22.071 miles.

(1): Job J2P3241 Route 79 LINCOLN County. Resurface from Route N to 0.8 Mile North of Route C near Old Monroe, the total length of improvement being 3.77 miles.
(2): Job J2P3259 Route 61 LINCOLN, PIKE County. Resurface northbound Lanes from Route V to 0.4 Mile South of Route UU in Pike County near Bowling Green, the total length of improvement being 25.579 miles.

(1): Job J2P3248 Route 24 RANDOLPH County. Resurface and add shoulder from 0.9 mile east of Route 63 to the Monroe County line near Milton, the total length of improvement being 5.848 miles.
(2): Job J2S3337 Route Z RANDOLPH County. Resurface from Route DD to Route 63 near Cairo, the total length of improvement being 3.3 miles.
(3): Job J2S3340 Route PP MACON County. Resurface from Route 63 to Route V near Macon, the total length of improvement being 7.612 miles.

(1): Job J2P3258 Route 54 AUDRAIN County. Resurface from Route J in Mexico to Route 19 south junction near Martinsburg, the total length of improvement being 11.57 miles.
(2): Job J2S3265 Route J AUDRAIN County. Resurface from Bus 54 in Mexico to Route 54 at Basinger Corner, the total length of improvement being 17.796 miles.
(3): Job J2S3336 Route KK AUDRAIN County. Resurface from Route J to Route B near Rush Hill, the total length of improvement being 6.72 miles.

Job J2S3358 Route BUS 61 PIKE County. Grading and pavement at Route 161 and South Court Street in Bowling Green, the total length of improvement being 0.0825 miles.
Job J2S3369 Route BUS 63 ADAIR County. Grading and pavement from Route 63 west outer road to Route 6 north junction in Kirksville, the total length of improvement being 1.181 miles.
Job J5I3252 Route I-70 COOPER County. Resurface from the Saline County line to west of the Missouri River, the total length of improvement being 52.249 miles.
Job J5MAMD03 Route Various GASCONADE, OSAGE County. Resurface on Rte. J from Rte. 89 to SME, Osage Rte. N from US 50 to Rte. 100, Gasconade Rte. F from Rte. 19 to SME, Gasconade Rte. CC from Rte. B to SME, the total length of improvement being 42.542 miles.

(1): Job J5P3439 Route 42, Osage Beach Pkwy CAMDEN, MILLER County. Resurface and guardrail replacement from Osage Beach Pkwy to Iberia, the total length of improvement being 21.73 miles.
(2): Job J5P3499 Route 54 CAMDEN County. Resurface from the Grand Glaize Bridge to east of East Osage Beach Parkway in Osage Beach, the total length of improvement being 6.239 miles.

Job J5S3349 Route U PHELPS County. Bridge redeck over I-44, the total length of improvement being 0.049 miles.

(1): Job J5S3330 Route 40 HOWARD County. Bridge replacement 1.95 miles west of Route 240, near Rocheport, the total length of improvement being 0.353 miles.
(2): Job J5S3403 Route F COOPER County. Bridge redeck over Stephens Branch, the total length of improvement being 0.053 miles.
(3): Job J5S3416 Route 40 HOWARD County. Bridge redeck over Bonne Femme Creek, the total length of improvement being 0.06 miles.

Job J5S3470 Route 179, AA COLE, MONITEAU County. Resurface on Route 179 from Route 87 to Truman Blvd. and on Route AA from Route 179 to Route 87, the total length of improvement being 22.189 miles.
Job J5S3492 Route Various MILLER, MONITEAU County. Resurface from E to 52 in Eldon, the total length of improvement being 30.86 miles.
Job J5I3413 Route I-70 BOONE, CALLAWAY County. Bridge rehabilitation of westbound lanes over Cedar Creek and Little Cedar Creek east of Columbia, the total length of improvement being 0.294 miles.
Job J5P3332 Route 32 LACLEDE County. Bridge Replacement over Mill Creek south of Route U near Nebo, the total length of improvement being 0.051 miles.
Job J5S3317 Route D CALLAWAY County. Resurface and shoulder widening from I-70 to Route 94, the total length of improvement being 18.175 miles.
Job J6P3242B Route 21 JEFFERSON County. Intersection improvements at Lowry Lane, the total length of improvement being 0.607 miles.

(1): Job J6S3272 Route I-44 ST LOUIS CITY County. Bridge replacement at Broadway over I-44, the total length of improvement being 0.314 miles.
(2): Job J6S3638 Route I-44 ST LOUIS CITY County. Grading and pavement to rebuild off ramp from I-44 express lane to Broadway, the total length of improvement being 0.314 miles.

(1): Job J7P3191B Route E NEWTON County. Bridge rehabilitation and guardrail replacement over Shoal Creek 1.3 miles north of Granby, the total length of improvement being 0.223 miles.
(2): Job J7P3191C Route E NEWTON County. Guardrail Replacement over BNSF RR north of Shoal Creek, the total length of improvement being 0.166 miles.

Job J8S3222 Route KK GREENE County. Replace culvert east of Hidden Lake Ln, the total length of improvement being 0.092 miles.
Job J9S3063B Route M SCOTT County. Signal and ADA improvements from the West Outer Road of I-55 to East Outer Roads of I-55 in Scott City, the total length of improvement being 0.296 miles.
Job J9S3452 Route 177 CAPE GIRARDEAU County. Grading, pavement, and bridge replacement from south of County Road 651 to north of County Road 643, the total length of improvement being 0.98 miles.
Job J9I3597 Route 155 PEMISCOT County. Resurface from Rte. 412 to Tennessee State line, the total length of improvement being 19.978 miles.

(1): Job J9S3560 Route 162 NEW MADRID County. Bridge Replacement over Drainage Ditches 1 & 251, the total length of improvement being 0.242 miles.
(2): Job J9S3562 Route 162 NEW MADRID County. Culvert replacement over Drainage Ditch 62, the total length of improvement being 0.057 miles.


EDIT: Additional Lettings added
Job J5S3350 Route B PHELPS County. Bridge replacement over Clear Creek near Royal, the total length of improvement being 0.21 miles.

(1): Job J6I3149 Route I-55 ST LOUIS County. Bridge Rehabilitation from Holly Hills Ave to Arsenal St, the total length of improvement being 3.888 miles.
(2): Job J6I3187 Route I-55 ST LOUIS County. Bridge Rehabilitation from Lindbergh Blvd (61/67) to Holly Hills Ave, the total length of improvement being 5.654 miles.

(1): Job J9P3682 Route 63 OREGON County. Resurface from Rte. 19 to Arkansas State line, the total length of improvement being 3.094 miles.
(2): Job J9P3748 Route US 63 OREGON County. Pavement improvements at Rte. 19, the total length of improvement being 1605 miles.
(3): Job J9S3390 Route 63 HOWELL County. Coldmill and resurface from McFarland street to Rte. 63 in West Plains, the total length of improvement being 4.27 miles.
(4): Job J9S3750 Route 160 HOWELL County. Resurface and add center turn lane from 0.1 mile west of Rte. AB to the north intersection of County Road 6070, the total length of improvement being 2.662 miles.

Job J3M0256 Route I-70 SALINE County. Drop Inlet, culvert and erosion repair 0.3 miles west of Cooper County line, the total length of improvements being 0.08 miles.
Counties: Counties visited
Travel Mapping: Summary

SkyPesos

Quote from: mvak36 on November 11, 2021, 11:55:40 AM
(2): Job J6S3638 Route I-44 ST LOUIS CITY County. Grading and pavement to rebuild off ramp from I-44 express lane to Broadway, the total length of improvement being 0.314 miles.
When did I-44 started having an express lane in St Louis? I thought the only express lane in the metro area is on I-70, and a pretty useless one too.

J N Winkler

Quote from: SkyPesos on November 11, 2021, 11:36:16 PMWhen did I-44 started having an express lane in St Louis? I thought the only express lane in the metro area is on I-70, and a pretty useless one too.

The express lane now overlaps partially with I-44, which was extended over former I-70 alignment to the west end of the Stan Span.
"It is necessary to spend a hundred lire now to save a thousand lire later."--Piero Puricelli, explaining the need for a first-class road system to Benito Mussolini

mvak36

The winning bids for the November letting were awarded at the MHTC meeting on 12/1/21.
Counties: Counties visited
Travel Mapping: Summary

mvak36

#173
January 21, 2022 Letting: Bid Results. Bid Award Winners.

Projects listed in blue font are part of Missouri Focus on Bridges program.

(1): Job J1P3379 Route 159 HOLT County. Pavement improvements from the Missouri River, near Rulo, NE, to Little Tarkio Creek, near Fortescue, the total length of improvement being 5.239 miles.
(2): Job J1P3432 Route 159 HOLT County. Pavement improvements from Route 111 n/o Forest City to Little Tarkio River, the total length of improvement being 4.268 miles.
(3): Job J1S3380 Route 111 HOLT County. Pavement improvements from 1 mile west of Route 118 to Route 118, the total length of improvement being 0.886 miles.

Job J1S3209C Route V CARROLL County. Bridge replacement with box culvert 2.6 miles south of Route 24 and Route V Intersection, the total length of improvement being 0.097 miles.
Job J2I3310 Route I-70 MONTGOMERY County. Resurface from Callaway County line to 2 miles east of Route F near High Hill, the total length of improvement being 32.43 miles.

(1): Job J2S3373 Route 107 MONROE County. Bridge deck seal coat over South Fork Salt River 0.6 mile south of Rte. U near Florida, the total length of improvement being 0.313 miles.
(2): Job J2S3374 Route 107 MONROE County. Bridge deck seal coat over North Fork Salt River 0.5 mile north of Rte. U near Florida, the total length of improvement being 0.381 miles.

Job J3I3227 Route 70 LAFAYETTE County. Shoulder improvements from Route 13 to Route Y, the total length of improvement being 13.14 miles.
Job J4I3484 Route I-35/I-29 CLAY County. Slope repair ramp from Southbound I-29 to Northbound I-35, the total length of improvement being 0.066 miles.
Job J5I3381 Route 44 PULASKI County. 2 Bridge rehabilitations over the Roubidoux Creek and over Trophy Lane near St Robert, the total length of improvement being 0.204 miles.
Job J5I3400 Route I70 COOPER County. Bridge rehabilitation bridge over Chouteau Creek, the total length of improvement being 0.106 miles.
Job J5I3595 Route I-70 BOONE, CALLAWAY County. Culvert repair 0.8mi. W/o Rte. Z, 0.9 mi. E/o St. Charles Rd., and 1.1 mi. W/o Rte. E, including Rte. B 0.4 mi. E/o Brown Station Rd., and Rte. 54 0.4 mi. S/o Rte. TT, the total length of improvement being 0.007 miles.

(1): Job J5S3283 Route 100 OSAGE County. Bridge deck replacement over Deer Creek 4 miles west of Chamois, the total length of improvement being 0.056 miles.
(2): Job J5S3348 Route 100 OSAGE County. Bridge replacement over Cedar Creek 0.1 Miles south of Route C in Luystown, the total length of improvement being 0.096 miles.


Job J5S3473B Route 63 MARIES County. Resurfacing and pavement repair .1 miles east of CR 541 to 0.1 miles east of CR 519, the total length of improvement being 6.609 miles.

(1): Job J6I3505 Route I-44 FRANKLIN County. Pavement Repair for 4 Ramps on I-44 Interchange at Route 47 pavement repair for 4 ramps on I-44 Interchange at Route 47, the total length of improvement being 0.436 miles.
(2): Job J6P3291 Route 30/47 FRANKLIN County. Bridge redecks over I-44, the total length of improvement being 0.235 miles.
(3): Job J6S3298 Route HH FRANKLIN County. Bridge replacement Route HH over Calvey Creek, the total length of improvement being 0.151 miles.


Job J6I3622 Route I-170 ST LOUIS County. Pavement repair I-170 from I-270 to I-64, the total length of improvement being 10.4 miles.

(1): Job J6M3413 Route I-70 ST LOUIS CITY County. Bridge rehabilitation over Grand Blvd., the total length of improvement being 0.036 miles.
(2): Job J6M3414 Route I-70 ST LOUIS CITY County. Bridge rehabilitation at Taylor Ave., the total length of improvement being 0.011 miles.

Job J6P3605 Route Various FRANKLIN County. Fixed Price Variable Scope Seal coat on MO 100 from Gasconade County Line to Route KK; on Route H North of Sapsucker Road to Mo 185; on Route YY from MO 185 to Route A, the total length of improvement being 28.061 miles.

(1): Job J6S3293 Route BB JEFFERSON County. Pavement improvements from Route 30 in Cedar Hill to Elm Street in Hillsboro, the total length of improvement being 10.5 miles.
(2): Job J6S3628 Route F JEFFERSON County. Pavement improvements from Route O to St. Joseph Hills Road, the total length of improvement being 3.982 miles.

Job J6S3404 Route Lackland, Midland ST LOUIS County. Bridge redeck on Lackland Road & MIdland Blvd over I-170, the total length of improvement being 0.165 miles.
Job J6S3606 Route Various FRANKLIN County. Fixed Price Variable Scope Seal coat on Route AE in Franklin County; on Route B from Mo100 to Lower Bottom Road in Franklin County, the total length of improvement being 8.256 miles.

(1): Job J7I3460 Route Various VARIOUS County. JOC for bridge repairs JOC for bridge repairs at various location in rural Southwest District, the total length of improvement being 0 miles.
(2): Job J8P3233 Route Various VARIOUS County. Job Order Contracting for bridge repairs Job Order Contracting for bridge repairs at various location in the urban Southwest District, the total length of improvement being 0 miles.

(1): Job J7I3498 Route Various VARIOUS County. Concrete Repairs at various locations in the rural Southwest District., the total length of improvement being 12.853 miles.
(2): Job J8P3241 Route Various VARIOUS County. Concrete Pavement Repairs at various locations in the urban Southwest District, the total length of improvement being 4.168 miles.

(1): Job J7P3502 Route Various VARIOUS County. Seal coat on various routes in various counties in Southwest District, the total length of improvement being 101.642 miles.
(2): Job J8P3229 Route Various VARIOUS County. SEAL COAT on various routes in Christian and Green Counties, the total length of improvement being 8.274 miles.

Job J7P3107I Route Route K BARTON County. Bridge Redeck from 0.3 miles south of Route V to 0.66 miles north of NW 70th RD northwest of Liberal, the total length of improvement being 0.1 miles.
Job J7P3502B Route Various VARIOUS County. Seal coat on routes in Barton, Bates, Cedar, Dallas, Henry, Hickory and Polk Counties, the total length of improvement being 86.112 miles.
Job J7S3285 Route LP49 JASPER County. Bridge Replacement bridge replacement and add sidewalk on Range Line Road over Kansas City Southern Railroad, the total length of improvement being 0.327 miles.
Job J7M0267 Route UU BENTON County. Seal coat from Route 7 to end of state maintenance, the total length of improvement being 2.533 miles.
Job J9I3643 Route I-55 SCOTT County. Bridge deck replacement over Route 62, the total length of improvement being 0.133 miles.
Job J9P3380 Route MO 34 WAYNE County. Bridge deck replacement over St. Francis River, the total length of improvement being 0.367 miles.
Job J9S3742 Route 181 TEXAS County. Intersection Improvements using Governor backfill money from Cherry Street to Rte. 60 in Cabool, the total length of improvement being 0.629 miles.

EDIT: Additional lettings added
Job J4I2006 Route CLAY County. I35 & 19th Street Interchange add a new interchange and local street improvements, the total length of improvement being 0.995 miles. Project website: https://www.modot.org/i-35-and-19th-street-interchange
Job J6P3646 Route Various ST LOUIS County. Fixed Price Variable Scope Bridge Crack Fill crack fill at various bridges, the total length of improvement being 0.454 miles.

(1): Job J6S3296 Route 61/67 JEFFERSON County. Grading and pavement from Meramec River Bridge to Collier Drive, the total length of improvement being 2.499 miles.
(2): Job J6S3433 Route 61/67 JEFFERSON County. Grading and pavement from Route 231 to Richardson Road, the total length of improvement being 0.307 miles.

Was previously let in November but wasn't approved due to high bids.
(1): Job J5I3397 Route I-44 PHELPS County. Resurfacing from Sugartree Road interchange to east of Route F interchange, the total length of improvement being 28.094 miles.
(2): Job J5I3482 Route I-44 PHELPS County. 2 Bridge rehabilitations and culvert extension over Bourbouse River Branch and over East Fork Little Beaver Creek, the total length of improvement being 0.043 miles.
(3): Job J5I3572 Route I-44 PHELPS County. Reconstruction of pavement on east bound lanes of I-44 from Rolla to St. James, the total length of improvement being 8.2 miles.
Counties: Counties visited
Travel Mapping: Summary

SkyPesos

Quote from: mvak36 on December 10, 2021, 08:40:10 PM
Job J6I3622 Route I-170 ST LOUIS County. Pavement repair I-170 from I-270 to I-64, the total length of improvement being 10.4 miles.
About time...  :clap:



Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.