Fort Worth: I-820 East / SH 121 expansion

Started by Chris, September 16, 2017, 09:26:12 AM

Previous topic - Next topic

Chris

TxDOT has presented plans for the I-820 East expansion project, along the east side of Fort Worth. The project runs from SH 121 in the north to I-30 in the south.

http://www.txdot.gov/inside-txdot/get-involved/about/hearings-meetings/fort-worth/100517.html

The plan;

*  1 express lane in each direction on the I-820 / SH 121 concurrency
* expansion of I-820 / SH 121 concurrency to 6 general purpose lanes in each direction
* expansion of I-820 between SH121 and I-30 to 5 general purpose lanes in each direction

There will be 21 lanes under the Hurst Boulevard overpass, plus 3 frontage road lanes on either side. That makes a cross-section of 27 lanes.

Some screenshots of the schematics (north = right).








MaxConcrete

The connections on the southwest side of IH 820/SH121 including the direct connection ramps to Trinity Boulevard (Chris's last screenshot) are interesting.

The first phase of the project is estimated at $191 million and scheduled for bidding and award in December 2017.
http://www.dot.state.tx.us/insdtdot/orgchart/cmd/cserve/let/2018/tarrant.htm#000813221

However, I don't think the full buildout is funded. Since the entire IH 820 corridor in east Fort Worth is now the #2 regional priority megaproject, I'm thinking that funding for all the improvements in the schematics will happen relatively soon (i.e. within a couple years)
http://www.nctcog.org/trans/committees/rtc/documents/Item_4.rtc091417.pdf

www.DFWFreeways.com
www.HoustonFreeways.com

longhorn

So I820 is being expanded to five free lanes each way?

MaxConcrete

Bids were opened this week and low bid for phase 1 is $173.7 million, 7.5% below the estimate.

http://www.dot.state.tx.us/insdtdot/orgchart/cmd/cserve/bidtab/12053001.htm



Estimate   $187,793,662.46   % Over/Under   Company
Bidder 1   $173,724,094.66   -7.49%   FLATIRON CONSTRUCTORS, INC.
Bidder 2   $174,942,069.11   -6.84%   AUSTIN BRIDGE & ROAD SERVICES, LP
Bidder 3   $176,580,580.00   -5.97%   WEBBER, LLC
Bidder 4   $177,479,039.95   -5.49%   FLUOR HEAVY CIVIL, LLC
Bidder 5   $184,408,640.07   -1.80%   BALFOUR BEATTY INFRASTRUCTURE, INC.
Bidder 6   $184,824,898.63   -1.58%   JAMES CONSTRUCTION GROUP, L.L.C.
Bidder 7   $185,774,187.14   -1.08%   ARCHER WESTERN CONSTRUCTION, LLC
Bidder 8   $190,503,809.77   +1.44%   ZACHRY CONSTRUCTION CORPORATION
Bidder 9   $192,591,322.72   +2.55%   WILLIAMS BROTHERS CONSTRUCTION CO., INC.
Bidder 10   $196,234,124.07   +4.49%   J.D. ABRAMS, L.P.
Bidder 11   $204,755,122.84   +9.03%   THE LANE CONSTRUCTION CORPORATION