I-75 widening update:
MM 69-60 is done
60-55 is still a construction zone, with some bridge work going on, some short sections of median concrete barrier left to be built, and possibly a final coat of asphalt. It has about a 3 mile section where the northbound lanes are in a split 1+1 configuration while the southbound lanes are 2 together.
49-40 has a little progress toward the south end and some bridge work started, but for most of the constuction zone traffic is using the existing lanes as is, just with Jersey barriers along the inside lanes.
33-29 is coming along nicely, with the parts with a wide median looking like the pic below, and the regular width sections also have a good bit of paving done across the whole median. Traffic is still more or less on the original lanes here as well.
One thing a little different about this section is that all the lane marking are done in orange paint. I dont recall seeing that before in a construction zone.
VS988