ANDERSON/FRANKLIN 5-806: Reconstruct KY 151 from US 127 at Lawrenceburg to I-64
D/R/U/C 2023-26 $31.75m
ANDERSON 7-80001: Improve US 62 from Lawrenceburg to Tyrone/Kentucky River
D/R/U/C 2022-26 $23.3m
This will reconstruct the roadway to the Wild Turkey Distillery.
BALLARD/MCCRACKEN 1-115: Improve US 60 from Stafford Rd. to Bethel Church Rd. including Kevil bypass
C 2024 $16m
BALLARD 1-118: Improve US 60 from proposed southern bypass of La Center to east of Denis Jones Rd.
R/U 2026-27 $14.4m
BARREN 3-800002: New interchange on the Cumberland Parkway at KY 249 at Glasgow
D/R/U 2023-24 $5.6m
BOONE 6-80101: Convert KY 18 Burlington Pike to a Super Street
R/U/C 2022-24 $17.3m
BOONE 7-80102: Reconstruct KY 3060 Frogtown Rd. from US 42 to US 25
R/U/C 2023-25 $35m
BOONE 6-80150: Reconstruct KY 717 Turfway Rd. from Aero Parkway to Donaldson Rd.
R/U/C 2023-25 $15m
BRACKEN 6-80103: Reconstruct KY 8 from Wrangling Run Rd. to Old KY 19
D/R/U/C 2023-26 $43.48m
This runs along the Ohio River and is in poor structural condition. Typical roadway view:
https://goo.gl/maps/iEiW72GoJHe35WhQ7BRETHITT 10-376: Improve KY 15 from new KY 15/30 to KY 1812
D/U/C 2023-27 $22.25m
Not sure why they are continuing to improve the capacity of KY 15 through Jackson when the bypass is still in the planning stages.
CALLOWAY 1-80100: Planning study for scenic byway along Kentucky Lake
P 2023 $250k
CAMPBELL 6-352: Extend Pond Creek Rd. from US 27 to AA Highway along KY 10/1997 corridor
D/R/U/C 2022-25 $66.5m
CAMPBELL 6-8104: Construct new I-471 SB ramp to KY 8 in Newport
D/R/U/C 2022-25 $39.5m
This will replace the "temporary" ramp.
CAMPBELL 6-8105: Construct new connector road from Northern KY University at Norse Blvd. and Johns Hill Rd. to AA Highway
D/R/U/C 2023-26 $17m
CARTER/BOYD/GREENUP 9-397: Improvements to KY 67 Industrial Parkway for the Braidy Industries aluminum mill
R/U/C 2026-28 $15m
Not happening unless Braidy actually builds the mill.
CASEY 8-80150: Add lanes (2+1) to US 127 from Liberty to Lincoln County line
D/R/U/C 2024-28 $16.4m
CHRISTIAN 2-898: Reconstruct Breathitt Parkway interchange with KY 1682 north of Hopkinsville
D/R/U/C 2022-26 $11.45m
CHRISTIAN (various): Reconstruct KY 115 from I-24 to US 41
CLARK 7-8639: Extend Winchester east bypass from KY 89 to KY 627
C 2026-28 $36m
CLAY (various): Upgrade KY 80 and Hal Rogers (Daniel Boone) Parkway from Somerset to Hazard to interstate standards
From MM 10.6 at Clay/Laurel county line to MM 21.5 at Manchester: D 2026 $1m
From MM 21.5 at Manchester to MM 36: D/R/U 2026-28 $24m
CLINTON/RUSSELL 8-8601: Relocate US 127 from Aaron Ridge Rd. to KY 1730 in the vicinity of Lake Cumberland
R/U/C 2022-26 $27.2m and $38m
This does not yet tie in with the new US 127 four-lane south of KY 90.
ELLIOTT 9-192: Reconstruct KY 32 from Stegall Cold Spring Rd. to KY 7 near Newfoundland
U/C 2022-28 $53.4m
(Related is 9-8802 for widening from MM 9.2 to 10.2 in 2022-23 at the cost of $14m)
ELLIOTT 9-228: Reconstruct KY 7 from Sandy Hook to Morgan County line
D/R/U 2024-27 $11.5m
FAYETTE 7-113: Widen KY 4 New Circle Rd. from Leestown Rd. to Georgetown Rd.
R/U/C 2022-26 $49m
FAYETTE 7-122: Reconstruct US 25 from Spurr Rd. to Ironworks Rd.
R/U/C 2027-28 $29.76m and $33.6m
FAYETTE 7-252: Widen KY 922 Newtown Pike from KY 4 New Circle Road to I-64/75
C 2023-24 $17m
FAYETTE 7-265: Construct Citation Blvd. from Russell Cave Rd. to KY 922 Newtown Pike
C 2024 $3.5m
FAYETTE 7-438: Widen KY 4 New Circle Rd. from Trade Center Dr. to Woodhill Dr.
D/R/U 2023-26 $7.2m
FAYETTE 7-8902: Widen Liberty Rd. from Graftons Mill Lane to KY 4 New Circle Rd.
R/U/C 2023-26 $20.8m
FAYETTE 7-8909: Widen I-64/75
U/C 2023-27 $25m, $23.6m, $20.3m
FAYETTE/CLARK: Widen US 60 from two to four lanes from Polo Club Blvd. in Lexington to KY 1958 Bypass Rd. in Winchester
D/R/U/C 2024-28 $21m, $62.3m
FLEMING 9-80103: Reconstruct KY 57 (north of Flemingsburg?)
D/R/U/C 2023-26 $69m
FLEMING 9-80104: Reconstruct KY 801 near Sharkey
D/R/U/C 2023-26 $35.5m
FLOYD/MAGOFFIN: Mountain Parkway Extension along KY 114
D/R/U/C 2023-28 $30m, $55m, $32m, $7.4m
FLOYD 12-1.60: Mountain Parkway Corridor widening from Salyersville to Prestonsburg
C 2024-27 $100m
FRANKLIN 5-551: Widen I-64 from US 127 to US 60
D/R/U/C 2022-28: $82.5m
FRANKLIN 5-805: Build new pedestrian bridge at location of old Broadway Bridge
C 2024 $3.5m
FULTON: Improve Purchase Parkway from the KY/TN state line to the U52 interchange, including the KY 339 interchange reconstruction
R/U/C 2023-28 $13.5m, $20m
GARRARD: Construct West Lancaster bypass and improve US 27 from West Lancaster bypass to KY 34
D/R/U/C 2022-28 $30.3m, $23m
GREENUP 9-8509: Reconstruct KY 207 from KY 67 Industrial Pkwy. to KY 693 in Flatwoods
R/U/C 2025-26 $52.8m
HARDIN 4-198: Extend Ring Rd. from Western Kentucky Pkwy. in Elizabethtown to I-65
D/R/U/C 2023-26 $33m
HENDERSON 2-1088: I-69 bridge over the Ohio River
D/R/U/C 2024-28 $120m, $60m
JEFFERSON 5-48: Widen I-71 from I-64 to Zorn Ave.
R/U/C 2024-27 $26m
JEFFERSON 5-804: Widen I-264 from Westport Rd. to I-71, including rebuilding US 42 interchange as a SPUI
C 2024-26 $60m
JESSAMINE 7-87: Complete east Nicholasville bypass from KY 39 to KY 169
C 2023 $19.6m
JESSAMINE 7-414: Rebuild KY 1980 Brannon Rd. from US 68 to US 27
U/C 2024-27 $22.7m
KENTON 6-162: This relates to the supplemental I-75-only bridge over the Ohio River between Covington and Cincinnati
D/R/U/C 2022-27 $180m, $720m, $250m, $150m
LAUREL 11-185: Improve US 25E (widen to four lanes?) from Knox/Laurel county line to KY 770
C 2024-25 $16.5m
LAUREL 11-147: Improve US 25E (widen to four lanes?) from KY 1006 to KY 2069
C 2025-26 $31.6m
LAUREL 11-8515: Improve connectivity between Corbin and London between KY 1006 and US 25E
D 2025 $2m
I know there was a project to widen US 25 between the two cities with maps produced. Is this part of that?
LAUREL 11-365: Widen Hal Rogers (Daniel Boone) Parkway from KY 30 to KY 192
R/U/C 2023-25 $12m
LAUREL 11-8909: Improve Hal Rogers Parkway to interstate standards from KY 192 to Laurel/Clay County line
D/R/U/C 2023-28 $37.6m
LAWRENCE 12-3 and 12-80112: Construct easterly road at Yatesville Lake state park between KY 3215 to KY 1185
R/U/C 2023-25 $30m
D/R/U/C 2023-26 $21m
LESLIE 11-8912 and 8913: Improve Hal Rogers Parkway to interstate standards from MM 36 to MM 44, and MM 44 to MM 51
D/R/U 2024-27 $22m, $18m
LETCHER 12-199: Reconstruct US 119 to four lanes including new flyover ramp at US 23 (replacing the last of the at-grade intersections there)
R/U/C 2025-27 $23m
LEWIS 9-231: New route in the vicinity of Vanceburg (Pollitt Ln. to KY 59)
D/R/U/C 2023-28 $47m
LEWIS 9-8807: Reconstruct KY 57 from KY 9 AA Highway to Fleming/Lewis county line
D/R/U/C 2023-26 $48.8m
LINCOLN: Reconstruct US 27 from Stanford to Lincoln-Garrard County Line
2022-28 $6.5m, $37m
LIVINGSTON: Widen US 60 from Tennessee River Bridge to Rudd-Spees Rd.
2025-26 $19.7m
LOGAN: Widen US 79 from Todd County to Russellville bypass
2024-28 $34.5m
LYON/CALDWELL: Relocate US 641 from US 62 at Eddyville to Lyon/Caldwell County, and from there to Fredonia
2023-28 $14.5m, $18.5
MADISON: Relocate KY 52 from Wallace Mill Rd. to Duncannon Rd. interchange at I-75
2024-26 $22.5m
MADISON: Widen US 25 from US 421 to Pumpkin Run
2022-24 $12.6m
MADISON: Widen KY 374 Speedwell Rd. from US 25 to US 421
2023-26 $51m
MAGOFFIN: Extend Mountain Parkway corridor from US 460 to Magoffin/Floyd County along KY 114
2022-26 $57m
MAGOFFIN/JOHNSON: Improve US 460 from KY 114 to US 23
2023-27 $175.6m
MARION: Extend KY 2154 bypass from KY 208 to KY 49
2022-28 $29.7m
MASON: Extend (second) Maysville bypass from US 68 near Washington to KY 11. Will be fully controlled.
2023-28 $41.5, $41m
MORGAN: West Liberty bypass, construct new route from US 460 at KY 2498 to US 460 at KY 172
2024-28 $25m
NELSON: New route between US 62 and KY 245 west of Bardstown (US 31E?)
2022-27 $15m
NELSON: Major improvements on US 150 from Bluegrass Parkway to Nelson/Washington County
2023-28 $37.5m
OLDHAM: Widen I-71 to six lanes from KY 329 to KY 53
2023-28 $39.7m, $48.8m
OLDHAM: Construct new I-71 interchange between KY 393 and KY 53
2022 $12m
PERRY: Widen KY 15 from Bonnyman to KY 28
2024-27 $69m
PERRY: Rebuild Exit 55 on the Hal Rogers Parkway; serves KY 451
2023-27 $14m
PIKE: US 460 from KY 195 to Dunleary Hollow
2024-26 $32m
PULASKI: Improve KY 90 between Wayne County line and Cumberland River
2023-26 $35m
This seems like it won't involve major widening but spot improvements and driveway elimination (hopefully)
ROCKCASTLE: Widen KY 461 from US 150 to US 25
2023-26 $20m
ROWAN: Extend KY 801 from KY 158 at Sharkey to KY 32 near Fleming/Rowan County
Planning 2028 $250k
ROWAN/FLEMING: Widen KY 801 from MMRC near I-64 to KY 158
2023-25 $22.4m
RUSSELL: Relocate US 127 from KY 1730/Manntown Rd. to Cumberland River
2022 $54m
SCOTT/BOURBON: Rebuild US 460 from Russell Cave Rd. to I-75
2022-24 $30m
SHELBY/FRANKLIN: Widen I-64 from KY 395 to KY 151
2022-28 $31.5m
SPENCER/JEFFERSON: Widen KY 55/155 to 2+1 - two lanes with an alternating passing lane
2024-27 $17m
WARREN: Widen US 31W from Warren/Simpson County to Buchanon Park
2022-24 $20m
WAYNE/MCCREARY: Make KY 92 a scenic route between Monticello and Stearns
Planning 2022 $1.5m
WAYNE: Improve KY 90 between KY 90X/KY 1275 and KY 3106 near Monticello
2023-25 $31m
This seems like three or four-lane widening.
WHITLEY/LAUREL: Widen I-75 between MM 20 to MM 28.8 US 25E at Corbin
2022-27 $63.5m, $46/5m
WOLFE: Widen Mountain Parkway to four lanes from KY 191 to KY 205
2022 $55m
WOODFORD: Widen US 60 Versailles Rd. from Bluegrass Parkway to Pisgah Pike
2023-28 $6.2m
WOODFORD: Access management from Lexington Rd. at Woodford Feed in Versailles to Marsailles Dr.
2023-26 $4m, $4.4m
WOODFORD/JESSAMINE: Improve KY 169 from Clear Creek Rd. in Jessamine County (near Nicholasville) to KY 1967 in Woodford County
2023-26 $18.7m