I see right now a big plan is underway to make I-83 more interstate than the pre interstate freeway of US 230 Bypass, it’s former route before the Interstates came into play.
If you live in the area you have seen the replacements of both US 22 and Union Deposit Road overpasses to allow for more lanes on the freeway. The original bridges looked like the Derry Street overpass over US 322 which were built for only four lanes, but now six lanes plus auxiliary lanes are needed for I-83.
The project is in five phases as more is to come including possibly building a toll bridge in place of the South Bridge across the Susquehanna River instead of giving it a replacement out of tax dollars. Then there are other widening concerns that will soon be addressed as well.
My interest in it is what about the Eisenhower Interchange which I do not see as part of this as with a six lane I-83 through there would need a complete overhaul to handle the extra lanes. Maybe it’s included but not worth talking about, so that is why. Anyway glad to see PennDOT moving into the future instead of the past.