Regional Boards > Northeast

I-83 Improvements

<< < (2/5) > >>

froggie:
SPUIs may not be necessary, especially at Union Deposit.  And SPUIs have far higher costs than a more traditional interchange.

Roadsguy:
A SPUI would definitely be warranted at Union Deposit, but I spoke with someone from the project a while ago who told me it was just cut because of the cost of the more complex bridge and re-grading the ramps.

As for the project status, all three through lanes are open in the southbound direction! The right through lane and auxiliary lanes aren't fully paved yet, but all the stop sign merges are gone in that direction.

74/171FAN:
PennDOT - District 8 News: NB I-83 Traffic to be Placed in Final Configuration at Widening and Reconstruction Project Near Harrisburg

74/171FAN:
Live Now: I-83 South Bridge Project On-Demand Virtual Public Meeting 

Materials are available through November 24, 2021.

PennDOT News Release:  PennDOT - District 8 News: PennDOT Invites Public to Comment on I-83 South Bridge Replacement Project

74/171FAN:
PennDOT - District 8 News: Nighttime Lane Restrictions on I-83 at Widening and Reconstruction Project Near Harrisburg

Navigation

[0] Message Index

[#] Next page

[*] Previous page

Go to full version