News:

The AARoads Wiki is live! Come check it out!

Main Menu

I-35E four lane stretch

Started by longhorn, June 27, 2019, 09:39:20 AM

Previous topic - Next topic

longhorn

Are there plans to expand the four lane stretch between the I-35E/35W split north of hillsboro to the 6 lane expanded concrete section some 7 miles away?

https://www.google.com/maps/@32.1160145,-96.9911424,938m/data=!3m1!1e3


MaxConcrete

#1
Bids were received in May with the lowest bid $133 million. So work should be underway soon.

http://www.dot.state.tx.us/insdtdot/orgchart/cmd/cserve/bidtab/05073001.htm


I reviewed the plans online when they became available a few months ago. The design is similar to adjacent section, 3x3 concrete with full shoulders and a central concrete barrier. The median will be paved, so there will no longer be a median.
www.DFWFreeways.com
www.HoustonFreeways.com



Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.