AARoads Forum

Please login or register.

Login with username, password and session length

Author Topic: Dallas: phase 1 of freeway removal, bids opened  (Read 3658 times)

MaxConcrete

  • *
  • Online Online

  • Posts: 961
  • Location: Houston, TX
  • Last Login: Today at 11:26:45 PM
Dallas: phase 1 of freeway removal, bids opened
« on: February 10, 2016, 10:27:25 PM »

Phase 1 will build a new section of freeway to replace the freeway which will be decommissioned. Lowest bid is Webber LLC at $104 million.
http://www.dot.state.tx.us/insdtdot/orgchart/cmd/cserve/bidtab/02093043.htm

Estimate    $100,034,951.91    % Over/Under    Company
Bidder 1    $103,886,639.99    +3.85%       WEBBER, LLC
Bidder 2    $105,477,598.90    +5.44%       MCCARTHY BUILDING COMPANIES, INC.
Bidder 3    $111,047,111.09    +11.01%            BALFOUR BEATTY INFRASTRUCTURE, INC.
Bidder 4    $115,203,739.17    +15.16%            ZACHRY CONSTRUCTION CORPORATION
Bidder 5    $122,442,040.26    +22.40%            MCM

Project web site
http://smwrightproject.org/
The video shows the planned boulevard to replace the freeway. It looks like it will be one of the nicest streets in Dallas.



This project will displace the Ghetto Club. Does anyone know if it has already been cleared? More photos www.dfwfreeways.com/us175
« Last Edit: February 10, 2016, 10:49:42 PM by MaxConcrete »
Logged

Anthony_JK

  • *
  • Offline Offline

  • Posts: 1632
  • Age: 58
  • Location: Lafayette, Louisiana
  • Last Login: Today at 09:36:53 PM
Re: Dallas: phase 1 of freeway removal, bids opened
« Reply #1 on: February 11, 2016, 03:06:44 AM »

So...how will they connect the new US 175 freeway with I-45 going south?? Through Spur 310??
Logged

froggie

  • *
  • Offline Offline

  • Posts: 12620
  • Location: Greensboro, VT
  • Last Login: Today at 11:07:57 PM
    • Froggie's Place
Re: Dallas: phase 1 of freeway removal, bids opened
« Reply #2 on: February 11, 2016, 06:59:48 AM »

There's no connection today.
Logged

wxfree

  • *
  • Offline Offline

  • Posts: 1407
  • Age: 2
  • Location: Over there
  • Last Login: March 10, 2023, 03:42:55 AM
Re: Dallas: phase 1 of freeway removal, bids opened
« Reply #3 on: February 11, 2016, 12:19:33 PM »

Looking at the map, there appears to be a ramp from US 175 to Lamar St. and ramps south from from Lamar St. to US 175 and I-45.  That's an improvement over the existing connections.  There's only a small area from which traffic needing such a connection could originate.  Even a small distance from the intersection, traffic to I-45 south is better off headed directly toward I-45 or toward I-635 or I-20.  Such a small trip-generating area probably doesn't warrant a direct connector.
Logged
All of my posts represent my personal opinions and the official views of any governmental agency that has good sense.

The Ghostbuster

  • *
  • Offline Offline

  • Posts: 3820
  • Age: 38
  • Location: Madison, WI
  • Last Login: Today at 11:02:56 PM
Re: Dallas: phase 1 of freeway removal, bids opened
« Reply #4 on: February 13, 2016, 02:09:32 PM »

So the new Interstate 45/US 175 interchange is only going to be a half interchange (no ramps North 45 to East 175/West 175 to South 45)?
Logged

MaxConcrete

  • *
  • Online Online

  • Posts: 961
  • Location: Houston, TX
  • Last Login: Today at 11:26:45 PM
Re: Dallas: phase 1 of freeway removal, bids opened
« Reply #5 on: February 13, 2016, 04:01:33 PM »

So the new Interstate 45/US 175 interchange is only going to be a half interchange (no ramps North 45 to East 175/West 175 to South 45)?

Yes, that appears to the case. I think they are just trying to support the existing traffic pattern, and keep costs low.

If the Trinity Parkway is built, it would extend westward over I-45. The path is faintly visible in the schematic. I would expect that connections between NB I-45 to WB Trinity Parkway, and EB Trinity Parkway to SB I-45 would be needed. However, I don't see provisions for those connections in the schematic.

noelbotevera

  • *
  • Offline Offline

  • Posts: 3306
  • Now at a Redbox kiosk near you!

  • Age: 18
  • Location: Philippines
  • Last Login: February 08, 2023, 01:44:34 AM
Re: Dallas: phase 1 of freeway removal, bids opened
« Reply #6 on: February 13, 2016, 04:34:55 PM »

So the new Interstate 45/US 175 interchange is only going to be a half interchange (no ramps North 45 to East 175/West 175 to South 45)?

Yes, that appears to the case. I think they are just trying to support the existing traffic pattern, and keep costs low.

If the Trinity Parkway is built, it would extend westward over I-45. The path is faintly visible in the schematic. I would expect that connections between NB I-45 to WB Trinity Parkway, and EB Trinity Parkway to SB I-45 would be needed. However, I don't see provisions for those connections in the schematic.
Trinity Parkway got canceled months ago. That's why those provisions for the connections aren't in the schematic.
Logged

 


Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.