Houston: first construction on Grand Parkway section C

Started by MaxConcrete, January 18, 2016, 10:33:31 AM

Previous topic - Next topic

MaxConcrete

Bids are due January 19 for the first work on the Grand Parkway section C. Section C is southwest of Houston, from US 59/IH 69 to SH 288.

The work is very minimal, just a short section of southbound frontage road south of US 59. But it is a start, which suggests more work may be in the pipeline. Info below from http://www.civcastusa.com/projectdetails.aspx?projectID=7732  (registration required)

Scope: The Construction of the Fort Bend Grand Parkway Toll Road, Segment C, Section C-1 southbound frontage road and Sansbury Road intersection from IH 69/ US 59 to Rabbs Bayou.

Estimate: $6.1 million

Agency: Fort Bend Grand Parkway Toll Road Association

Bid details:     1/19/2016, 02:00 PM CST, Mike Stone Associates, Inc., 19875 Southwest Freeway, Suite 270, Sugar Land, TX, 77479

 
www.DFWFreeways.com
www.HoustonFreeways.com


MaxConcrete

The low bid was $5.2 million by James Construction.

This is a small project with a short schedule. The schedule is to have the lanes open by Thanksgiving 2016, and all work done by the end of 2016.

Work is already underway on the relocation of two high voltage transmission towers near US 59.
www.DFWFreeways.com
www.HoustonFreeways.com

nolia_boi504

Looking at the plans it seems like the purpose of this project is to build SB feeders from 59 thru Sansbury. NB lanes seem to be untouched, but seem like will be moved in a separate project. The roadway currently curves around a Burger King and an Exxon station, which will probably need to be demo'd when the overpass and flyovers get built in the future.

Nexus 5X




Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.