AARoads Forum

Regional Boards => Mid-South => Topic started by: Stephane Dumas on April 05, 2010, 11:08:43 AM

Title: Northeast Beltway 8/Sam Houston parkway
Post by: Stephane Dumas on April 05, 2010, 11:08:43 AM
looks like HCTRA will built the toll lanes of the northeast section of Beltway8 https://www.hctra.org/about_construction/sam-houston-tollway-northeast/  strangely the pictures of the bridges over US-90/Crosby Freeway are in PDF format. Here a link to the bridge supports, looking south from US 90  https://www.hctra.org/file_download/133/NE_Project_094.pdf
Title: Re: Northeast Beltway 8/Sam Houston parkway
Post by: FreewayDan on April 06, 2010, 02:43:49 PM
This new section of the Sam Houston Tollway is going to be EZ Tag only, just like the Westpark Tollway and the FBCTRA's Fort Bend Parkway Tollroad.  NO CASH, NO COINS, NO EXCEPTIONS!

Why can't HCTRA collect the tolls just like what the tollways in Austin, Dallas and Denver's E-470 are doing right now: video tolling.  Have a video camera take a picture of your rear license plate and pay for your toll by mail.

Title: Re: Northeast Beltway 8/Sam Houston parkway
Post by: Stephane Dumas on September 16, 2012, 07:36:07 PM
Sorry for dusting-off this old topic. ^^;

I spotted at the HCTRA website some proposed and planned projects:
-widening of the Houston Ship channel bridge by adding a second span, construction should begin for 2018
-complete interchange at the junction of Hardy Toll road https://www.hctra.org/about_construction/hardy-toll-road-interchange-at-beltway-8
Title: Re: Northeast Beltway 8/Sam Houston parkway
Post by: rte66man on September 17, 2012, 12:37:15 PM
Quote from: Stephane Dumas on September 16, 2012, 07:36:07 PM

I spotted at the HCTRA website some proposed and planned projects....
-complete interchange at the junction of Hardy Toll road https://www.hctra.org/about_construction/hardy-toll-road-interchange-at-beltway-8

How on earth are they going to squeeze that in?  VERY small ROW.

rte66man