Thread bump...
VDOT is planning a ribbon-cutting for the big bridge(s) at the state line, with KYTC providing support. No date has yet been set, but it will probably be this fall. Going to be a huge event, with the governors and applicable federal officeholders (senators and representatives) from both states. Tentative plan is to hold it near the state line, which is the northwestern end of the bridge, with an inclement weather location indoors at Breaks Interstate Park. It's contingent on Kentucky finishing the access ramp from KY 80 near Elkhorn City to the segment that's already been built on this side of the state line. This is near the KY 1353 intersection, for those who attended my meet with this project as a focal point. We saw the bridges that had been built over KY 1353 but weren't yet open to traffic.