https://ftp.txdot.gov/pub/txdot/commission/2021/0729/7-presentation.pdf

The winning proposer was announced at today's TxDOT meeting. This project will expand frontage roads, add one lane in each direction (for a total of 8), and retain the existing two managed lanes with enough pavement to add two more managed lanes.
http://www.keepitmovingdallas.com/sites/default/files/docs/3.%20I-35E%20Phase%202%20Project%20Proposed%20Typical.jpg

Proposals submitted
Archer Western and Sundt
Lone Star Contractors (Flour, Austin Bridge and Road)
North Tarrant Infrastructure 35E (Ferrovial Agroman and DBW/Webber)

Winner
Lone Star Constructors
Construction: $642 million
Maintenance: $13.3 million
Total: $655 million

This project was listed at $700, so the winning price appears to be around 6% below budget.

As usual with design-build awards, no other information is available.
www.DFWFreeways.com
www.HoustonFreeways.com


Plutonic Panda

Article on this from CE:

https://www.constructionequipmentguide.com/transportation-commission-selects-jv-for-i-35-phase-ii/53714

For some reason I was under the impression that the end result of phase two would result in 8 GP lanes and four tolled. Any word on when the additional tolled lanes will begin? I also hope this will result in 12ft lanes instead of 11ft.



Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.