43 projects are up for bids at KDOT on December 15, including two major projects on US 50 around Dodge City and into the territory out west.
Approved Bids announced 12/28/21
Approved Bids announced 1/27/22
December 2021:
Federal-Aid: (unless otherwise noted)
75-7 KA 5284-01: Addition of left-turn lanes at the intersection of US 75 and 260 Road and at 280 Road/K-246 at Sabetha. Herzog Contracting Corp., St. Joseph, Missouri, $5,414,193.56.
7-46 KA 5933-01: HMA overlay from Harold Street to just south of the K-10 interchange in Olathe. Superior Bowen Asphalt Company LLC, Kansas City,
Missouri, $4,729,867.13
187-66 KA 3875-01: Replace the K-187 bridge over Weyer Creek 2.78 miles north of the K-187/K-9 junction.
187-66 KA 3876-01: Replace the K-187 bridge over Nemaha River drainage 5.53 miles north of the K-187/K-9 junction.
Projects to be let together and intended to be constructed together with a common detour via K-9, K-63, and US 36.
Reece Construction Co., Inc., Salina, $2,360,961.91
31-99 KA 6316-01: 1-inch milling and 1.5-inch overlay on K-31 in Wabaunsee County.
195-99 KA 6339-01: 1-inch milling and 1.5-inch overlay on the K-195 spur from K-31 to Harveyville (Non-FA)
Shilling Construction Co. Inc., Manhattan, $1,546,390.17
128-45 KA 3947-01: Replace the K-128 bridge over White Rock Creek located 0.3 miles north of Burr Oak. Traffic to be carried via a shoo-fly detour. King Construction Company Inc. & Subsidiaries, Hesston, $2,750,542.65.
106 KA 6106-01: Signage replacement on US 56, US 77, K-4, and K-177 in and around Morris County. KOMO Construction LLC / DBA A&H Co., Elko New Market, Minnesota, $477,255.50
27-12 KA 3933-01: Replace the K-27 bridge over North Fork Beaver Creek located 1.29 Miles North of the Cheyenne/Sherman County Line. King, $2,329,185.70.
183-26 KA 5418-01: Reconstruct Vine Street (US 183) in Hays from the US 183 Bypass to 12th Street as a 5-lane urban arterial. Smoky Hill LLC, Salina,
$3,532,366.10
9-69 KA 6310-01: 2.5-inch milling and 4-inch overlay from the Decatur/Norton county line to US 283. Venture Corp., Great Bend, $5,574,599.20
70-84 KA 6279-01: Lighting upgrade at I-70 exit 199, and at the K-18/K-232 junction near Lucas. Phillips Southern Electric Company Inc., Wichita, $221,417.00
83-97 KA 6308-01: 2.5-inch milling and 4-inch overlay on US 83 from US 24 to the Thomas/Sheridan County Line. McCormick Excavation & Paving LLC, Stratton, Colorado, $4,504,875.67.
39-6 KA 3912-01: Replacement of the K-39 bridge over Flat Rock Creek 3.08 miles east of the Bourbon/Neosho County Line. Detour via US 59, US 54, and K-3. Killough
Construction Inc., Ottawa, $722,897.60
3-6 KA 6303-01/3-54 KA 6449-01: 1-inch milling and 2-inch overlay on K-3 between US 54 and K-31 in Bourbon and Linn Counties (KA-6449-01 in Linn County is Non-FA) Cornejo & Sons LLC, Wichita, $2,066,429.82.
35-70 KA 6075-01/35-30 KA 6076-01: 1-inch PCC milling and 3-inch HMA overlay from MP 163.2 to MP 179 in Osage and Franklin Counties.
35-70 KA 6126-01: Repair the northbound I-35 bridge over Rock Creek at MP 163.2. Bettis Asphalt & Construction Inc., Topeka, Kansas, $20,252,759.15
400-50 KA 6304-01: 1.5-inch milling and 1.5-inch HMA overlay from the Montgomery/Labette County Line to just west of Jackson Road near Parsons. Cornejo & Sons, $1,515,236.03.
68-61 KA-2373-02: Add Turn lanes to the intersection of K-68 and Somerset Road and construct a new access road to serve the Louisburg Cider Mill.
68-61 KA 2373-03: Reconstruct K-68 between US 169 and US 69. Add turn lanes and frontage roads.
Miles Excavating Inc., Basehor, $18,824,344.89.
68-61 KA 6230-01: 1.5-inch mill and 1.5-inch HMA overlay from US 69 to the Missouri State Line. Bettis, $1,197,179.65
77-8 KA 6132-01: Repair the US 77 bridge over the West Branch Walnut River in El Dorado. PBX Corporation & Subsidiary, Sapulpa, Oklahoma, $260,766.78.
18 KA 6305-01: 1.5-inch milling and 2-inch HMA overlay on US 166 from Arkansas City to the Cowley/Chautauqua County Line and 0.5-inch mill and 2-inch overlay on K-15 from the Oklahoma State Line to US 166
77-18 KA 6333-01: Milling and HMA overlay (unspecified depth) on US 77 from Summit Street to Madison Avenue in Arkansas City. Cornejo & Sons, $7,183,574.81
96-87 KA 6231-01: Concrete patching on K-96 from Webb to Kellogg. Prado Construction LLC, Valley Center, $2,791,865.53
50-35 KA 2383-01/50-29 KA 2384-01: Widen to a 4-lane expressway from Cimarron to Wyatt Earp Boulevard in Dodge City. Koss Construction Colorado, Topeka, $86,833,640.25
23-51 KA 6311-01: 1.5-inch milling and 1.5-inch HMA overlay on K-23 in Lane County.
96-51 KA 6334-01 1.5-inch milling and 1.5-inch HMA overlay on K-96 in Dighton (Non-FA)
Venture, $5,561,201.00
Federal-Aid, Local project:
44 C 4983-01: Reconstruct a portion of Wellman Road near 142nd Street south of Winchester. Leavenworth Excavating & Equipment Company
Inc. and Affiliate, Leavenworth, $380,102.22
Non-FA:
36-22 KA 6336-01: Surface Recycle and Chip Seal on US 36 from Troy to Wathena. Dustrol Inc., Towanda, Kansas, $768,205.51.
120-22 KA 6337-01: 2.5-inch milling and 2-inch overlay on the entire length of K-120 in Doniphan County. Herzog, $1,368,463.98
7-6 KA 6486-01: Chip Seal from K-31 to the Bourbon/Linn County Line. Vance Brothers Inc. and Subsidiary, Kansas City, Missouri, $45,861.83.
7-6 KA 6487-01: Chip Seal from US 54 to K-31. Vance Brothers, $316,143.10.
69-61 KA 6055-01: 1-inch PCC milling and 3-inch HMA overlay from MP 110.2 to MP 121.0. Bettis, $13,286,740.10
31-6 KA 6489-01: Chip Seal from K-7 to US 69. Vance Brothers, $187,063.96
7-54 KA 6488-01: Chip Seal from the Bourbon/Linn County line K-52 near Mound City. Vance Brothers, $211,591.12
160-63 KA 6389-01: 1.5-inch milling and 1.5-inch HMA Overlay from Independence to US 169. Cornejo & Sons, $907,756.12
4 KA 6289-01: 1/2-inch milling and 2-inch HMA overlay on K-2 in Barber County; 1.5-inch milling and 1.5-inch HMA Overlay on K-8 in Barber County. Cornejo & Sons, $3,390,836.04.
106 KA 6378-01: Rumble strip grinding at various locations in Butler, Sedgwick, and Cowley Counties.
83-86 KA 3252-01: 2-inch milling and 2-inch HMA Overlay from Scott City to the Scott/Logan County Line. Venture, $5,451,392.04.