Approved Bids Announced 11/2/16
Appreved Bid Announced 11/30/16
October, 2016
3 TE-0411-01 - Highway 73 Trail: New multi-use path along the east side of US 73/K-7 from Raven Hill Road to US 59 in Atchison. Kansas Heavy Construction LLC, Shawnee, Ks, $1,278,916.74
435-46 KA-3993-01 - Reconstruction of I-435 between Quivera and Metcalf, and repair of the bridges at Metcalf. When they added lanes as part of previous projects, they did not re-construct the existing lanes, which are now showing signs of wear. 10-12 inch PCCP on a 4 inch base, 6 inch subgrade. Intersting BOS work. Clarkson Construction Company, Kansas City, Mo, $16,337,094.28.
46 N-0632-01 - Bridge repair and pavement rehab on Shawnee Mission Parkway over the BNSF Fort Scott Sub and Carter Avenue/Merriam Drive. Comanche Construction Inc. & Subsidiary, Shawnee Mission, Ks, $2,425,574.90.
23-32 KA-3082-01: Bridge replacments on K-23 over Big Creek and Spring Creek between Grainfield and Gove. Detour via K-4, US 83, and I-70. L & M Contractors Inc., Great Bend, Ks, $1,288,271.15.
91 TE-0418-01: Brick street rehabilitation for the 1000 block of Main in Goodland. Miller Construction Services LLC, Goodland, Ks, $472,172.60
69-6 KA-1553-02: 4 lane upgradable expressway from the Crawford County line to the start of the existing 4 lane segment of US 69 south of Fort Scott at Grand Road. Includes shelf plans for freeway upgrade. Koss Construction Co., Topeka, Ks, $20,354,814.87
78 TE-422-01: Streetscape improvements in the 300 and 400 block of Main in Hutchinson APAC Kansas Inc. Shears Division, Hutchinson, Ks, $1,422,184.22.
15-87 KA-4226-01: Traffic signal improvements on K-15 at MacArthur, 47th, 63rd, and 71st. Red balls on protected-only left turn signals replaced with red arrows. I show doghouse signals on 63rd being replaced with a five-section vertical, however, it looks like they should be FYAs. I also show the doghouse signals on 47th being replaced with 5-section vertical signals, but those signals appear to be a shared face. Phillips Southern Electric Company Inc., Wichita, Ks, $129,888.00
87 N-606-02: Intersection improvement at 53rd and Broadway in Park City. This project will have doghouse signals as shared faces. Cornejo & Sons LLC, Wichita, Ks, $899,391.17.
3 C-4706-01: Bridge replacement on old US 73 south of Atchison. WCI Inc., Paola, Ks, $433,271.70.
105 N-0636-01: "12th and 10th Street Bikeway" Adding bike lanes and Shared bike lane markings from the 12th Street Bridge over the Kansas River to 10th and Quindaro in KCK. (3rd attempt at this letting) RF Beachner Contractors LLC, Pittsburg, Ks, $747,555.60.
53 C-4699-01: Bridge replacement in Lincoln County L & M Contractors Inc., Great Bend, Ks, $522,724.60.
64 C-4694-01: Bridge replacement over the Neosho near Parkerville. Reece Construction Company Inc., Scandia, Ks, $427,732.72.
101 C-4697-01: Bridge replacement over Camp Creek west of Washington. King Construction Company Inc. and Subsidiaries, Hesston, Ks, $433,195.83.
104 C-4696-01: Bridge replacement over Brazell Creek west of Batesville. King Construction Company Inc. and Subsidiaries, Hesston, Ks, $562,196.90
87 TE-432-01: New Bridge for a multi-use path adjacent to Meridian Avenue over the Big Ditch.
96 C-4701-01: Bridge replacement northeast of Conway Springs. King Construction Company Inc. and Subsidiaries, Hesston, Ks, $406,100.80.