PA - US 15 Southbound Lanes Open Near Trout Run
« on: November 18, 2009, 08:55:16 PM »

Conversion of US 15 to Interstate 99 took another step yesterday when PennDOT opened the rebuilt southbound lanes on Steam Valley Mountain in Lycoming County.  Work will not be complete on that entire section of US 15 until Fall 2010.

PennDOT District 3-0
WNEP-TV Scranton
Logged

mightyace

  • *
  • Offline Offline

  • Posts: 3235
  • Age: 58
  • Last Login: October 04, 2012, 01:36:29 PM
    • My Flickr Photos
Re: PA - US 15 Southbound Lanes Open Near Trout Run
« Reply #1 on: November 18, 2009, 09:32:09 PM »

While some parts of that section were quaintly beautiful, it definitely was not the safest road.  Even in a car, I was very careful driving that stretch.  The improvements are much needed.

I-99 may stink as a designation but if this is what it took to rebuild that section of highway, I'm all for it!
Logged
My Flickr Photos: http://www.flickr.com/photos/mightyace

I'm out of this F***KING PLACE!

treichard

  • *
  • Offline Offline

  • Posts: 187
  • Last Login: June 30, 2014, 10:51:02 PM
    • Clinched Highway Mapping
Re: PA - US 15 Southbound Lanes Open Near Trout Run
« Reply #2 on: December 01, 2009, 02:29:15 PM »

I'd love to see some pics of this new construction. The signing/roadway plans are on PennDOT's ECMS web site, so you can see the two interchanges for PA 184 and Cogan Station, but that's nothing like seeing some color photos.

Are the two interchanges completed aside from one of the two mainline roadways?
« Last Edit: December 01, 2009, 02:33:20 PM by treichard »
Logged
Map your cumulative highway travel
Clinched Highway Mapping
http://cmap.m-plex.com/

Alps

  • y u m
  • *
  • Offline Offline

  • Posts: 15356
  • Elimitante the truck trarffic,

  • Age: 40
  • Location: New Jersey
  • Last Login: Today at 12:40:54 AM
    • Alps' Roads
Re: PA - US 15 Southbound Lanes Open Near Trout Run
« Reply #3 on: December 01, 2009, 06:43:33 PM »

Finally, no more at-grades!  Given that US 15 does connect to I-180 currently, couldn't it be signed as I-99, or does that require connection to I-86 as well?  (At that point, there's really nothing stopping the signing of two pieces with a break in the middle.)

vdeane

  • *
  • *
  • Offline Offline

  • Posts: 13638
  • Age: 32
  • Location: The 518
  • Last Login: Today at 08:52:41 PM
    • New York State Roads
Re: PA - US 15 Southbound Lanes Open Near Trout Run
« Reply #4 on: December 01, 2009, 11:07:43 PM »

I think the northbound lanes would have to get done first...

Though the existing portion just south of there could have been signed I-99 for years now.
Logged
Please note: All comments here represent my own personal opinion and do not reflect the official position of NYSDOT or its affiliates.

froggie

  • *
  • Offline Offline

  • Posts: 12618
  • Location: Greensboro, VT
  • Last Login: March 26, 2023, 11:14:36 PM
    • Froggie's Place
Re: PA - US 15 Southbound Lanes Open Near Trout Run
« Reply #5 on: December 02, 2009, 08:39:40 AM »

FHWA generally requires "logical termini" for signing Interstates.  In this case, you'd probably need completion through Trout Run since the next logical termini to the north would be US 6 at Mansfield....that being the next road on the NHS that US 15 intersects.
Logged

hbelkins

  • *
  • *
  • Offline Offline

  • Posts: 18695
  • It is well, it is well, with my soul.

  • Age: 61
  • Location: Kentucky
  • Last Login: Today at 01:25:37 PM
    • Millennium Highway
Re: PA - US 15 Southbound Lanes Open Near Trout Run
« Reply #6 on: December 02, 2009, 11:35:36 AM »

I'd love to see some pics of this new construction. The signing/roadway plans are on PennDOT's ECMS web site, so you can see the two interchanges for PA 184 and Cogan Station, but that's nothing like seeing some color photos.

Are the two interchanges completed aside from one of the two mainline roadways?

I have some photos from the area, taken back in the spring, at http://www.millenniumhwy.net/2009_State_College_Day_2/index.html but there are scant few construction photos on that page.
Logged


Government would be tolerable if not for politicians and bureaucrats.

vdeane

  • *
  • *
  • Offline Offline

  • Posts: 13638
  • Age: 32
  • Location: The 518
  • Last Login: Today at 08:52:41 PM
    • New York State Roads
Re: PA - US 15 Southbound Lanes Open Near Trout Run
« Reply #7 on: December 02, 2009, 03:47:49 PM »

FHWA generally requires "logical termini" for signing Interstates.  In this case, you'd probably need completion through Trout Run since the next logical termini to the north would be US 6 at Mansfield....that being the next road on the NHS that US 15 intersects.


I-86 has ended at wherever the first non-standard section begins since it was first signed.  Currently this means that the portion east on Binghamton ends at NY 79 (apparently something must be wrong with the road after that, but I can't think of anything other than the at-grade intersections past exit 84).
Logged
Please note: All comments here represent my own personal opinion and do not reflect the official position of NYSDOT or its affiliates.

mightyace

  • *
  • Offline Offline

  • Posts: 3235
  • Age: 58
  • Last Login: October 04, 2012, 01:36:29 PM
    • My Flickr Photos
Re: PA - US 15 Southbound Lanes Open Near Trout Run
« Reply #8 on: December 02, 2009, 07:35:12 PM »

Since the I-99 designation is legislatively defined, the law has to be amended for adding more miles as I think it did for the extension to I-80.

IMHO I think the designation will work its way north as non-freeway and other substandard sections of US 220 get upgraded as well as the high-speed I-80/I-99 interchange.

<sarcasm>
Anything else would result in two or more I-99 segments.  Do we really need that?  :no:  :pan:
</sarcasm>
« Last Edit: December 03, 2009, 03:28:58 PM by mightyace »
Logged
My Flickr Photos: http://www.flickr.com/photos/mightyace

I'm out of this F***KING PLACE!

treichard

  • *
  • Offline Offline

  • Posts: 187
  • Last Login: June 30, 2014, 10:51:02 PM
    • Clinched Highway Mapping
Re: PA - US 15 Southbound Lanes Open Near Trout Run
« Reply #9 on: December 02, 2009, 11:58:27 PM »

Logical termini are likely to factor in, but I-99 already doesn't follow that rule near Bellefonte.  Perhaps it should?

There are many precedents  having multiple pieces of an under-construction Interstate highway (I-69, I-74, I-86 to name a few).   In a couple years, there will be completed sections of I-99 that are 85 and 74 miles in length, each with a substandard connection at one end.  If only one section is signed as I-99, should it be the southern section just because it was finished first, or should it be moved up to the northern section? Both choices seem suboptimal, but signing both has sense.

Will the Fry Brothers turkey ranch/restaurant in Steam Valley appear on  blue FOOD signs for the PA 184 exit?
Logged
Map your cumulative highway travel
Clinched Highway Mapping
http://cmap.m-plex.com/

Mr_Northside

  • *
  • Offline Offline

  • Posts: 1275
  • "Oh god... They'll know! They'll know!"

  • Age: 44
  • Location: Woods Run (Northside), Pittsburgh, PA
  • Last Login: Today at 05:24:33 PM
    • Currently playing washboard in Ye Olde Royal Shithouse Players
Re: PA - US 15 Southbound Lanes Open Near Trout Run
« Reply #10 on: December 03, 2009, 09:16:03 AM »

Anything else would result in two or more I-99 segments.  Do we really need that?

I suspect that that's what we're going to get.  (I don't really have a problem with it)
I suppose once (if) that happens, there will be a more noticeable "missing link" that might help with getting the funding to upgrade the remaining sections to complete the gap.
Logged
I don't have opinions anymore. All I know is that no one is better than anyone else, and everyone is the best at everything

vdeane

  • *
  • *
  • Offline Offline

  • Posts: 13638
  • Age: 32
  • Location: The 518
  • Last Login: Today at 08:52:41 PM
    • New York State Roads
Re: PA - US 15 Southbound Lanes Open Near Trout Run
« Reply #11 on: December 03, 2009, 01:32:02 PM »

Yeah, I don't expect the US 220 upgrades to happen anytime soon otherwise.

Is the US 15/I-180/US 220 interchange really substandard?  It's not up to the task of handling US 220 to US 15 as the through route, but I can't think of anything else wrong with it.  It's actually very similar to the I-86/I-390 interchange.
Logged
Please note: All comments here represent my own personal opinion and do not reflect the official position of NYSDOT or its affiliates.

mightyace

  • *
  • Offline Offline

  • Posts: 3235
  • Age: 58
  • Last Login: October 04, 2012, 01:36:29 PM
    • My Flickr Photos
Re: PA - US 15 Southbound Lanes Open Near Trout Run
« Reply #12 on: December 03, 2009, 03:26:52 PM »

Anything else would result in two or more I-99 segments.  Do we really need that?
I suspect that that's what we're going to get.  (I don't really have a problem with it)

I was trying to be sarcastic.  (I'll add the sarcasm tag back on the original post!)

I suppose once (if) that happens, there will be a more noticeable "missing link" that might help with getting the funding to upgrade the remaining sections to complete the gap.

Of course, "back in the day" when the interstate system was being built, gaps were common.

IIRC During construction, I-80 had as many as four or five separate pieces.
« Last Edit: December 03, 2009, 03:29:33 PM by mightyace »
Logged
My Flickr Photos: http://www.flickr.com/photos/mightyace

I'm out of this F***KING PLACE!

rickmastfan67

  • The Invisible One
  • *
  • *
  • Offline Offline

  • Posts: 3131
  • I want I-67 in PA!!!!

  • Age: 38
  • Location: Pittsburgh, Pa, USA
  • Last Login: March 25, 2023, 07:11:26 AM
Re: PA - US 15 Southbound Lanes Open Near Trout Run
« Reply #13 on: December 05, 2009, 08:52:15 PM »

Is the US 15/I-180/US 220 interchange really substandard?

They were doing some reconstruction on that interchange when I was there back on 08/01/09.  They had all of the US-220 traffic in one lane both directions on the SB lanes of US-220 right after US-15 left.  But that must have been to replace the NB US-220 bridge over the river there.

Now, they do need to re-build the interchange's flyover from NB US-220 to NB US-15 so it can support high speed movements.  Once they do that, then that interchange should be as close to standards as possible. [Sat View]

I suppose once (if) that happens, there will be a more noticeable "missing link" that might help with getting the funding to upgrade the remaining sections to complete the gap.

Of course, "back in the day" when the interstate system was being built, gaps were common.

IIRC During construction, I-80 had as many as four or five separate pieces.

Look @ I-74 in NC right now.  It has 3 seperate segments.  And I-73 has 2 seperate segments.  However, you could make I-73 all one segment if NCDOT would be allowed to sign it a full Interstate between the two segments of I-73.
« Last Edit: December 05, 2009, 08:54:55 PM by rickmastfan67 »
Logged

vdeane

  • *
  • *
  • Offline Offline

  • Posts: 13638
  • Age: 32
  • Location: The 518
  • Last Login: Today at 08:52:41 PM
    • New York State Roads
Re: PA - US 15 Southbound Lanes Open Near Trout Run
« Reply #14 on: December 06, 2009, 02:17:17 PM »

While hardly ideal for through traffic, I don't see anything substandard about it, unless this is also substandard: http://maps.google.com/maps?client=firefox-a&hl=en&ie=UTF8&t=k&ll=42.388758,-77.382975&spn=0.009652,0.022638&z=16 or the fact that it's a through route makes it substandard.
Logged
Please note: All comments here represent my own personal opinion and do not reflect the official position of NYSDOT or its affiliates.

rickmastfan67

  • The Invisible One
  • *
  • *
  • Offline Offline

  • Posts: 3131
  • I want I-67 in PA!!!!

  • Age: 38
  • Location: Pittsburgh, Pa, USA
  • Last Login: March 25, 2023, 07:11:26 AM
Re: PA - US 15 Southbound Lanes Open Near Trout Run
« Reply #15 on: December 06, 2009, 04:54:42 PM »

Well, I-99 would become the through route in Williamsport.  And that makes it need the high-speed ramp.

vdeane

  • *
  • *
  • Offline Offline

  • Posts: 13638
  • Age: 32
  • Location: The 518
  • Last Login: Today at 08:52:41 PM
    • New York State Roads
Logged
Please note: All comments here represent my own personal opinion and do not reflect the official position of NYSDOT or its affiliates.

Duke87

  • *
  • Offline Offline

  • Posts: 5871
  • Age: 35
  • Location: Stamford, CT
  • Last Login: March 25, 2023, 11:51:00 PM
Re: PA - US 15 Southbound Lanes Open Near Trout Run
« Reply #17 on: December 06, 2009, 09:37:47 PM »

I guess the standards must have changed since this:
http://maps.google.com/maps?ie=UTF8&hl=en&hq=&hnear=Rochester,+Monroe,+New+York&ll=42.701708,-73.851256&spn=0.019207,0.045276&t=h&z=15

Or this.
Or this.
Or this.
Or this.
Or, hell, this.


All problems that need fixing, not justification for permitting another one!
Logged
If you always take the same road, you will never see anything new.

LeftyJR

  • *
  • Offline Offline

  • Posts: 137
  • Last Login: March 21, 2023, 08:07:08 PM
Re: PA - US 15 Southbound Lanes Open Near Trout Run
« Reply #18 on: December 07, 2009, 11:54:43 AM »

While hardly ideal for through traffic, I don't see anything substandard about it, unless this is also substandard: http://maps.google.com/maps?client=firefox-a&hl=en&ie=UTF8&t=k&ll=42.388758,-77.382975&spn=0.009652,0.022638&z=16 or the fact that it's a through route makes it substandard.


SB220 to NB15 is up to standards, I believe...

NB to NB is the problem, as it is one lane with a 30 MPH speed limit.
Logged

Mr_Northside

  • *
  • Offline Offline

  • Posts: 1275
  • "Oh god... They'll know! They'll know!"

  • Age: 44
  • Location: Woods Run (Northside), Pittsburgh, PA
  • Last Login: Today at 05:24:33 PM
    • Currently playing washboard in Ye Olde Royal Shithouse Players
Re: PA - US 15 Southbound Lanes Open Near Trout Run
« Reply #19 on: December 08, 2009, 10:09:47 AM »

I can't imagine rebuilding it to reflect I-99 as the "Thru Route" will be cheap given the geography of where it's at...
Logged
I don't have opinions anymore. All I know is that no one is better than anyone else, and everyone is the best at everything

hbelkins

  • *
  • *
  • Offline Offline

  • Posts: 18695
  • It is well, it is well, with my soul.

  • Age: 61
  • Location: Kentucky
  • Last Login: Today at 01:25:37 PM
    • Millennium Highway
Re: PA - US 15 Southbound Lanes Open Near Trout Run
« Reply #20 on: December 08, 2009, 01:43:21 PM »

I can't imagine rebuilding it to reflect I-99 as the "Thru Route" will be cheap given the geography of where it's at...


Leaving it as is would be similar to the movement one must take to stay on I-76 eastbound at the I-277 interchange in Ohio.
Logged


Government would be tolerable if not for politicians and bureaucrats.

 


Opinions expressed here on belong solely to the poster and do not represent or reflect the opinions or beliefs of AARoads, its creators and/or associates.