Regional Boards > Northeast
Philadelphia
jeffandnicole:
--- Quote from: Tonytone on November 18, 2022, 02:16:04 AM ---
--- Quote from: jeffandnicole on October 09, 2022, 01:28:02 AM ---
--- Quote from: famartin on October 09, 2022, 12:02:53 AM ---
--- Quote from: Alps on October 08, 2022, 11:22:44 PM ---
--- Quote from: famartin on October 08, 2022, 08:53:46 PM ---
--- Quote from: bluecountry on October 08, 2022, 07:21:00 PM ---When is the awful mess of I-95 south of Philly going to be finished?
--- End quote ---
You mean in Wilmington? Or the paving project in Delaware County?
--- End quote ---
Everything from the PA line north to Exit 8 has been a disaster. My take is because they have to maintain 3 lanes each way, it takes a very long time to get anything done.
--- End quote ---
PennDOT seems to run that project (and many paving projects) far less efficiently than other organizations, even PTC does much better.
--- End quote ---
I don't know what they've done other than mill and repave; certainly could be some other stuff going on. But it really is taking a long time to do whatever it is they're doing.
--- End quote ---
When's the last time you drove through? they took the old barrier wall out, put a new higher one in while doing concrete work on the bridges and fixing all guard rails, along with redoing the concrete sections under the roadway, and repaving.
Fixing all old signs, line strips, reflectors and all.
They basically did a whole major Rehab on the road from the Delaware line to The Airport. Something we can all attest that the portion through Chester needed badly, those broken green reflectors on the barriers were sad to look at now they are gone and the ones that have stayed have been replaced.
--- End quote ---
I was thru there last Friday. I'll take a look next time I'm in the area. Didn't notice the new concrete barrier and such so I'll eyeball it a bit more in the future.
74/171FAN:
PennDOT - District 6 News: Pump Station Improvement Planned Next Tuesday on I-676 in Philadelphia
odditude:
--- Quote from: 74/171FAN on November 22, 2022, 01:43:25 PM ---PennDOT - District 6 News: Pump Station Improvement Planned Next Tuesday on I-676 in Philadelphia
--- End quote ---
damn, and i was hoping for the second coming of the Vine St Canalway /s
74/171FAN:
(For US 1 and US 13) PennDOT - District 6 News: PennDOT Begins U.S. 13 South Bridge Replacement over U.S. 1 (Roosevelt Expressway) in Philadelphia
74/171FAN:
(For I-95) PennDOT - District 6 News: PennDOT Begins Project to Reconstruct I-95 at the Bridge Street Interchange in Philadelphia
Apparently the existing 27 point may eventually be marked as closed in Travel Mapping.
Navigation
[0] Message Index
[#] Next page
[*] Previous page
Go to full version