Plutonic Panda:
New Mexico DOT is asking for almost 900 million in additional funding. Hopefully they get it and fund much needed projects.

https://www.krqe.com/news/new-mexico/department-of-transportation-asks-for-additional-889-million-on-budget/

abqtraveler:

--- Quote from: Plutonic Panda on December 14, 2022, 11:55:57 AM ---New Mexico DOT is asking for almost 900 million in additional funding. Hopefully they get it and fund much needed projects.

https://www.krqe.com/news/new-mexico/department-of-transportation-asks-for-additional-889-million-on-budget/

--- End quote ---
Two projects at the top of my list that should be prioritized: the I-25/Montgomery interchange reconstruction, and straightening out the dreaded S-curve on I-25 through downtown Albuquerque.

DJStephens:

--- Quote from: abqtraveler on December 14, 2022, 03:47:57 PM ---
--- Quote from: Plutonic Panda on December 14, 2022, 11:55:57 AM ---New Mexico DOT is asking for almost 900 million in additional funding. Hopefully they get it and fund much needed projects.

https://www.krqe.com/news/new-mexico/department-of-transportation-asks-for-additional-889-million-on-budget/

--- End quote ---
Two projects at the top of my list that should be prioritized: the I-25/Montgomery interchange reconstruction, and straightening out the dreaded S-curve on I-25 through downtown Albuquerque.

--- End quote ---

Has anything started in SE NM, in the oil fields?  They did have some terrible "improvements" slated for US -285 SE of Carlsbad.  A THREE LANE poor boy.  Simply awful.  That stretch, all the way S to Pecos, should be Expressway grade, divided four lane.  Access maintained, for oil field interests and ranchers, but some full interchanges at certain intersections.  Crap.   Yes am aware Texas did a poor boy three lane, south of the NM state line, that is equally bad.  Clearview also, served on top.   

abqtraveler:

--- Quote from: DJStephens on December 18, 2022, 11:24:49 AM ---
--- Quote from: abqtraveler on December 14, 2022, 03:47:57 PM ---
--- Quote from: Plutonic Panda on December 14, 2022, 11:55:57 AM ---New Mexico DOT is asking for almost 900 million in additional funding. Hopefully they get it and fund much needed projects.

https://www.krqe.com/news/new-mexico/department-of-transportation-asks-for-additional-889-million-on-budget/

--- End quote ---
Two projects at the top of my list that should be prioritized: the I-25/Montgomery interchange reconstruction, and straightening out the dreaded S-curve on I-25 through downtown Albuquerque.

--- End quote ---

Has anything started in SE NM, in the oil fields?  They did have some terrible "improvements" slated for US -285 SE of Carlsbad.  A THREE LANE poor boy.  Simply awful.  That stretch, all the way S to Pecos, should be Expressway grade, divided four lane.  Access maintained, for oil field interests and ranchers, but some full interchanges at certain intersections.  Crap.   Yes am aware Texas did a poor boy three lane, south of the NM state line, that is equally bad.  Clearview also, served on top.

--- End quote ---
They've been working in phases on Highway 285 from Artesia to the TX state line, with the ultimate goal of 285 being 4 lanes along that entire stretch. From what I've seen thus far, they are "pulling a US-550" with 2 lanes in each direction, separated by a 3-foot rumble strip centerline rather than a physical median divider.

triplemultiplex:
No one cheaps out on a four-lane expansion like New Mexico!