AARoads Forum

Regional Boards => Great Lakes and Ohio Valley => Topic started by: Revive 755 on September 20, 2013, 09:04:51 PM

Title: Proposed FY 2014-2019 Transportation Improvement Program for IL
Post by: Revive 755 on September 20, 2013, 09:04:51 PM
http://www.dot.state.il.us/opp/hip1419/html/maintoc.htm (http://www.dot.state.il.us/opp/hip1419/html/maintoc.htm)

* It appears that may be some sort of widening in the works for I-72 between IL 4 and the MacArthur extension on the south side of Springfield, but only funded for plan development.

* Some possible progress for the US 67 expressway in Jersey County after 2014.

* Still acquiring land for the Gateway Connector.

* Three more miles of expressway for US 45 near Eldorado
Title: Re: Proposed FY 2014-2019 Transportation Improvement Program for IL
Post by: Joe The Dragon on September 20, 2013, 11:47:19 PM
CUMBERLAND FLYOVER
I-190 added lanes

I 90  I-190 TO ILL 43 added lanes are needed.

Any one have the I-190 planes? also the US 12 / 45 work (on going now) seems to be tied to that.
Title: Re: Proposed FY 2014-2019 Transportation Improvement Program for IL
Post by: Revive 755 on September 22, 2013, 02:00:59 PM
Quote from: Joe The Dragon on September 20, 2013, 11:47:19 PM
Any one have the I-190 planes? also the US 12 / 45 work (on going now) seems to be tied to that.

The last page of the of this study for O'Hare shows what I think is still proposed for I-190 at US 12/US 45:
http://www.faa.gov/airports/airport_development/omp/planning/MP/OAMP/Media/Section_V4-Alternatives-04.pdf (http://www.faa.gov/airports/airport_development/omp/planning/MP/OAMP/Media/Section_V4-Alternatives-04.pdf)

I believe the I-190 interchange with River Road was also have the SB to EB entrance loop replaced with a jughandle type turn.
Title: Re: Proposed FY 2014-2019 Transportation Improvement Program for IL
Post by: Joe The Dragon on September 22, 2013, 06:54:51 PM
the river road part is not in the airport plans
Title: Re: Proposed FY 2014-2019 Transportation Improvement Program for IL
Post by: Revive 755 on September 22, 2013, 09:33:34 PM
Quote from: Joe The Dragon on September 22, 2013, 06:54:51 PM
the river road part is not in the airport plans

That part's from memory of a display I saw several months ago - I haven't found an online map for the project.  Given the rumors that the 'Cumberland Flyover' may be changed to a much simpler C-D roadway, IDOT may be tinkering with the design for I-190 at River Road.
Title: Re: Proposed FY 2014-2019 Transportation Improvement Program for IL
Post by: ET21 on September 23, 2013, 01:00:58 PM
Quote from: Joe The Dragon on September 20, 2013, 11:47:19 PM
CUMBERLAND FLYOVER
I-190 added lanes

I 90  I-190 TO ILL 43 added lanes are needed.

Any one have the I-190 planes? also the US 12 / 45 work (on going now) seems to be tied to that.

Not only that, but the work is also due to the intersection redo of IL-19 at US 12/45, partly in preparation for the Elgin-O'Hare bypass
Title: Re: Proposed FY 2014-2019 Transportation Improvement Program for IL
Post by: ChiMilNet on January 18, 2014, 10:54:46 AM
Bumping this thread. I'm surprised no mention was made on here of the Circle Interchange reconstruction. This is obviously a big one upcoming. While it will be a huge mess and seems to be causing much controversy, it's much needed IMO.